In Half Moon Bay, building, plumbing, mechanical and electrical permits are issued by the city’s Building Division at City Hall, 501 Main Street (Building Services 650-726-8270). Applications, fees and inspections run through the Cloudpermit portal, and the counter is open Monday to Thursday. Because the city is entirely within the coastal zone, Planning reviews projects for a Coastal Development Permit, and every new home or ADU first needs a Measure D growth allocation. Fees follow the FY 2026–27 Master Fee Schedule, with plan check at 65% of the permit fee paid at submittal.
What requires a building permit in Half Moon Bay?
The city’s building FAQ says a permit is required for any new construction, demolition, remodeling, expansion, addition or repair to a structure, and lists examples many owners overlook: trellises, carports, sheds, skylights, covered patios, hot tubs, termite repairs and solar panels, along with additions, pools and kitchen and bathroom remodels. Work done without a permit is charged twice the normal permit fee and may have to be opened up for inspection.
Permit needed
- New homes, ADUs and additions
- Kitchen and bathroom remodels
- Decks over the exempt size, trellises, carports and covered patios
- Sheds over 120 square feet or 8 feet high, or with plumbing or power
- Re-roofs and skylights
- Solar panels and battery storage
- Pools and hot tubs
- Demolition and termite repairs
No building permit (city FAQ)
- One-story accessory buildings up to 120 square feet
- Fences up to 7 feet
- Retaining walls up to 4 feet with no surcharge
- Sidewalks and driveways (an encroachment permit is needed in the public right-of-way)
- Painting, papering, tiling, carpeting, cabinets and countertops
- Prefabricated pools under 24 inches deep
- Detached decks up to 200 square feet and 30 inches high that do not serve the exit door
Exemptions do not override zoning. Fences may be 3 feet high in a front setback or sight-distance area and 6 feet in a rear setback, and Planning asks to be contacted before you build one. Sheds of 120 square feet or less still need 5-foot rear and side setbacks; larger and taller sheds need a 10-foot rear setback. The FAQ’s exemption list is quoted from the 2022 residential code.
What Half Moon Bay decides and what the state holds
The city enforces the state codes through Title 14 (Building and Construction) of its Municipal Code and decides its own zoning, coastal permits under its Local Coastal Program, growth limits under Measure D, fees and construction hours. Its 2022 building electrification ordinance required new buildings to be all-electric; the city has paused enforcement of those all-electric provisions (Section 14.06) after recent legal developments but still encourages electric construction. Its ADU ordinance is being revised: in February 2026 the state housing department told the city the ordinance did not comply with state law, and in July 2026 draft amendments went to the state housing department and the Coastal Commission for preliminary review. Contractors are licensed by the state.
Short on time to read all of this?
Get a free quote →Half Moon Bay building department: who handles permitting
The Building Division regulates building, plumbing, mechanical and electrical installations, accessibility and energy compliance, and does damage assessments after disasters. It uses an outside consultant for building plan check. Depending on scope, plans are also reviewed by Planning, the Coastside Fire Protection District, the Coastside County Water District and Public Works. Planning issues Coastal Development Permits, use permits, variances, sign permits, subdivisions and tree removal permits.
| Detail | Information |
|---|---|
| Office | Building Division, City Hall, 501 Main Street, Half Moon Bay, CA 94019 |
| Phone | Building Services 650-726-8270; City Hall 650-726-8910 |
| building@halfmoonbay.gov | |
| Counter hours | Monday to Thursday 8:30 a.m. to 5 p.m.; City Hall is closed to the public on Fridays |
| Online | Cloudpermit (applications, fees, inspections); Symbium for residential solar and batteries |
| Inspection hotline (permits issued before February 7, 2025) | 650-726-8794 |
Half Moon Bay permit types
Most applications are filed online in Cloudpermit, where you can apply at any time, track status, message staff, request changes and book inspections. You can also apply at the counter on the city’s paper application, showing proof of an active Half Moon Bay business license, or email the application to building@halfmoonbay.gov if the counter cannot help. Contractors first register as a contractor in Cloudpermit and then create the permit application.
Residential permits
- Remodels. Kitchen and bathroom permits need a digital plan on sheets at least 11 by 17 inches showing existing and proposed floor plans and every fixture, light and outlet.
- Additions, ADUs and new homes need full plans stamped and signed by the person who prepared them, and are routed to the outside plan check consultant and the other reviewers.
- Solar and batteries. Residential solar, battery and energy storage permits are applied for through Symbium by the owner or a contractor holding a B, C-10 or C-46 license. Symbium checks the design and charges its own processing fee; the city’s permit technician then processes it as an over-the-counter permit and sends an invoice. The city fee for a system up to 15 kW is $450 plus $15 per kW above that.
- Stand-alone trade permits are priced by the number of items.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Tenant improvements and new commercial buildings pay plan check and go through the same multi-department review. Multifamily and non-residential re-roofs over 5,000 square feet are priced by valuation. The forms page also offers a concurrent submittals agreement and an unreasonable hardship application for accessibility.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Measure D allocation. Measure D is the city’s residential growth management system, allowing growth of 1–1.5% a year. Anyone building a new residential unit, including a single-family home or ADU, must obtain a Measure D allocation before applying for a Coastal Development Permit or building permit. The 2026 application window ran from January 1 to January 30, 2026.
- Coastal Development Permit. The whole city is in the coastal zone, and the Local Coastal Program (land use plan updated in 2020 and certified by the Coastal Commission in April 2021) applies citywide. Planning issues CDPs or CDP exemptions; deposits start at $618 for an exemption and $3,714 for a single-family home up to 3,000 square feet.
- Design review and trees. Architectural, landscape and site plan review and tree removal permits are Planning approvals.
- Utilities and fire. Coastside County Water District and Coastside Fire Protection District review plans depending on the scope of work, and Public Works issues encroachment permits for work in the right-of-way.
Half Moon Bay permit costs and fees
The FY 2026–27 Master Fee Schedule sets the building permit fee from the total construction value, materials and labor included. Fees are collected through Cloudpermit when the application is submitted, and projects needing plan review also pay a plan check fee of 65% of the building permit fee at submittal. Of that plan check fee, 80% covers the outside consultant and 20% is the city’s processing share. The schedule rises each year with the San Francisco Bay Area consumer price index.
| Item | Fee |
|---|---|
| Valuation up to $500 | $389 |
| Valuation $501–$2,000 | $389 plus $21 per $100 over $500 |
| Valuation $2,001–$25,000 | $719 plus $3 per $1,000 over $2,000 |
| Valuation $25,001–$50,000 | $809 plus $10 per $1,000 over $25,000 |
| Valuation $50,001–$100,000 | $1,079 plus $5 per $1,000 over $50,000 |
| Valuation $100,001–$500,000 | $1,348 plus $5 per $1,000 over $100,000 |
| Valuation $500,001–$1,000,000 | $3,597 plus $9 per $1,000 over $500,000 |
| Valuation $1,000,001–$2,500,000 | $8,634 plus $0.50 per $1,000 |
| Building plan check | 65% of building permit fee |
| Re-roof: single-family / multifamily or non-residential under 5,000 sq ft | $338 / $503 |
| Demolition | $449 |
| Stand-alone trade permit: water heater / one item / 2–3 / 4–6 items | $134 / $264 / $384 / $554 |
| Trade work with a new home | $23 per 100 sq ft |
| Re-inspection, extra plan review (4th and later), hourly work | $298 per hour |
| Permit reactivation / replaced job card | $298 / $74 |
| Work without a permit | 2 times the permit fee |
Rather talk it over?
Call 1-855-478-4290 →Worked example: an addition valued at $200,000 falls in the $100,001–$500,000 band, so the permit fee is $1,348 plus 100 × $5, or $1,848, and plan check adds 65% of that, $1,201.20, for $3,049.20 before planning, coastal, impact, school and state fees.
Planning and coastal fees
Planning fees are deposits or flat fees from the same schedule: a CDP exemption $618; a CDP for a single-family home $3,714 up to 3,000 square feet and $4,643 above; a CDP for a new ADU $1,857; Measure D processing $773 for an ADU and $1,083 for a single allocation; architectural, landscape and site plan review $1,237; a variance or exception heard by the Planning Commission $1,547; tree removal $773 for up to five trees; a pre-application review $2,166 and a planning consultation $618. An appeal filing fee of $618 applies outside the Coastal Commission’s appeals jurisdiction and none inside it. Projects adding 500 square feet or more of habitable space also pay school fees before the permit is issued.
Trade permits and who may pull them
The Building Division issues the electrical, plumbing and mechanical permits that go with a building permit or stand alone. A stand-alone permit is priced by the number of items, from a water heater alone ($134) up to six items ($554); more than six are priced by valuation.
- Who may apply. Property owners or licensed contractors may apply for a permit or sub-permit. Contractors must provide a certificate of workers’ compensation insurance; owners doing their own work sign an owner-builder declaration stating they are exempt from workers’ compensation or provide a certificate.
- Business license. Contractors need an active Half Moon Bay business license, issued through the city’s vendor HdL (650-443-9050). It is checked at the counter, and a current license must be on file before the final inspection.
- Solar contractors applying through Symbium need a B, C-10 or C-46 license; Symbium checks contractor and business licenses automatically.
Rather not deal with the building department?
Get a free quote →How to apply for a Half Moon Bay building permit
For a new unit, obtain a Measure D allocation first. Ask Planning whether the work needs a Coastal Development Permit, an exemption or design review.
The city recommends reading its submittal checklist before starting; plans must carry the name, address, stamp and signature of whoever prepared them.
Register at the city’s Cloudpermit page; contractors register as a contractor first. For residential solar, use Symbium instead.
Upload the application and digital plans and pay the permit fee and, where plan review is needed, the 65% plan check fee through Cloudpermit.
Planning, Coastside Fire, Coastside County Water District, Public Works and the building plan checker comment in Cloudpermit; revised drawings must correct the originals.
Pay school district fees where the project adds 500 square feet or more of habitable space, then begin work within 365 days of issuance.
Review, corrections and what causes delay
Allow at least 10 business days for the city to process a plan check. Three reviews are covered; from the fourth review, time is billed at $298 an hour. The FAQ warns that incomplete or unclear drawings delay issuance and that marked-over or altered plans are not accepted. A permit not started within 365 days becomes void; it can be renewed once for half the original fee within a year of issuance, and the building official can extend an unexpired permit once for up to 180 days on written request.
Inspections in Half Moon Bay
Building, Planning and Public Works inspections are all booked in Cloudpermit. Inspectors work Monday to Thursday from 8 a.m. to noon and noon to 3 p.m., and Friday mornings from 8 to noon. For permits issued before February 7, 2025, or inspections not listed in your online permit, call the hotline at 650-726-8794 before 3 p.m. for next-day service.
- Before final. Get final approval from every other department that reviewed the project, and make sure the Building Department has your business license, the construction and demolition recycling form and, for homes, the smoke and carbon monoxide alarm handout.
- Special inspections. The city posts a list of approved special inspection companies and a special inspection form.
- Construction hours. Work is allowed Monday to Friday 7 a.m. to 6 p.m., Saturday 8 a.m. to 6 p.m. and Sundays and holidays 10 a.m. to 6 p.m.
Local details in Half Moon Bay
- Flood zones. Half Moon Bay participates in the National Flood Insurance Program; its current flood map is dated August 2, 2017.
Want this handled start to finish?
Get a free quote →California building code in Half Moon Bay
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
The city tells applicants that submittals made on or after January 1, 2026 must follow the 2025 California Building Code; its building rules are in Title 14 of the Municipal Code.
Half Moon Bay building permit FAQs
Who issues building permits in Half Moon Bay?
The city’s Building Division at City Hall, 501 Main Street (650-726-8270). City Hall and the permit counter are open Monday to Thursday, 8:30 a.m. to 5 p.m.
How do I apply?
Online through Cloudpermit, or at the counter with the city’s application and proof of a Half Moon Bay business license. Residential solar and batteries go through Symbium.
Do I need a Coastal Development Permit?
The whole city is in the coastal zone and the Local Coastal Program applies citywide, so check with Planning. Planning issues CDPs and CDP exemptions; an exemption deposit is $618.
What is a Measure D allocation?
Half Moon Bay’s residential growth limit. Every new dwelling unit, including an ADU, needs an allocation before you apply for a CDP or building permit.
How much does a building permit cost?
For a $200,000 addition, the FY 2026–27 permit fee is $1,848 and plan check $1,201.20. A single-family re-roof is $338 and a water heater permit $134.
Do I need a permit for a shed or fence?
A shed needs a permit if it is over 120 square feet, over 8 feet high or has plumbing or electrical work. A fence up to 7 feet needs no building permit, but front-yard fences are limited to 3 feet.
How long is a permit good for?
Work must start within 365 days of issuance, or the permit becomes void. It can be renewed once for half the original fee within a year, and the building official can grant one extension of up to 180 days.
How do I schedule an inspection?
In Cloudpermit. For permits issued before February 7, 2025, call 650-726-8794 before 3 p.m. for a next-day inspection.
Half Moon Bay permit search and official resources
Current permit status and inspection results are in Cloudpermit. For the permit history of a property, the Building page directs you to a public records request.
Inspections are where schedules slip.
Get a free quote →- Half Moon Bay Building Division
- Applying for a building permit (Cloudpermit and Symbium)
- Plan checks
- Building inspection
- Building FAQs
- Forms, publications and codes
- Master Fee Schedule page
- Master Fee Schedule 2026–27
- Current Planning and Coastal Development Permits
- Local Coastal Program and Land Use Plan
- Measure D residential allocations
- ADU ordinance update
- Building electrification
- 2025 California Title 24 building standards
- FEMA Community Status Book, California
Simplify Half Moon Bay permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Half Moon Bay sooner?
Let Alliance prepare, file, and track your Half Moon Bay permits while your crew stays on the job.
More California permitting guides
San Mateo County
Read guide →Hillsborough
Read guide →Menlo Park
Read guide →Hanford Building Permit Guide
Read guide →Hawaiian Gardens Building Permit Guide
Read guide →Hawthorne Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Half Moon Bay permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.