In Colton, the city’s Building & Safety Division issues building, electrical, plumbing and mechanical permits for all work inside city limits. Applications and plans go through the eTRAKiT portal or the counter at 659 N. La Cadena Drive, open Monday to Thursday from 7:30 a.m. to 5:00 p.m., and staff review each submittal before sending an invoice. Residential fees are flat amounts by size from a time-and-motion schedule: a 2,001 to 2,500 square foot house pays $1,890.31 for plan check and $2,204.87 for the permit.
What requires a building permit in Colton?
Colton requires permits and inspections for constructing, remodeling or enlarging any building or structure, and its “When Do I Need a Building Permit?” sheet adds a long list of other property improvements. The city’s list is broader than many: every fence and wall and every retaining wall, window replacements and irrigation systems all need a permit.
Permit required
- New buildings and accessory structures, including carports, garages, barns, solid and lattice patio covers, and sheds or detached structures with more than 120 square feet of roof area
- Enclosed patios, additions, alterations and garage conversions
- Remodels that add or remove any part of a wall, window or door, or enlarge an opening
- Window installation, replacement or retrofit; decks and balconies
- All fences and walls, and all retaining walls, new or demolished
- Re-roofing and roof repairs over 25% of the roof area
- Pools and spas, including above-ground models
- Electrical work, including panel upgrades, repairs or relocation and new or extended circuits
- Water heaters, water or sewer line replacement, septic work, irrigation systems (with a backflow preventer), furnaces and air conditioners
- Demolition of all or part of a building, including patio covers
No permit
- Painting, wallpapering, carpeting, cabinets and interior trim
- Minor roof patching under 25% of the roof area
- Replacing plumbing fixtures on existing piping, washers and faucets
- Repairing electrical fixtures on existing wiring and replacing switches, plugs and ballasts
- Pumping out a septic tank
The list is not all-inclusive; the city asks that questions about a specific project go to Building & Safety at 909-370-5079. For fences, walls and retaining walls, Planning sets setbacks and heights.
What the city decides and what the state holds
Colton adopts the state codes by ordinance and keeps its own amendments in Title 15 of the municipal code; the division’s page still describes the adoption of the 2022 codes under Ordinance O-14-22, with the city’s amendments in effect from January 6, 2023. The city sets its fees, impact fees, zoning and business license rules, and runs its own fire department and electric utility, both of which review plans. Building standards and contractor licenses are set by the state.
Short on time to read all of this?
Get a free quote →Colton building department: who handles permitting
The Building & Safety Division of Colton’s Development Services Department handles plan check, permits and inspections for residential, commercial and industrial work in the city; unincorporated land nearby is permitted by San Bernardino County. The same department houses the Planning Division, which shares the 909-370-5079 number. A Plan Check / Permit Status Log posted on the division page shows where projects stand in review.
| Detail | Information |
|---|---|
| Building & Safety | 659 N. La Cadena Drive (City Hall Annex), Colton, CA 92324; 909-370-5079; office Monday to Thursday, 7:30 a.m. to 5:00 p.m., phones until 6:00 p.m. |
| Inspection line | 909-370-5131 (automated), or schedule in eTRAKiT |
| Online portal | eTRAKiT: applications, uploads, invoices, inspections and property searches |
| Public Works / Engineering | 160 S. 10th Street; 909-370-5065 (grading, drainage, street improvements, impact fee calculations); grading and encroachment inspections 909-370-6190 |
| Fire Department | 303 “E” Street; fire sprinkler and alarm questions 909-370-5100; fire inspections 909-370-5553 |
| Water utility inspections | 909-370-6103 |
| Business licenses | BusinessLicense@coltonca.gov; applications at the Development Services office |
Colton permit types
The forms page carries the building permit application, the owner-builder handout and packet, an owner authorization letter, energy compliance forms for alterations, re-roofs, windows, water heaters and HVAC change-outs, and city standards for decks, garden walls, block and retaining walls, pilasters and patio covers. Final paperwork includes a contractors and owner-builders sublist, the construction waste diversion report and a self-certification form for smoke and carbon monoxide alarms and water-efficient plumbing fixtures.
Residential permits
- Routing: the city’s residential routing sheet sends a new house to Building, Planning, Fire and Colton Electric; additions add Electric when the main service panel changes, and alterations add Fire when fire system components change. It calls for two wet-stamped sets of plans and two sets of structural, energy, truss and soils documents.
- Solar: an approval letter from Colton Electric is required when a residential PV system is submitted; ground-mounted systems also go to Planning and Fire.
- Landscaping: landscape plans include a completed MWELO form, and landscape or PV systems for a new house are filed as separate permits.
- Who may draw plans: an unlicensed designer or owner-builder may prepare plans for a wood-frame house of up to two stories and a basement, up to four dwellings on a lot, and appurtenant garages, but not structural or seismic components; the Building Official may require a licensed architect or engineer even where state law does not.
- Seismic retrofit: the division posts the Earthquake Brace+Bolt program bulletin for older houses.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial and industrial projects follow the commercial plan check routing list and the separate commercial and industrial fee schedule. Every business at a commercial or industrial address needs a Business Occupancy Permit from Planning before the city will issue its business license; those occupancy inspections are held on Thursdays from 2:00 to 4:00 p.m. and are requested by email to BOP@coltonca.gov. Changes of occupancy or use follow the division’s change-of-use procedure.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Planning: the city asks applicants to check with Planning before submitting plans, and many permits need Planning or other department approval before an online submission.
- Grading: grading plans and permits come from Public Works Engineering.
- Fire: sprinkler and alarm systems are reviewed by the Colton Fire Department.
- Utilities: Colton Electric reviews new services and panel changes, and the city water utility inspects its connections.
- School fees: the city posts fee sheets for Colton Joint Unified and Rialto Joint Unified, depending on the district serving the parcel.
Colton building permit fees
Colton’s residential Building & Safety fee schedule, linked from the division page, prints no adoption date. Its notes explain that the fees are time-and-motion based, except the state Building Standards (green) fee and the strong motion fee, which are still calculated from a valuation using HdL values for the occupancy type. Additions are priced by the occupancy being added to, and items the schedule does not list are charged at the plan check hourly rate with a one-hour minimum. Each item has a plan check fee and a permit fee.
Rather talk it over?
Call 1-855-478-4290 →| Item | Plan check | Permit |
|---|---|---|
| House (R-3), up to 1,000 sq ft | $860.40 | $881.95 |
| House, 1,501–2,000 sq ft | $1,454.08 | $1,763.90 |
| House, 2,001–2,500 sq ft | $1,890.31 | $2,204.87 |
| House, 2,501–3,000 sq ft | $2,088.79 | $2,645.85 |
| Private garage, 201–500 sq ft | $225.72 | $300.00 |
| Patio cover, up to 200 sq ft / 201–400 sq ft | $73.28 / $146.55 | $56.39 / $112.79 |
| Deck or balcony, up to 200 sq ft | $65.00 | $56.39 |
| Residential pool, 301–600 sq ft | $105.99 | $142.91 |
| Block wall, up to 300 sq ft of wall | $73.25 | $65.33 |
| Wood or wrought iron fence, up to 300 sq ft | $73.25 | $65.33 |
| Residential re-roof, 1,001–3,000 sq ft | — | $221.00 |
| Single-family PV system, up to 10 kVA | $245.00 | $250.00 |
| Electrical service up to 200 amps | $72.67 | $21.67 |
| Plan check / inspection with no listed fee | $104.64 an hour | $65.00 an hour |
Worked example: a new 2,200 square foot house falls in the 2,001 to 2,500 square foot band, so it pays $1,890.31 for plan check and $2,204.87 for the building permit, $4,095.18 in all, before the valuation-based state fees, trade permits, school fees and impact fees.
eTRAKiT invoices are prepared by staff after review, and the city asks applicants to report any suspicious invoice by calling 909-370-5079. Card payments carry a 3.0% fee and e-checks $0.50, with a $300,000 limit per payment.
| Fee | Per unit |
|---|---|
| SBCTA regional circulation (infrastructure) fee | $4,007 |
| Traffic facilities (Ordinance O-020-20) | $1,623 |
| Public facilities: police, fire, library, civic center | $2,697 |
| Park development | $5,714 |
| Quimby in-lieu fee (Resolution R-03-20) | $5,605 |
| Water / wastewater, 3/4-inch or 1-inch meter | $2,968 / $4,956 |
Rather not deal with the building department?
Get a free quote →The city calls this summary an unofficial record and asks applicants to get the calculation for their project from Public Works at 909-370-5065. Planning fees were updated on March 4, 2024, and the fire prevention fee schedule dates from April 6, 2021. Under AB 602, the city also asks developers to report the total fees and exactions on completed housing projects and posts what they report.
Trade permits and who may pull them in Colton
Building & Safety issues electrical, plumbing and mechanical permits under the same residential schedule, which prices items individually: lighting and receptacle outlets by count, furnaces, air handlers and exhaust fans each, electric meter resets at $97.50 for a house, and temporary power poles. Main panel changes also go to Colton Electric.
In eTRAKiT, contractors log in with their state license number as the user name, and their first passcode is the last four digits of the phone number on the city’s record; owner-builders register as public users to schedule inspections and view records. Contractors working in Colton need a city business license through the contractor’s business license application: the filing costs $104, made up of a $65 deposit equal to the minimum business license tax, a $35 application fee and the $4 state fee, and the tax itself is based on gross receipts. Licenses for businesses located in the city expire on December 31; licenses for businesses based elsewhere expire on June 30. Owner-builders use the city’s owner-builder handout and packet.
How to apply for a Colton building permit
Confirm zoning, setbacks and any Planning approval the project needs before plans go to Building & Safety.
Use the routing sheet for the project type, the city standards and handouts, and the owner-builder or contractor paperwork.
Contractors log in with their license number; owners create a public account with an email address.
Apply in eTRAKiT and upload plans, studies and reports, or file at the counter on La Cadena Drive.
Staff review the submittal, route it to Planning, Fire, Public Works and Electric as needed, and issue an invoice.
Pay the invoice online or at the counter, then schedule inspections in eTRAKiT or on 909-370-5131.
Review, corrections and what causes delay
Incomplete electronic submittals come back with a correction from staff, and processing time depends on the permit type. Expedited review can be arranged for Building, Public Works Engineering and Fire reviews, but not for the Electric and Water utilities.
Want this handled start to finish?
Get a free quote →Colton building inspections
Call the automated inspection line, 909-370-5131, by 4:00 p.m. to schedule an inspection for the following day, or log in to eTRAKiT. Calls made on Thursday and Friday roll over to the following Monday, or the next work day after a holiday, and the inspection routing slip is usually ready by 7:30 a.m. the next morning. Inspections with no listed fee are charged at $65 an hour.
Before a certificate of occupancy is issued, other departments inspect too, and each is booked directly: Planning (909-370-5079), Public Works for grading, drainage and street improvements (909-370-5065, or 909-370-6190 for grading and encroachment permits before 4:00 p.m.), the water utility (909-370-6103) and the Fire Department (909-370-5553). Public Works inspections run from 7:30 a.m. to 5:00 p.m., with overtime fees outside those hours.
California building code in Colton
Colton’s local amendments to the state codes are in Title 15 of the municipal code. FEMA’s Community Status Book lists the City of Colton (community 060273) as participating in the National Flood Insurance Program, with flood maps effective May 8, 2024.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Colton building permit FAQs
Do I need a permit for a fence in Colton?
Yes. Colton requires a permit for all fences and walls and all retaining walls; Planning sets the setbacks and heights.
Do replacement windows need a permit?
Yes. Window installation, replacement or retrofit is on the city’s permit list.
How much does a permit for a new house cost?
It depends on size: a 2,001 to 2,500 square foot house pays $1,890.31 for plan check and $2,204.87 for the permit on the residential schedule.
When do I call for an inspection?
By 4:00 p.m. on 909-370-5131 for the next day; Thursday and Friday calls roll over to Monday.
Can I apply online?
Yes. eTRAKiT takes applications and plan uploads for Building, Planning, Fire and Public Works; staff send an invoice after review.
Is a re-roof permit required?
For re-roofing or repairs over 25% of the roof; a residential re-roof of 1,001 to 3,000 square feet is $221.
What does a contractor’s business license cost to file?
$104 at filing: a $65 tax deposit, a $35 application fee and a $4 state fee.
Colton permit search and official resources
Anyone can search a property in eTRAKiT without logging in; viewing records in detail and scheduling inspections need a login. The division’s Plan Check / Permit Status Log lists the status of projects in review.
Inspections are where schedules slip.
Get a free quote →- Building & Safety Division
- eTRAKiT information page
- eTRAKiT permit portal
- When do I need a building permit? (PDF)
- Residential fee schedule (PDF)
- Development fees page
- Impact fee summary (PDF)
- Building forms and handouts
- Residential plan check routing sheet (PDF)
- Construction permit inspections by department (PDF)
- Building design limits (PDF)
- Business License
- FEMA Community Status Book, California
Simplify Colton permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Colton sooner?
Let Alliance prepare, file, and track your Colton permits while your crew stays on the job.
More California permitting guides
San Bernardino County
Read guide →Fontana
Read guide →Grand Terrace
Read guide →Colusa County Building Permit Guide
Read guide →Commerce Building Permit Guide
Read guide →Compton Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Colton permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.