Davis, California Building Permit Guide

Everything contractors, builders and developers need for a City of Davis building permit — the Building Division, the 2025 codes and inspections.

Authority: Building DivisionCode: Davis (Title 24)Phone: 530-757-5610
Yolo County city
About 66,000City is its own AHJ
Community Development
2025 code from January 2026Building Division
Resale certificate programme
Point of sale inspectionValid 18 months
Review in order received
20 to 35 business daysTypical processing

Davis is a Yolo County city of about 66,000 residents in the Sacramento Valley, shaped by a large university, a compact bicycle-oriented street grid and strong local design and sustainability policy. Its Building Division, within Community Development and Sustainability at the city offices on Russell Boulevard, is the sole building authority inside the city.

This guide covers the Building Division, the resale certificate programme that catches sellers and buyers, review timing, and the codes in force.

This guide covers work inside the City of Davis limits. Unincorporated Yolo County and neighbouring cities are separate authorities.

🏠

Davis runs a point of sale programme that most California cities do not. Under Davis Municipal Code Article 8.10, before a house, duplex or triplex is sold, the owner applies to the Building Division for a resale inspection no later than 15 working days before close of escrow. The city inspects and issues a report of violations, which the seller gives to the buyer; violations not corrected before the sale must be corrected by the buyer within 90 days of it. A resale certificate is issued once the violations are corrected. The report is valid until a certificate issues or 18 months after the inspection, a certificate is valid 18 months from validation, and either expires if the property is altered without a required permit — which makes unpermitted past work a transaction problem rather than only a code problem. Apartment buildings of four or more units, hotels and motels file a self-certification form instead.

What requires a building permit in Davis?

Permit required

  • New commercial, multi-family and residential construction, additions and change of occupancy
  • Structural alterations, load-bearing changes, foundations, decks and retaining walls
  • Electrical work — services, panels, circuits, solar and EV charging — under the California Electrical Code
  • Plumbing under the California Plumbing Code
  • Mechanical and HVAC change-outs, and work affecting the Title 24 energy envelope
  • Re-roofing above the exempt scope, pools, signs, and demolition

Often exempt

  • Minor repairs and maintenance replacing materials in kind
  • Small accessory structures below the local threshold, where zoning allows
  • Painting, flooring, cabinetry and other finish work
  • Like-for-like fixture or appliance swaps with no alteration to wiring or piping

Short on time to read all of this?

Get a free quote →

Local amendments and thresholds differ from one jurisdiction to the next, so an exempt list from a neighbouring city is not reliable — a project waved through in one place needs a full permit set in the next. An exemption from a building permit is never an exemption from zoning, the statewide energy or green-building codes, or an electrical or plumbing permit. Confirm scope with Building Division before work starts.

The statewide layers that apply everywhere

Several parts of Title 24 apply on top of the base building code and routinely catch projects owners assume are exempt: the California Energy Code (Part 6); CALGreen (Part 11), California’s mandatory statewide green-building code; and the accessibility provisions in Chapters 11A and 11B. Seismic design is built into the code statewide, and in fire-prone areas the California Wildland-Urban Interface Code (Title 24, Part 7, in force since 1 January 2026) and Cal Fire defensible-space requirements (Public Resources Code 4291) add a further layer. In the City of Davis, the Building Division within Community Development and Sustainability administers Title 24 with city amendments, with the 2025 codes applying to building permit applications made from January 2026.

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Who handles permitting in Davis?

The Building Division issues construction permits and inspects work inside the city, applying the California Building, Residential, Plumbing, Mechanical, Electrical and Energy Codes as adopted by the city.

Davis permitting contact
DetailInformation
AuthorityCity of Davis Building Division
ServesThe City of Davis limits
Phone530-757-5610
Counter23 Russell Boulevard, Suite 2; counter hours end at four
Code2025 codes for applications from January 2026
FilingOnline permitting with counter and drop box options
LicensingState CSLB license; no local contractor registration
RecordsIssued building permits published by the city

Applications are reviewed in the order received, with typical processing of 20 to 35 business days from submittal. Permit fees are paid online once the permit number is issued after processing, and cheques are accepted by post or through the drop box at the city offices. Property owners may apply for permits directly using the owner-builder form alongside the correct residential or commercial permit type.

Counter and phone hours end an hour before the offices close, which is the most common reason a same-day question goes unanswered. Confirm the parcel is inside the city, because unincorporated Yolo County and the neighbouring cities file with different authorities under their own amendments.

Not sure this scope needs a permit?

Get a free quote →

In 2025, building permits issued in Davis authorized 68 new privately owned housing units, all of them single-family homes, according to the U.S. Census Bureau Building Permits Survey.

Permit types

Residential permits

Residential work inside the city is permitted and inspected by the division under the 2025 codes and city amendments. The resale programme is the distinctive layer: the seller files a resale inspection application, the city inspects and issues a report of violations, and corrective work with any required permits is completed before the resale certificate is issued — or by the buyer within 90 days of the sale. Owner-builders apply directly using the owner-builder form.

Commercial permits

Commercial work goes through division plan check against the California Building Code, the Fire Code, the Energy Code and CALGreen. Applications are reviewed in the order received on the same 20 to 35 business day guideline, and projects that also require planning or design review run those approvals alongside rather than after the building submittal, which is worth sequencing deliberately on any exterior change.

Licenses, trade classifications and design professionals

Practically, three credential layers appear on California projects: a CSLB license in the correct classification for the contractor pulling the permit; the specialty C-classifications for the electrical, plumbing and mechanical trades; and, on commercial and larger residential work, drawings stamped by a California-licensed architect or engineer. Confirm what Building Division requires for the specific building before filing.

Contractors are licensed statewide by the Contractors State License Board (Classes A, B, B-2 and C) for work of $1,000 or more or any permitted work; a city may also require a business licence or tax registration. Contractor licensing in California

Davis permit costs and fees

Budget the city building permit and plan-check fees, separate trade permits, the state Building Standards and seismic surcharges, resale inspection fees where a sale is involved, and any development impact fees. The permit number is issued after processing and is needed before fees can be paid online.

Rather talk it over?

Call 1-855-478-4290 →
How Davis permit fees are structured
Fee componentHow it works
Building permitBased on project valuation or square footage; set by the local schedule
Plan checkA percentage of the permit fee or a flat charge, at submittal
Trade permitsSeparate electrical, plumbing and mechanical fees
State surchargesBuilding Standards and seismic (SMIP) fees collected with the permit
Impact and school feesDevelopment impact and school-district fees in growth areas
Re-inspections and revisionsAdditional fees for failed inspections, revisions and expired permits

California layers two uniform state surcharges — the Building Standards Administration fee and the Strong Motion Instrumentation seismic fee — on top of the local charges (Health and Safety Code 18931.6; Public Resources Code 2705). The building and plan-check fees themselves are local and change, and California law limits them to the reasonable cost of providing the service, so a figure from a neighbouring city is not reliable — ask Building Division for the schedule in force on your filing date.

🧮

Need a real number for a specific Davis project? Send us the scope, address and valuation and we will identify the authority having jurisdiction, the code edition in force and the fee categories that will apply.

Trade permits and who may pull them

Permit required

  • Service installations, panel upgrades, new circuits, solar PV and EV chargers
  • New plumbing, repipes, water heater change-outs, fixtures, backflow and gas piping
  • HVAC installation and change-out, ductwork, venting and commercial kitchen exhaust
  • Sprinkler, standpipe and fire alarm work on commercial and multi-family structures

Typically exempt

  • Replacing a fixture, switch, receptacle or light with no alteration to wiring or piping
  • Clearing a stoppage without replacing or rearranging concealed piping
  • Filter, thermostat and routine component service
  • Like-for-like appliance repair that does not alter the connection

Rather not deal with the building department?

Get a free quote →

Each trade follows its part of Title 24 and is done by a contractor with the matching CSLB licence (C-10 electrical, C-36 plumbing, C-20 HVAC), a Class B contractor where allowed, or an owner-builder. Trade licences in California

How to apply for a Davis building permit

1. Confirm the parcel is inside the city

Unincorporated Yolo County and neighbouring cities are separate authorities.

2. Check resale obligations if a sale is involved

Apply for the resale inspection at least 15 working days before close of escrow.

3. Resolve unpermitted past work first

Corrective work and any required permits are completed before validation.

4. Submit and wait on the published window

Applications are reviewed in the order received, typically 20 to 35 business days.

5. Pay once the permit number issues

Online payment needs the permit number provided after processing.

6. Call inside counter hours

Counter and phone hours end an hour before the offices close.

Review, corrections and what actually causes delay

In California, the first cause of delay is uncertainty over jurisdiction — filing with the county when a city should have it, or missing a local amendment on top of Title 24. After that come Title 24 energy and CALGreen documentation, a CSLB classification that does not match the scope, and, in fire or coastal areas, defensible-space or coastal-zone requirements that were not addressed up front. Build the plan-check time into the schedule and confirm the checklist with Building Division before filing.

A building permit carries a validity period and can expire if work does not start or stalls between inspections; confirm the expiry with Davis on phased or delayed work. Permit validity in California

Inspections in Davis

Where a permit is required, standard checkpoints include footing and foundation, framing, rough-in electrical, plumbing and mechanical, insulation and Title 24 energy, CALGreen measures, fire systems on commercial work, and final, with a certificate of occupancy before use. Inspections are scheduled through the division once the permit is issued, with resale inspections booked at the time the application is paid.

Want this handled start to finish?

Get a free quote →

California inspections are made against the code editions in effect when the permit application was submitted (Health and Safety Code 18938.5), so the approved plans and any energy and green-building documentation need to be on site for the inspector to check against. Confirm the notice Building Division needs and schedule around its inspection windows.

Do not cover work before the required inspection has been approved. Keep the issued permit, the approved plans, product listings, Title 24 energy documentation and your correction responses available on site.

Davis permit search and official resources

Permit records in California sit with the local authority that issued them. Where the City of Davis Building Division is the authority for the City of Davis limits, it holds the building permit, the inspection history and the certificate of occupancy. If you are buying, refinancing or renovating, confirm that past work was permitted rather than assuming it was — and confirm the code edition that was in force.

🔍

Confirm the authority having jurisdiction and the local amendments first. California enforces one statewide code, Title 24, but each city and county adds its own amendments and fee schedule, so the requirements that apply vary by parcel. Confirm current requirements, fees and review turnaround for your filing date.

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Frequently asked questions

Who issues building permits in the City of Davis?

The Building Division within Community Development and Sustainability at the city offices on Russell Boulevard; unincorporated Yolo County and neighbouring cities are separate authorities.

Inspections are where schedules slip.

Get a free quote →

What is the resale programme?

Before a house, duplex or triplex is sold, the owner applies for a city resale inspection. The city issues a report of violations, which the buyer must receive and sign before the sale; a resale certificate is issued once the violations are corrected. Apartment buildings of four or more units, hotels and motels file a self-certification form instead.

How long is a resale certificate valid?

A certificate is valid 18 months from validation, and a report is valid until a certificate issues or 18 months after the inspection. Either expires at once if the property is altered without a permit where one was required.

What happens if the seller does not complete the report items?

The sale can still close once the buyer has signed for the report, but the buyer must then correct the listed violations within 90 days of the sale. An unused report expires 18 months after the inspection, and a new inspection is then needed.

How long does review take?

Applications are reviewed in the order received, with typical processing of 20 to 35 business days from submittal.

Can an owner pull the permit?

Yes. Property owners may apply for permits using the owner-builder form alongside the correct residential or commercial permit type.

Simplify Davis permitting with Alliance Permitting

Davis rewards resolving unpermitted history before a sale rather than during one. The resale certificate is where old work surfaces.

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Trusted by leading builders, developers, and national contractors — 21+ years of filing in the jurisdictions we write about.

Contractors and builders choose Alliance for Davis because the work is done by people who have stood at the counter:

  • We surface unpermitted history before it reaches a resale inspection.
  • We run resale applications and building permits as one workstream.
  • We submit early against the order-received review queue.
  • We pay as soon as the permit number is issued after processing.
  • We raise counter questions inside the shorter phone window.

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Davis sooner?

Let Alliance prepare, file, and track your Davis permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Davis permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.