In Cupertino, the Building Division of Community Development at City Hall, 10300 Torre Avenue (408-777-3228), issues building, electrical, plumbing and mechanical permits for work inside city limits. Standard applications and plans are emailed to permitcenter@cupertino.gov; licensed contractors can pull nine kinds of simple residential permits instantly in Accela Citizen Access. Fees come from Resolution 26-047, effective July 1, 2026, and the division currently quotes 20 to 30 business days for a first plan review.
What requires a building permit in Cupertino?
The Building Division’s rule is that any construction or alteration not on its exemption list needs a permit. New buildings, remodels and tenant improvements need a building permit; installing or replacing furnaces, air conditioners, hoods or boilers needs a mechanical permit; panels, services, wiring, outlets, lighting and signs need an electrical permit; and sewer, water and gas lines, water heaters and fixtures need a plumbing permit.
Permit needed (examples)
- New homes, additions, ADUs and detached accessory buildings over 120 sq ft
- Kitchen, bath and other remodels; window and door changes; siding and stucco
- Re-roofs, water heaters, furnaces, heat pumps and whole-house re-pipes
- Panel upgrades, EV chargers, solar and battery systems
- Fences over 7 feet, retaining walls over 4 feet, decks over 200 sq ft or 30 inches high
- Pools and spas, demolition and pool removal
No permit (single-family homes)
- One-story detached accessory structures up to 120 sq ft (electrical work still needs a permit)
- Fences up to 7 feet and retaining walls up to 4 feet without a surcharge
- Detached decks up to 200 sq ft and 30 inches above grade that do not serve the required exit door
- Sidewalks, driveways and finish work such as painting, tile, cabinets and countertops
- Prefabricated pools under 24 inches deep, play equipment, and awnings projecting up to 54 inches
These exemptions apply only where the work does not sit over a subsurface drain system, a public utility easement or a required setback. Planning sets heights and setbacks even for permit-free sheds and decks.
What Cupertino decides and what the state holds
The City Council adopted the 2025 Title 24 codes with Cupertino amendments by Ordinance 25-2278 on November 18, 2025, effective January 1, 2026; projects under the 2022 codes had to be submitted before December 23, 2025. The city also sets its own fees, construction tax, construction hours and noise limits, and Fire Hazard Severity Zone map, which it may enlarge but not shrink. Enforcement of Municipal Code Chapter 16.32, which required all-electric new buildings, is suspended after a Ninth Circuit ruling.
Cupertino building department: who handles permitting
The Building Division of the Community Development Department reviews plans, issues permits, inspects construction and answers code questions for property inside Cupertino. Planning reviews zoning and design, Public Works issues encroachment, grading and streamside permits, and the Santa Clara County Fire Department reviews fire items and schedules fire inspections.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building Division, City Hall, 10300 Torre Avenue, Cupertino, CA 95014 |
| Phone and email | 408-777-3228, permitcenter@cupertino.gov |
| Counter | In person Monday to Thursday (Mon and Wed from 7:30 a.m., Tue and Thu from 9 a.m., closing 4 p.m., lunch noon to 1); remote only on Fridays |
| Inspections | buildinginspectors@cupertino.gov |
| Planning | 408-777-3308, planning@cupertino.gov |
| Fire inspections | Santa Clara County Fire Department, (408) 378-4010 |
| Business licenses | HdL for the city, (408) 329-9654 |
Cupertino permit types
Cupertino has three routes to a permit: an instant permit in Accela Citizen Access (ACA), an over-the-counter review for small projects, and a standard plan-review permit filed by email.
Residential permits
- Instant permits are limited to licensed contractors with an active ACA account and cover nine jobs: furnace replacement in the same location without AC, interior whole-house re-pipes, like-for-like re-roofs, panel upgrades up to 200 amps in the same location, standard gas tank water heaters of the same or lower BTUs, siding, Level 1 and 2 EV chargers, temporary power poles and solar approved through SolarAPP+. Most exclude historic properties and homes in an HOA, and re-roofs, siding and solar exclude Eichlers.
- Counter review is for small projects with complete plans, Monday to Thursday from 10 a.m. to noon; the fire department reviews at the counter on Tuesdays and Thursdays from 11 a.m. to noon.
- Standard permits cover new homes, additions, ADUs and larger remodels. The division publishes kitchen and bath templates, remodel and new-construction checklists, a residential plan review workbook and a matrix that decides whether a project is a remodel or a rebuild, which also decides whether fire sprinklers are needed.
- Owner-builders may take out permits in their own name after reading the city’s owner-builder policy and signing its disclosures; anyone paid to do work valued over $1,000 makes the owner an employer responsible for payroll taxes and workers’ compensation.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial and multifamily new construction, additions, tenant improvements, signs and solar go through standard plan review. Commercial applicants receive the state disability-access notice, and a 2025 CalGreen non-residential checklist, special inspection statement and contractor list are part of the package.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Planning approvals. Single-family (R-1) residential permits, minor modifications, variances, exceptions and tree removal go through Planning first; tree removal permits start at $483 for the first tree.
- Soils reports. Additions and detached structures of 750 sq ft or less may be exempt from a soils investigation, but ADUs still need engineered foundation plans.
- Fire hazard zones. In a Fire Hazard Severity Zone, new homes and major remodels must meet the code’s exterior materials, roofing and sprinkler standards; the city’s FHSZ page has an address lookup.
- Right-of-way. Since March 23, 2026, encroachment permits are applied for only through the Public Works application in ACA; grading and streamside modification permits are separate Public Works permits.
Cupertino permit costs and fees
Building fees are in Schedule D of the city’s fee schedule under Resolution 26-047, effective July 1, 2026. New buildings are charged by occupancy and floor area in three parts, a permit technician fee, a plan check fee and an inspection fee, with an added amount for each 100 sq ft above the size step. Many smaller jobs have flat fees; for Table 1 projects a 20% Planning Division review fee is collected at submittal.
| Item | Fee |
|---|---|
| New custom home, 2,500 sq ft (tech / plan check / inspection) | $266 / $6,320 / $8,032 |
| Each extra 100 sq ft, 2,500–4,000 sq ft home | $84.27 plan check, $59.50 inspection |
| Addition up to 250 sq ft (plan check / inspection) | $2,794 / $3,570 |
| Addition 500–999 sq ft (plan check / inspection) | $6,586 / $5,950 |
| ADU up to 499 sq ft (plan check / inspection) | $2,795 / $2,975 |
| Kitchen or bath remodel up to 300 sq ft | $1,184 |
| Residential re-roof | $28 per 100 sq ft, $500 maximum per building |
| Residential solar up to 15 kW | $450, plus $15 per kW above |
| Mechanical or plumbing/gas permit fee | $303 each, plus unit fees |
| Residential water heater (unit fee) | $74 |
| Electrical service up to 200 amps (unit fee) | $99 |
| Re-inspection, hourly inspection or plan review | $303 an hour for inspection; $316 for plan review |
| Expedited plan review | 1.5 times the plan check fee |
| Technology fee | 5.8% per permit |
| Work without a permit | Double fees |
Worked example from Table 1: a new 2,500 sq ft custom home costs $266 + $6,320 + $8,032, or $14,618, for the permit technician, plan check and inspection parts. The 20% Planning review fee, the 5.8% technology fee, trade unit fees and the other charges below are added on top.
Rather talk it over?
Call 1-855-478-4290 →Taxes and charges collected with the permit
The city’s construction tax (Municipal Code 3.32.030) is adjusted quarterly; from October 1, 2026 it is $1,015.31 per residential unit, $4.36 per sq ft for industrial, office and commercial space and $341.86 per hotel room. New single-family homes and rebuilds also pay a zoning, planning and municipal code fee of $1.73 per sq ft at issuance, and housing mitigation in-lieu fees apply under the city’s BMR manual. Plan review fees are refunded in full only if review has not started within 3 business days of submittal; 80% of permit fees can be refunded if no inspection has been made and the permit is still active.
Trade permits and who may pull them
Electrical, plumbing and mechanical permits come from the Building Division. Each mechanical or plumbing/gas permit carries a $303 permit fee plus unit fees from Schedule D, such as $297 to install or relocate a residential HVAC system and $595 to re-plumb a house up to 2,500 sq ft. Licensed contractors can pull the instant versions of common trade jobs in ACA; owners doing their own work file a standard application.
- City business license. Contractors and every subcontractor on the job need a City of Cupertino business license as well as their state license, and the final inspection cannot be scheduled until they all have one. Since September 22, 2025 the city’s business licenses are administered by HdL; the base fee is $185 per calendar year.
- Fire. Fire items are reviewed, and fire inspections made, by the Santa Clara County Fire Department.
How to apply for a Cupertino building permit
Ask Planning about setbacks and approvals, and look up the parcel’s Fire Hazard Severity Zone and property information.
Licensed contractors with a qualifying job use an instant permit in ACA; small projects with complete plans can try counter review; everything else is a standard permit.
Fill out the Building Construction Permit Application. Save every plan sheet as its own landscape PDF named by sheet number and title (25 characters or less), keep supporting documents as multipage PDFs and leave files unsecured.
Send a Dropbox direct-download link with all files in one root folder to permitcenter@cupertino.gov.
Staff email a payment link; plan review fees must be paid before review starts, and review then runs in ProjectDox.
Upload responses to plan review letters in ProjectDox; once approved, pay the remaining fees and the permit is issued shortly after.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
The division’s timeline table targets 15 to 20 business days for a new single-family home and 15 for an addition or remodel once the application is deemed complete, 10 for ADUs and demolitions, 2 for residential solar and 10 for each resubmittal. Because of high volume, the Permits page currently gives average first reviews of 20 to 30 business days and 10 to 20 for later rounds. A submittal that misses the file rules does not start review, a plan review supplemental fee applies after the second review, and expedited review costs 1.5 times the plan check fee.
Inspections in Cupertino
Every issued permit needs inspections. Book them online in the city’s permit portal with the permit number, address, inspection type, preferred date and an on-site contact. A confirmation email arrives before 7:30 a.m. on the inspection day with a two-hour window, and the day’s inspection list is posted online by 7 a.m. Inspectors work 7:30 to 11:30 a.m. and 12:30 to 4 p.m. (3 p.m. on Fridays).
- Re-inspections are charged under the re-inspection fee policy at $303 an hour; a courtesy inspection can be requested by form at a 2-hour minimum.
- Fire inspections are booked with the Santa Clara County Fire Department at (408) 378-4010.
- Special inspections noted on the plans must be done by an agency on the city’s approved list.
- Close-out. Owners sign the smoke and carbon monoxide alarm and water-conserving fixture certificates; new buildings apply for a certificate of occupancy or completion, or a temporary certificate under the city’s procedure.
- Construction hours. Work is allowed weekdays 7 a.m. to 8 p.m. and weekends 9 a.m. to 6 p.m.; on holidays only a resident using household tools at a single-family home may work, 9 a.m. to 6 p.m.
California building code in Cupertino
Cupertino enforces the 2025 California codes, including the Wildland-Urban Interface Code, as amended by Ordinance 25-2278; the complete application’s submittal date, not the issue date, sets the code edition. FEMA’s Community Status Book lists the City of Cupertino (community 060339) as participating in the National Flood Insurance Program, with a current flood map dated May 18, 2009; Public Works runs the city’s floodplain management program.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Cupertino building permit FAQs
Who issues building permits in Cupertino?
The city’s Building Division at City Hall, 10300 Torre Avenue (408-777-3228, permitcenter@cupertino.gov), for all property inside Cupertino.
Want this handled start to finish?
Get a free quote →Can I get a permit the same day?
Yes for some jobs. Licensed contractors get instant permits in ACA for nine residential jobs such as re-roofs and water heaters, and small projects with complete plans can be issued after counter review, Monday to Thursday from 10 a.m. to noon.
How much does a building permit cost in Cupertino?
It depends on the work. A residential re-roof is $28 per 100 sq ft up to $500 per building; a kitchen remodel up to 300 sq ft is $1,184; a new 2,500 sq ft home starts at $14,618 for permit, plan check and inspection before surcharges and taxes.
Do I need a permit for a shed or fence?
Not for a one-story detached shed up to 120 sq ft or a fence up to 7 feet at a single-family home, unless it sits over a drain, utility easement or required setback. Electrical work in a shed still needs a permit.
How long does plan review take?
The city currently quotes 20 to 30 business days for a first review and 10 to 20 for each later round; its target table is shorter for ADUs and solar.
Does my contractor need a city business license?
Yes. The contractor and all subcontractors need a Cupertino business license, administered by HdL, before the final inspection can be scheduled.
How do I find old permits for my house?
Search Laserfiche public records by street, or submit a Request for Research to see plans; the city answers within 10 business days.
Cupertino permit search and official resources
Permit status, payments and inspection requests are in ACA. Older permits can be browsed in the city’s Laserfiche public records under Building Department, Building Permits, by street name and number, and the Agency Counter map shows building and planning permits with alerts by area. To see plans and supporting documents, file a Request for Research form; the city completes research within 10 business days. Monthly issued-permit reports are posted from 2023 on.
Inspections are where schedules slip.
Get a free quote →- Cupertino Building Division
- How to apply, submittal rules and review timelines
- Instant permits for licensed contractors
- Building inspections
- Building Division FAQ and permit exemptions
- Forms, handouts and fee schedules
- Building fee schedule, Resolution 26-047
- Planning fee schedule, Resolution 26-047
- Construction tax notice, October 1, 2026
- History of Cupertino code adoptions
- Owner-builder policy and disclosure
- Fire Hazard Severity Zone designations
- Building online services
- Public Works permit applications
- Business license information (HdL)
- 2025 California Title 24 building standards
- FEMA Community Status Book, California
Simplify Cupertino permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Cupertino sooner?
Let Alliance prepare, file, and track your Cupertino permits while your crew stays on the job.
More California permitting guides
Santa Clara County
Read guide →Gilroy
Read guide →Los Gatos
Read guide →Cypress Building Permit Guide
Read guide →Daly City Building Permit Guide
Read guide →Dana Point Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Cupertino permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.