Gilroy, California Building Permit Guide

To get a building permit in Gilroy, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Gilroy’s Building and Safety Division at 7351 Rosanna Street issues building and trade permits inside the city, with applications, plan review and inspections handled online through the GO Permit portal.

Authority: Gilroy Building and Safety DivisionFiling: GO Permit portalPhone: 408-846-0451
Authority
City Building Division7351 Rosanna St, Mon–Thu
Plan check
75% of permit fee95% from January 1, 2027
Inspections
Book in GO PermitAbout 72 hours out
Re-roof (house)
$77 + $222First 25 squares, until 2027

In Gilroy, building, electrical, plumbing and mechanical permits come from the city’s Building and Safety Division, part of Community Development at 7351 Rosanna Street (408-846-0451), open Monday to Thursday 8:30 a.m. to 4:30 p.m. Applications go in through the GO Permit portal. Under the fee schedule effective July 1, 2026, plan check is 75% of the building permit fee; a new fee schedule adopted on October 5, 2026 takes effect January 1, 2027.

What requires a building permit in Gilroy?

Gilroy requires a permit for new construction, additions, remodeling, repairs and extensions of electrical, mechanical and plumbing systems. The Building Division’s own list of examples shows how far that reaches:

Permit needed (city examples)

  • New homes and buildings, room additions and garage conversions
  • Decks, patio covers, enclosures and carports
  • Re-roofing, skylights, sliding doors and window replacements
  • Furnace and water heater replacements or additions, fireplaces and inserts
  • Fences over 7 feet, masonry walls and retaining walls
  • Sheds (other than the exemption below), signs, pools and spas
  • Sewer and water services, landscape irrigation and shower or tub enclosure replacements

No building permit

  • One-story detached tool sheds, playhouses and similar buildings up to 120 sq ft with no electrical, plumbing or mechanical work
  • Wood fences 7 feet or lower; front and side yard fences still have Planning and Engineering height and setback limits
  • Interior painting, papering and similar finish work

Even permit-free structures and exterior painting can fall under planning rules, so the city asks owners to call Planning at (408) 846-0440 first. Work started without a permit can be red-tagged; the division then decides how the project can move forward, and permit fees are doubled.

What Gilroy decides and what the state holds

The City Council adopted the 2025 California codes with local amendments in Ordinance 2025-06 on August 18, 2025, and the 2025 fire codes with amendments in Ordinance 2025-07. Gilroy’s amendments require Class A roof coverings on all hillside construction and, in wildland-urban interface areas, on new structures, roof repairs and any roof more than half replaced within a year, underground electrical service for new services, the main service disconnect on the first floor, and a concrete-encased grounding electrode in every new building. Where the Building Code and the Gilroy Fire Code conflict on sprinklers, the Gilroy Fire Code prevails.

Gilroy building department: who handles permitting

The Building and Safety Division in Community Development reviews plans and issues and inspects building, electrical, mechanical and plumbing permits for property inside Gilroy. The Chief Building Official is Hipolito Olmos. Planning, Engineering (encroachment), the city’s Fire Prevention Division, Hazardous Materials and Pretreatment permits are filed in the same GO Permit portal.

Short on time to read all of this?

Get a free quote →
Gilroy permit contacts
DetailInformation
OfficeBuilding Division, 7351 Rosanna Street, Gilroy, CA 95020
Phone408-846-0451
HoursMonday to Thursday, 8:30 a.m. to 4:30 p.m.
PortalGO Permit (permits issued after June 19, 2023)
Inspection line408-846-0235, inspect@cityofgilroy.org
Planning(408) 846-0440
Engineering / encroachment(408) 846-0223, Permit.Tech@cityofgilroy.org

Gilroy permit types

All permits are applied for in GO Permit, which handles submittals, plan review tracking, fee payment and inspection booking. The Building Division posts checklists for new projects, resubmittals, revisions, deferred submittals and solar, plus an authorization-to-act-as-agent form for anyone filing for an owner.

Residential permits

  • Small residential jobs such as water heaters, re-roofs, furnace and AC changes and window replacements have their own handouts and, under the current schedule, flat fees.
  • Remodels, additions and new homes follow the residential plan submittal guidelines and checklist, with kitchen and bath remodel handouts and a sample plot plan.
  • ADUs and JADUs are allowed on single-family, duplex and multifamily lots that have a primary home, under the city’s ADU standards and zoning section 30.54. With the city’s pre-approved ADU plans and a complete site-specific package, permits may be issued within 15 working days. Unpermitted ADUs and JADUs can be legalized through a separate city process.
  • Owner-builders sign the city’s owner-builder acknowledgment form, and an information bulletin explains the duties involved.

Commercial permits

Commercial projects use the commercial plan submittal guidelines and the required-forms handout; storage racks, antennas, EV chargers and solar have separate guidelines. Applicants for commercial permits receive the state disability-access notice, and accessibility hardship or equivalent-facilitation requests are billed by the hour.

What comes before the building permit

  • Planning entitlements. The division’s review targets apply only after land-use approvals are in place.
  • Fire. Gilroy’s Fire Prevention Division reviews fire plans; the current fire plan check fee is $610 for two hours.
  • Right-of-way. Work in the street, sidewalk or other public right-of-way needs an Engineering encroachment permit at least 10 working days before work starts; review takes 10 to 15 working days, and newly paved streets are under a street-cut moratorium.
  • Impact fees. Public Works publishes its FY 2026-2027 “Fees to Build”, including development impact fees for ADUs.

Not sure this scope needs a permit?

Get a free quote →

Gilroy permit costs and fees

Building fees are set in the City Council’s Comprehensive Fee Schedule. The schedule now in force took effect July 1, 2026, and its building fees apply through December 31, 2026; the new fees below replace them from January 1, 2027. Valuation is the higher of the applicant’s estimate or the city’s Building Valuation Table, which uses ICC data with a 124.9% Bay Area modifier and set rates for items such as garage-to-ADU conversions ($125 per sq ft), kitchen remodels ($156 per sq ft) and decks ($17 per sq ft).

Gilroy building fees through December 31, 2026 (schedule effective July 1, 2026)
ItemFee
Plan check75% of the building permit fee, paid at submittal
Expedited plan check (first round)150% of the building permit fee
General Plan Update / High Speed Rail fee13% of building and engineering fees (not on residential solar, water heater, furnace, AC, re-roof or interior remodel permits)
Building technology fee5% of permit fees
Electrical, mechanical or plumbing permit issuance$176 each
Water heater replacement / tankless / heat pump$210 / $249 / $288
Replace furnace and/or AC (house)$218
Residential re-roof$77 application plus $222 for the first 25 squares, $153 each additional 25
Residential solar, 15 kW or less$450
Demolition, 120–500 sq ft / over 501 sq ft$416 / $1,132
Re-inspection$102 plus hourly rate
Revisions or deferred submittal$172 plus hourly rate
Work started without a permitDouble the permit fee

New fees from January 1, 2027

After a fee study and a public hearing, the City Council adopted Resolution 2026-68 on October 5, 2026, replacing the Community Development fees from January 1, 2027. Under it, the building permit fee follows a published valuation table, plan review covering up to three rounds is 95% of the permit fee, and mechanical, plumbing and electrical review add 17%, 18% and 20% of the base permit fee. Each permit also pays a $204 processing fee, and a 13% community planning fee and 5% technology fee are charged on the combined permit and plan review fees (not on solar). Flat fees change too: a residential HVAC replacement becomes $200, a water heater $150 and an overlay re-roof $306 for the first 25 squares.

Rather talk it over?

Call 1-855-478-4290 →
Gilroy building permit fee by valuation, from January 1, 2027
ValuationPermit fee
$1–$2,000$306
$2,001–$25,000$408 plus $17.74 per $1,000 over $2,000
$25,001–$50,000$816 plus $24.48 per $1,000 over $25,000
$50,001–$100,000$1,428 plus $20.40 per $1,000 over $50,000
$100,001–$500,000$2,448 plus $10.20 per $1,000 over $100,000
$500,001–$1,000,000$6,528 plus $11.42 per $1,000 over $500,000
Over $1,000,000$12,240 plus $7.43 per $1,000 over $1,000,000

Worked example under the 2027 table: a $200,000 addition pays $2,448 plus 100 × $10.20, a $3,468 base permit fee, and plan review at 95% adds $3,294.60. Trade percentages, the $204 processing fee, the 13% and 5% fees and state fees are then added.

Trade permits and who may pull them

Electrical, plumbing and mechanical permits are issued by the Building Division through GO Permit. Until the end of 2026 each carries a $176 issuance fee plus item fees, such as $438 for a main service of 400 amps or less; from January 1, 2027, stand-alone trade jobs pay the $204 processing fee plus flat fees, and trade work inside a building permit is charged as a percentage of the base permit fee.

  • Business license. Every business working in Gilroy, whether based in the city or not, needs a City of Gilroy business license. Licensing is handled for the city by HdL Companies online, by phone at 408-337-0318 or by mail.
  • Owner-builders file the owner-builder acknowledgment form with the application.
  • Converting equipment. Changing or relocating a water heater, for example from tank to tankless or gas to heat pump, can add building plan review and inspection fees on top of the flat fee.

Rather not deal with the building department?

Get a free quote →

How to apply for a Gilroy building permit

1. Clear planning first

Call Planning at (408) 846-0440 about zoning, setbacks and any entitlement; building review targets start only after land-use approval.

2. Use the right checklist

Pick the handout and plan submittal checklist for your job from the Building Division’s forms page, and fill out the building permit application.

3. Apply in GO Permit

Create an account and upload the application, plans and forms, including an agent authorization if someone files for the owner.

4. Pay plan review

Plan review fees are due when plans are submitted; further rounds and revisions are billed by the hour.

5. Answer corrections

Upload revised plans with the resubmittal checklist and track each review in the portal.

6. Get the permit and job copy

Pay the remaining fees; keep the permit, the inspection record card and the city-stamped “JOB COPY” plans on site.

Review, corrections and what causes delay

The city’s target times, which exclude the submittal queue, are 9 working days for water heater, re-roof and furnace or AC permits (4 for later reviews), 17 days for an interior remodel, 19 days for an addition under 999 sq ft or an ADU under 750 sq ft, and 29 days for larger additions, larger ADUs and new homes under 5,000 sq ft. Commercial tenant improvements under 5,000 sq ft target 19 days and new commercial buildings over 5,000 sq ft 51 days. Incomplete or changed plans and deferred items trigger added hourly review fees.

Inspections in Gilroy

Inspections for permits numbered BLDR or BLDNR are booked in GO Permit; older permits with an eight-digit number use a separate scheduling link. The city is booking about 72 hours out, and a same-day cancellation or missed inspection can be charged a re-inspection fee. Check the portal shows “Scheduled”, or verify by calling 408-846-0235. The permit, the inspection card and the stamped job-copy plans must be on site for every visit.

  • Foundation. Address posted, property lines marked or corners located by a licensed surveyor (fences do not count), forms, steel, hold-downs, anchor bolts and the grounding electrode in place; special inspection reports left for the inspector.
  • Underfloor and rough. Underfloor trades and framing, then roof and shear nailing, then rough framing with plumbing pressurized and electrical, mechanical and fireplace work complete. Underfloor insulation can be combined with the underfloor inspection on jobs of 500 sq ft or less.
  • Insulation, drywall and lath, then the final, when other city departments’ clearances must be signed, fixtures working, energy certificates posted and address numbers installed.
  • After-hours inspections cost $1,017 for the first three hours under the current schedule.
  • Re-inspections cost $102 plus the hourly rate now; from January 1, 2027 the $306 re-inspection fee applies from the third re-inspection.

California building code in Gilroy

Gilroy enforces the 2025 California codes as amended by Ordinance 2025-06, with fire code amendments in Ordinance 2025-07. FEMA’s Community Status Book lists the City of Gilroy (community 060340) as participating in the National Flood Insurance Program, with a current flood map dated May 18, 2009.

Want this handled start to finish?

Get a free quote →

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Gilroy building permit FAQs

Who issues building permits in Gilroy?

The city’s Building and Safety Division at 7351 Rosanna Street (408-846-0451), Monday to Thursday, for all work inside Gilroy.

Are Gilroy’s permit fees changing?

Yes. The City Council adopted new Community Development fees on October 5, 2026 (Resolution 2026-68), effective January 1, 2027; plan review rises from 75% to 95% of the building permit fee.

Do I need a permit for a shed or fence?

Not for a one-story detached shed or playhouse up to 120 sq ft with no utilities, or a wood fence 7 feet or lower; planning height and setback rules still apply.

How much is a re-roof permit for a house?

Until the end of 2026, $77 to apply plus $222 for the first 25 squares and $153 for each further 25. From January 1, 2027 an overlay re-roof is $306 for the first 25 squares.

How long does plan review take?

City targets run from 9 working days for simple replacements to 29 for new homes under 5,000 sq ft, after land-use approval and not counting the submittal queue.

How soon can I get an inspection?

Inspections are about 72 hours out. Book in GO Permit and confirm it shows “Scheduled”.

Can I build an ADU with pre-approved plans?

Yes. With the city’s pre-approved ADU plans and a complete package, permits may be issued within 15 working days.

Gilroy permit search and official resources

Permits issued after June 19, 2023 can be tracked in GO Permit, including plan review status and inspection results. Copies of approved building plans are requested with the city’s View/Duplicate Building Plans application and affidavit, and reproduction fees are set in the fee schedule ($132 for the first large plan sheet).

Inspections are where schedules slip.

Get a free quote →

Simplify Gilroy permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Gilroy sooner?

Let Alliance prepare, file, and track your Gilroy permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Gilroy permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.