In unincorporated Del Norte County, building permits are reviewed and issued by the Building Inspection Division of the Community Development Department at 981 H Street, Suite 110, Crescent City ((707) 464-7253, building@co.del-norte.ca.us), where Scott Huffman is the County Building Official. Property inside the City of Crescent City goes to the City’s own Building Department instead. Zoning and coastal questions go to the County Planning Division, and grading, driveway and road encroachment permits to Engineering and Surveying, whose posted fee schedule charges $150 for an encroachment permit without a site inspection.
What requires a building permit in unincorporated Del Norte County?
The Building Inspection Division reviews and processes permits for construction regulated by the California Building Code and Title 24 as modified by the County, and checks plans before it authorizes work to begin. Its application packet shows the kinds of work it permits most often, and other County divisions issue the site permits that go with them.
County Building Inspection
- New homes, additions and commercial buildings, with a CALGreen checklist
- Accessory dwelling units (ADU checklist), including pre-approved plans and amnesty legalizations
- Manufactured homes placed on individual lots (placement checklist)
- Rooftop solar and electric vehicle chargers (expedited)
- New buildings in wildland-urban interface areas (WUI form)
- Landscaping covered by the County’s water efficient landscape ordinance (certification form)
Other County permits
- Grading permits from Engineering and Surveying: major grading for work in a County right-of-way, major tree cutting or preparing more than one acre; minor grading for one home site under an acre
- Tree and vegetation removal permits
- Encroachment permits for work in County road rights-of-way, and driveway inspections
- Zoning, subdivision and coastal approvals from Planning
- Septic upgrades through Environmental Health where a project relies on a septic system
The County’s solar and EV page sums up the basic rule: no work may begin until the building and electrical permits are issued. The County’s own building permit guidelines and plot plan brochure, listed with the application, set out what a complete submittal contains.
What the County decides and what the state holds
The County sets its own permit fees by ordinance, runs zoning and subdivision rules under its General Plan and Local Coastal Program, adopted the expedited solar and EV charger process by Ordinance No. 2022-001 (Chapters 16 and 17 of Title 14 of the County Code), and publishes a model water efficient landscape ordinance. Its handout list includes a sheet of County changes to the 2019 California Residential Code. The County also operates a pre-approved ADU program and an ADU amnesty program for units built before 2020.
Del Norte County building department: who handles permitting
The County Building Inspection Division issues building permits on unincorporated land, which is everything outside Crescent City’s limits. The Division sits in the Community Development Department, directed by Heidi Kunstal, alongside Planning, Code Enforcement, Engineering and Surveying, Environmental Health and the Roads Division, so most County offices a project needs share one address.
Short on time to read all of this?
Get a free quote →| Office | Handles | Contact |
|---|---|---|
| Building Inspection Division | Building permits, plan check, inspections | 981 H Street, Suite 110, Crescent City, CA 95531; (707) 464-7253; fax (707) 465-0340; building@co.del-norte.ca.us |
| Planning Division | Zoning, subdivisions, Local Coastal Program, ADU standards | Same address; (707) 464-7254; planning@co.del-norte.ca.us |
| Engineering and Surveying | Grading, drainage and improvement plans, encroachments, addressing | Same address; (707) 464-7229; engineering@co.del-norte.ca.us |
| Environmental Health | Septic systems and wells | Same address; (707) 465-0426; environmental-health@co.del-norte.ca.us |
| Roads Division | County roads, bridges and flood control ditches | 500 E Cooper Avenue, Crescent City; (707) 464-7238 |
| Assessor | Parcel maps and property records | 981 H Street, Suite 120; (707) 464-7200 |
Cities in Del Norte County
| Place | Building permits |
|---|---|
| Crescent City (pop. 6,002) | City of Crescent City Building Department, 377 J Street; (707) 464-9506; online submittals through MyGov; open Monday–Thursday 7:30 a.m.–5:30 p.m. |
| All unincorporated communities | Del Norte County Building Inspection Division |
To confirm which side of the line a parcel is on, look it up through the Assessor, whose office maintains the county’s parcel maps and links a parcel search and a county GIS map from its web page; Crescent City’s application is only for properties within the city limits.
Del Norte County permit types
All County building permits start with the same Building Permit Application and Building Permit Checklist, with extra checklists for ADUs, manufactured homes and expedited solar. The County also posts lists of drafting services and Title 24 energy compliance services for applicants who need help preparing plans.
Residential permits
- Accessory dwelling units. ADUs are allowed on any parcel zoned for homes that has an existing or proposed main dwelling. Most need only a building permit and are reviewed within 60 days of submittal. New ADUs may be 150 to 1,200 square feet, JADUs 150 to 500, with 4-foot side and rear setbacks and a 16-foot height limit for most detached units.
- Pre-approved ADU plans. Designers can have detached ADU plans pre-approved through normal plan check; owners contract with the designer, and each site still needs its own building permit with site-specific plans.
- ADU amnesty. Owners of an unpermitted ADU or JADU built before January 1, 2020 apply with proof of its age and the County’s substandard housing checklist, then go through inspection, correction permits and a final, after which the Division issues a certificate of compliance.
- Solar and EV chargers. Small residential rooftop solar systems and EV charging stations follow the expedited process and are usually approved for issuance in 1 to 3 days once the paperwork is complete.
- Manufactured homes. Placement on individual lots uses the County’s placement checklist, and Planning publishes a separate checklist for manufactured homes in residential zones.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial and other non-residential buildings use the same application with the CALGreen nonresidential checklist and, in wildland-urban interface areas, the County’s WUI requirements, which apply to new residential and commercial buildings alike. EV charging stations for multifamily and non-residential sites have their own expedited checklists.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Planning and the coastal zone. Zoning and subdivision approvals follow the General Plan and Local Coastal Program. ADUs in the coastal zone may need added review before a building permit, and attached ADUs there are usually limited to 25 feet in height rather than 35 feet elsewhere.
- Environmental Review Committee. The ERC meets every other Thursday; applications are due at least 17 days before the meeting, with a field review in between.
- Planning Commission. Meets the first Wednesday of each month in the Board of Supervisors chambers at the Flynn Administrative Building, 981 H Street, Suite 100.
- Grading and drainage. Engineering reviews grading and drainage plans, and major and minor grading permits go to the Planning Commission.
- Septic. Parcels on septic may need system upgrades for an ADU; Environmental Health decides.
- Addressing and roads. Engineering runs the County addressing program and issues encroachment permits for driveways and other work in County roads.
Del Norte County permit costs and fees
County fees are set by ordinance. The County Fee Schedules page names the countywide schedule as Ordinance 2024-001 and posts separate lists for Planning, Building Inspection, Environmental Health, Engineering and Roads, and Code Enforcement. Building permit fees are calculated by the Building Inspection Division from its schedule; call (707) 464-7253 or email building@co.del-norte.ca.us for a figure on your project. The engineering list the County links states that it took effect on September 9, 2019 under Ordinance 2019-013.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Major grading permit (Planning Commission review) | $1,535, of which $415 goes to Planning |
| Minor grading permit (Planning Commission review) | $1,035, of which $415 goes to Planning |
| Grading permit issuance | $220 |
| Tree and vegetation removal (no Planning Commission review) | $235, of which $35 goes to Planning |
| Engineered grading and drainage plan review | $150 or 1% of project cost |
| Erosion and runoff control inspection | $150; $75 per inspection after 2 hours |
| Encroachment permit | $150 with no site inspection; $150 per site inspection; 3% of project cost if engineered |
| Encroachment permit time extension | $50 |
| Driveway inspection / private road inspection | $75 / $110 per inspection |
| Grading started before a permit | Permit fee; staff time beyond it billed at $75 per hour |
Worked example from the list: a minor grading permit to prepare one home site, plus issuance, comes to $1,035 + $220 = $1,255 before any engineered plan review or erosion control inspections. Pre-approved ADU applications are paid in person when the designer submits the plans, and inside Crescent City the City’s clearance list includes school mitigation impact fees for the Del Norte County Unified School District.
Trade permits and who may pull them
The County Building Inspection Division issues the building and electrical permits for unincorporated work; its expedited solar and EV process, for example, needs both before work starts, and the ADU amnesty process lists electrical, plumbing, mechanical, structural and fire safety corrections as work done under permits. Contractors need the state CSLB license for the work, and the County’s reference page links the CSLB’s contractor search; the County lists no local trade license. Owners may build on their own property as owner-builders under state law, signing a licensed-or-exempt declaration.
Inside Crescent City, the City requires a California-licensed electrical contractor for all commercial construction, including owner-builder and tenant improvement work, and the City’s volunteer fire department reviews sprinklers, fire alarms and commercial kitchen suppression.
Rather not deal with the Del Norte County building department?
Get a free quote →How to apply for a building permit in Del Norte County
Check the parcel through the Assessor; inside Crescent City, apply to the City instead.
Call Planning at (707) 464-7254, especially for coastal parcels and ADUs.
Environmental Health for septic or wells, and Engineering for grading, drainage, addresses and driveway encroachments.
Fill in the Building Permit Application and Checklist, plus the ADU, manufactured home, WUI, CALGreen or landscape forms that apply.
Email building@co.del-norte.ca.us or call (707) 464-7253 for submittal instructions, or bring the package to Suite 110.
Answer plan check comments, pay the fees and wait for the permit before starting work.
Review, corrections and what causes delay
Expedited solar and EV applications move in 1 to 3 days only when every document is fully completed; most ADUs are reviewed within 60 days. Projects that need Planning Commission, Environmental Review Committee or coastal zone review also depend on those bodies’ meeting calendars and filing deadlines. Grading started before a permit is charged the permit fee, and staff time beyond that fee is billed at $75 an hour from the point of discovery.
Inspections in Del Norte County
County building inspections are arranged through the Building Inspection Division at (707) 464-7253. Engineering carries out its own site inspections on encroachments, driveways, private roads and erosion and runoff control, each priced in its fee list. For an amnesty ADU, the Division inspects the existing unit, the owner makes the corrections under permits, and a final inspection leads to a certificate of compliance; the certificate can be revoked if later fire and life safety violations go unaddressed.
The County’s WUI information sheet, which still cites the former wildfire section (R337) of the Residential Code, lists what new buildings in wildland-urban interface areas must have: Class A roofing, gutters that keep out leaves and debris, attic, eave and underfloor vent openings between 1/16 and 1/8 inch in noncombustible, corrosion-resistant material, exterior walls of noncombustible or ignition-resistant material, heavy timber or log, and deck, porch and stair walking surfaces within 10 feet of the building built to one of the listed ignition-resistant options. Inside Crescent City, City inspections run Monday to Thursday from 9 a.m. to 4 p.m.
California building code in Del Norte County
The Building Inspection Division’s web page still describes its work under the 2019 California Building Code as modified by the County, and the County’s reference page points to the state codes online. FEMA’s Community Status Book lists Del Norte County (community 065025, covering unincorporated land) as participating in the National Flood Insurance Program, with flood maps effective August 2, 2017.
Want this handled start to finish?
Get a free quote →California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Del Norte County permit search and official resources
Questions about an existing County building permit go to the Building Inspection Division by email or phone, and parcel information is available from the Assessor’s office in Suite 120. Crescent City permits are tracked in the City’s MyGov portal.
- Del Norte County Building Inspection Division
- Building permit applications and handouts
- County fee schedules (Ordinance 2024-001)
- Engineering and Surveying fee schedule
- Expedited permits for residential solar and EV chargers
- Pre-approved ADU program
- ADU amnesty program (AB 2533)
- Planning Division ADU regulations
- Wildland-urban interface information sheet
- Planning Division
- Environmental Review Committee 2026 deadlines
- Engineering and Surveying
- Environmental Health
- Roads Division
- Assessor and parcel maps
- State building reference materials
- City of Crescent City Building Department
- FEMA Community Status Book, California
Inspections are where schedules slip.
Get a free quote →Del Norte County building permit FAQs
Who issues building permits in Del Norte County?
The County Building Inspection Division for unincorporated land, and the City of Crescent City Building Department inside the city.
Is Crescent City the only city in the county?
Yes. Everywhere else in Del Norte County is unincorporated and permitted by the County.
How fast can I get a solar permit?
Small residential rooftop solar and EV charger permits are usually approved for issuance in 1 to 3 days once all documents are complete.
What does a grading permit for a home site cost?
Preparing one single-family home site of less than an acre falls under the minor grading permit: $1,035, plus $220 at issuance.
What does a County encroachment permit cost?
$150 without a site inspection, $150 per inspection where one is needed, or 3% of project cost for engineered work.
Can I legalize an ADU built without a permit?
If it was built before January 1, 2020, the County’s amnesty program leads through inspection and corrections to a certificate of compliance.
Are ADUs in the coastal zone treated differently?
Yes. They may need extra review before the building permit, and attached ADUs there are usually capped at 25 feet tall.
Who handles septic systems?
The County Environmental Health Division at 981 H Street, Suite 110, (707) 465-0426.
Simplify Del Norte County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Del Norte County sooner?
Let Alliance prepare, file, and track your Del Norte County permits while your crew stays on the job.
More California permitting guides
Humboldt County
Read guide →Contra Costa County
Read guide →Colusa County
Read guide →Delano Building Permit Guide
Read guide →Desert Hot Springs Building Permit Guide
Read guide →Diamond Bar Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Del Norte County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.