Danville is an incorporated town, and its Building Division issues building and trade permits for every address inside town limits from the Permit Center at 500 La Gonda Way (925-314-3330). Most residential and commercial permits are filed through the Town’s online permit portal, and fees follow the Fiscal Year 2026/27 Master Fee Schedule (Resolution 47-2026), whose development services fees took effect on August 3, 2026. Plan review is charged at 65% of the building permit fee for one round of comments and a back check.
What requires a building permit in Danville?
The Town says a permit is needed for most construction and repair work. Its permit FAQ lists trade work, structural changes to beams, columns or shear walls, additions, kitchen and bathroom remodels, decks and patio structures, ADUs, replacement furnaces, air conditioners and water heaters, and pools, spas and hot tubs.
Permit thresholds Danville publishes
- Accessory structures such as sheds, garages, gazebos and cabanas over 120 square feet need a building permit
- Any electrical or plumbing work in an accessory structure needs a permit, whatever its size
- Retaining walls supporting more than 3 feet of soil, or carrying a surcharge from a driveway, a slope, a nearby building or an uphill wall (the FAQ also states the rule as walls over 4 feet from bottom of footing to top of wall)
- Re-roofs, window, patio door and skylight replacements, siding and solar systems, each with its own submittal list
- Demolition of a building, which also needs a PCB screening assessment
Zoning limits Danville sets
- Accessory structures may not exceed 15 feet in height, or 12 feet within 10 feet of a side or rear line
- Fences in a front setback are limited to 3.5 feet; side and rear fences to 6 feet, or 7 feet with a top foot of open lattice
- Retaining walls are limited to 6 feet in height unless the Town finds a structural or geotechnical need
- A sight distance triangle at corners keeps fences and plantings low
A Tree Removal Permit is needed for protected native trees (oaks, bay, buckeye, sycamore, madrone and others) with a trunk of 10 inches or more, or 20 inches combined for multi-trunk trees, measured 4½ feet above grade, and for any single-trunk heritage tree of 36 inches or more.
What Danville decides and what the state holds
Danville writes its own zoning, accessory structure, fence, tree, ADU and noise rules, sets its fees by Town Council resolution and runs its own plan review, inspection and code enforcement. The Building Division also publishes local design criteria for engineers: Wind Exposure C unless a site qualifies as Exposure B, Soil Site Class D with 1,500 psf bearing pressure unless a soils report justifies otherwise, and Climate Zone 12. A geotechnical report is required for nonresidential and multifamily projects. The Town’s own amendments to the state codes sit in the Danville Municipal Code, published by American Legal Publishing.
Danville building department: who handles permitting
The Town’s Building Division handles plan review, permit issuance and inspections, and the Planning Division reviews zoning, setbacks, ADUs, trees and signs. Some Danville mailing addresses are actually in unincorporated Contra Costa County; the Permit Center can confirm which side of the town boundary a parcel is on, and an address outside it is permitted by the county instead.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Permit Center, Town of Danville, 500 La Gonda Way, Danville, CA 94526 |
| Building Division | 925-314-3330; Building@danville.ca.gov; inspector line 925-314-3350 |
| Planning and Engineering | 925-314-3310; planning@danville.ca.gov |
| Counter hours | Monday to Thursday 7:30 a.m. to 4 p.m. (closed noon to 1 p.m.), Friday 7:30 a.m. to 1 p.m.; closed 2 to 4 p.m. on the second Thursday of each month |
| Inspection requests | 925-314-3333 or the online portal |
Danville permit types
The Permit Center’s permit directory gives each project type its own online application and submittal list. Paper filings start with the Town’s Building Permit Application, and a Permit Revision Application covers changes to approved plans.
Residential permits
- New houses and ADUs have their own submittal requirements; junior ADUs of up to 500 square feet are converted from existing floor space. An ADU or junior ADU that is rented must be let for terms longer than 30 days.
- Additions and remodels follow the Town’s Alterations vs. New Construction Policy; like-for-like kitchen and bathroom remodels have a shorter checklist.
- Accessory structures, decks and retaining walls each have a handout and submittal list; for walls the Town lists engineering calculations, a soils report to set design values and civil drawings of site slopes.
- Pools and spas carry drowning-prevention requirements, and pool remodels and pool demolitions have separate guidelines.
- Solar can be approved through SolarAPP+ for most roof-mounted retrofit systems on houses: the installer gets the automated approval, applies for the Town permit, pays, and signs the permit when the Town emails it within 24 business hours.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
New commercial buildings, additions, tenant improvements, commercial re-roofs (with the roof material type and color shown by photo or data sheet), HVAC, signs and demolitions each have Town submittal requirements. Every demolition permit needs the PCB screening assessment in the Town’s demolition guidelines.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Planning. Check the zoning and setbacks for the lot; development plans, variances and land use permits are filed on the Planning Application form, and SB 9 projects have their own application.
- Central Contra Costa Sanitary District. Central San must review and stamp the plans before you apply when fixtures are added, moved or removed, the footprint grows, or a deck, gazebo, ADU, carport, generator or ground-mounted solar array is added.
- Fire and water. The San Ramon Valley Fire Protection District (925-838-6600) and East Bay Municipal Utility District, the Town’s water supplier, review where the outside agency checklist calls for them.
- Flood zone. Danville takes part in the National Flood Insurance Program; its current FEMA flood map is dated March 21, 2017.
- Public right-of-way and grading. Work in a street or sidewalk needs an encroachment permit, and earthwork needs a Town grading permit.
- Air district and recycling. The checklist also lists the Bay Area Air Quality Management District and the construction and demolition debris program.
Danville permit costs and fees
Danville’s fees are in its Master Fee Schedule for Fiscal Year 2026/27, adopted by the Town Council on June 3, 2026 by Resolution 47-2026 under Ordinance 98-06; the development services fees in it took effect on August 3, 2026. Staff set the fees after the first review of an application, and they are collected before the permit is issued. Card payments carry a 2.99% processing fee, with a $2 minimum.
| Total valuation | Fee |
|---|---|
| $1 to $500 | $25.08 |
| $501 to $2,000 | $25.08 plus $3.26 per $100 over $500 |
| $2,001 to $25,000 | $73.90 plus $14.94 per $1,000 over $2,000 |
| $25,001 to $50,000 | $417.49 plus $10.77 per $1,000 over $25,000 |
| $50,001 to $100,000 | $668.21 plus $7.27 per $1,000 over $50,000 |
| $100,001 to $500,000 | $1,060.40 plus $5.98 per $1,000 over $100,000 |
| $500,001 to $1,000,000 | $3,451.14 plus $5.07 per $1,000 over $500,000 |
| Over $1,000,000 | $5,984.90 plus $3.24 per $1,000 over $1,000,000 |
The building permit fee includes inspection. On top of it come electrical, plumbing and mechanical sub-permits at 20%, 17% and 18% of the building permit fee, and structural and architectural plan review at 65% of the building fee, with trade plan reviews at 20%, 17% and 18% of that plan review. A further round of review costs $156 an hour, and review of changes to plans $158 an hour. Every permit also pays the state Strong Motion fee (0.013% of valuation for residential, 0.028% for commercial), the California Building Standards fee of $1 per $25,000 of valuation and a Comprehensive Planning Fee of 0.1% of valuation, capped at $2,000. Valuation comes from the Town’s cost-per-square-foot table.
Rather talk it over?
Call 1-855-478-4290 →| Work | Fee |
|---|---|
| Minimum building permit (inspection) fee | $122 |
| Kitchen remodel, non-structural | $797 |
| Bathroom remodel, non-structural / powder room | $583 / $371 |
| Standard residential re-roof | $331 |
| Furnace and A/C replacement | $209 |
| Water heater, furnace or A/C replacement, each | $122 |
| Detached storage shed with no trades (up to 250 sq ft) | $308 |
| Photovoltaic system | $201.50 plus $7.44 per kWp |
| Reinspection or permit reactivation | $122 minimum |
| Temporary certificate of occupancy (commercial and industrial only) | $280 |
| Grading permit, under 50 cubic yards / 50–100 cubic yards | $46 / $72 |
Worked example. Work valued at $75,000 falls in the $50,001–$100,000 band: $668.21 plus 25 × $7.27 ($181.75) gives a building permit fee of $849.96. Plan review at 65% adds $552.47, and the administrative fees add $9.75 (residential Strong Motion), $3 (Building Standards) and $75 (Comprehensive Planning), for $1,490.18 before any trade sub-permits or Planning and Engineering plan checks. The bands do not join exactly at $100,000.
Trade permits and who may pull them in Danville
Electrical, plumbing and mechanical work is permitted by the Town’s Building Division, either as a stand-alone residential electrical, plumbing or HVAC application in the portal or as a sub-permit on a building permit.
- Contractors need their state license, and any business earning revenue inside town limits, home-based ones included, needs a Danville business license. Licenses run from July 1 to June 30 and are applied for, renewed or closed in the Town’s online business license portal.
- Owner-builders must complete the Town’s Permit Addendum for Owner-Builders, initialling each statement about their responsibilities and insurance risks. The Town will not issue the permit until the signed form is returned, and the owner’s signature must be checked by license, notarization or other proof the Town accepts.
- Special inspections. Where the building code calls for them, the Special Inspection and Observation Program form must be filed before the first inspection.
Rather not deal with the building department?
Get a free quote →How to apply for a Danville building permit
Look up the lot’s zoning district and setback rules, and call Planning at 925-314-3310 with questions. Commercial applicants can request a Business Concierge meeting.
Use the Outside Agency Checklist. Central San must stamp plans first for additions, new fixtures, new structures, generators and ground-mounted solar.
Create an account in the Town’s online permit portal, which most residential, commercial and encroachment permits now use, or bring the application to the Permit Center.
Choose the permit type in the directory, attach the drawings and documents its list asks for, and include the Building Permit Application for paper filings.
Permit technicians screen the file, invoice the fees and route it to Planning, Engineering and Building reviewers once payment clears.
Resubmit with a response letter if corrections are needed, then sign the approved permit in all four places and pay any remaining fees to have it issued.
Review, corrections and what causes delay
A new application should sit in “received” for no more than about 3 business days before it is invoiced or approved, and plan review by all divisions can take up to 5 or 10 working days depending on scope. A file marked “requires resubmit” needs revised plans and a response to comment letter; with no response in 180 days it is abandoned and the fees are forfeited. An approved permit not issued within 180 days is also abandoned, and the Town names a missing contractor or an unsigned permit as the usual hold-ups.
Inspections in Danville
Request inspections through the online portal or on the automated line at 925-314-3333. Requests made before 3 p.m. are scheduled for the next business day, and inspections can be booked up to 5 days ahead. The estimated time window is posted on the portal on the morning of the inspection, and the Town suggests checking after 4 p.m. the day before.
The quick reference guide gives each inspection a code, from foundation work in the 100s and framing in the 300s to pool steps, including the barrier and alarm check, in the 200s. A job closes with the Engineering (901) and Planning (904) finals and the Building final (905), plus any fire, county health or Central San sign-offs. Work may run from 7:30 a.m. to 7 p.m. on weekdays and 9 a.m. to 7 p.m. on weekends and holidays.
Once a permit is issued the inspection card and approved plans are posted on the portal, and the work must be finished within 365 days. An expired permit can sometimes be reinstated on an emailed request with a reason for the delay and a reinstatement fee.
Want this handled start to finish?
Get a free quote →California building code in Danville
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Danville moved to the 2025 codes on January 1, 2026; December 23, 2025 was the last day to pay for and submit a complete package under the 2022 codes. The Town’s code sheet lists the 2025 building, residential, electrical, mechanical, plumbing, energy, fire, green building and Wildland-Urban Interface codes.
Danville permit search and official resources
Anyone can look up the permit history of a Danville address in the online portal’s search without an account, using the street number and name. Records searches by staff are billed at $54 an hour under the fee schedule.
- Danville Permit Center: directory, hours and FAQs
- Danville online permit portal
- Master Fee Schedule FY 2026/27, Resolution 47-2026 (PDF)
- Current Building Codes and Design Criteria (PDF)
- Schedule an inspection
- Building inspection quick reference guide (PDF)
- Permitting process and status explained
- Search permit history
- Outside Agency Checklist (PDF)
- Permit Addendum for Owner-Builders (PDF)
- Accessory Structures handout (PDF)
- Fence Standards (PDF)
- Tree Removal Requirements (PDF)
- Accessory dwelling units
- Danville business license
Inspections are where schedules slip.
Get a free quote →Danville building permit FAQs
How much is a building permit in Danville?
Under Resolution 47-2026, $75,000 of work carries a building permit fee of $849.96 plus $552.47 for plan review before surcharges; common jobs have flat fees, such as $331 for a standard home re-roof.
Do I need a permit for a shed in Danville?
A building permit is needed for an accessory structure over 120 square feet, and any electrical or plumbing in a shed of any size needs a permit. A shed with no trades up to 250 square feet has a flat fee of $308.
How long does plan review take in Danville?
Review by all divisions can take up to 5 or 10 working days depending on scope, once the invoice is paid.
How do I schedule an inspection in Danville?
Call 925-314-3333 or use the online portal before 3 p.m. for a next-business-day inspection; you can book up to 5 days ahead.
Do I need Central San approval before applying?
Yes, for additions, new or moved plumbing fixtures, new decks, gazebos, ADUs or carports, generators and ground-mounted solar: the Central Contra Costa Sanitary District must review and stamp the plans before you submit them to the Town.
Can a homeowner pull a permit in Danville?
Yes, as an owner-builder, after completing and signing the Town’s owner-builder addendum, with the signature confirmed by license, notarization or other accepted proof.
How long is a Danville permit good for?
You have 365 days from issuance to complete the work. Applications left without a response for 180 days, and approved permits not issued within 180 days, are treated as abandoned.
Simplify Danville permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Danville sooner?
Let Alliance prepare, file, and track your Danville permits while your crew stays on the job.
More California permitting guides
Contra Costa County
Read guide →El Cerrito
Read guide →Moraga
Read guide →Davis Building Permit Guide
Read guide →Del Norte County Building Permit Guide
Read guide →Delano Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Danville permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.