In the City of Commerce, building, grading, electrical, mechanical and plumbing permits are issued by the Building and Safety Division at City Hall, 2535 Commerce Way (323-722-4805, Monday to Thursday 8 a.m. to 6 p.m.). Plans go in through the city’s electronic plan check portal, and completed applications are emailed to the permit technician. Fees come from the Master Schedule of Fees the division posts, updated July 2021, which raises every fee by the regional consumer price index each July 1; the plan check fee is due when plans are submitted.
What requires a building permit in Commerce?
The Building and Safety Division regulates the design, construction, quality of materials, use and occupancy, location and maintenance of all buildings and structures in the city, and its fee schedule shows what it permits:
Building and grading
- New buildings, additions and alterations, priced by valuation
- New single-family homes and duplexes, at a reduced rate
- Grading by cubic yard, including cut, fill and over-excavation
- Demolition, including sewer termination
- Certificates of occupancy, including temporary ones
- House number assignment
Electrical, mechanical and plumbing
- Services, panels, circuits, outlets and appliances
- Temporary power poles and construction lighting
- Furnaces, boilers, air handlers, ducts and fans
- Commercial kitchen hoods and garage ventilation
- Plumbing fixtures, water heaters, gas piping and backflow devices
- House sewer connections and grey water systems
The division’s published pages do not include a list of work exempt from permits; the permit technician can say whether a small job needs one.
Alliance handles electrical permit filing for contractors here. More on this: who pulls the electrical permit.
What Commerce decides and what the state holds
The city sets its own fee schedule and its yearly inflation adjustment, requires covered construction projects to recycle at least 65% of their construction and demolition waste, and has the Department of Community Development oversee zoning, land use and the building codes. Fire protection and fire plan review come from the Los Angeles County Fire Department. The building code and contractor licensing are set by the state.
Commerce building department: who handles permitting
The City of Commerce Building and Safety Division reviews construction plans, issues building permits and performs the building inspections for all property in the city. The Los Angeles County Fire Department serves Commerce under a fee-for-service contract and keeps a fire prevention office at the City Hall address; its Land Development Unit, also in Commerce, sets fire department conditions for water supply and access on tract and parcel maps, conditional use permits, zone changes and variances.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | City Hall, 2535 Commerce Way, Commerce, CA 90040 |
| City Hall hours | Monday to Thursday, 8 a.m. to 6 p.m. |
| Phone | 323-722-4805 (City Hall) |
| Permit applications | permittechnician@commerceca.gov |
| Electronic plan check | Commerce ePlanSoft plan review portal |
| County fire prevention, Commerce office | 2535 Commerce Way; 323-720-9913 |
| County fire Land Development Unit | 5823 Rickenbacker Road, Commerce; 323-890-4243 |
Commerce permit types
Every application starts with the city’s Permit Worksheet, filled out in ink: project address and parcel number, a description and valuation of the work, grading quantities, the planning file number, occupancy group, construction type, floor area, stories and whether the building has fire sprinklers. Its second page lists the electrical, mechanical and plumbing items, so trade work can be priced with the building permit.
Residential permits
- New houses and duplexes pay a building permit fee that the schedule says is “reduced by 2/3rd” of the Table 1A amount, plus electrical at $0.19 per square foot (multifamily $0.16) in the schedule’s 2021 amounts.
- Pools and spas: electrical for a new in-ground residential pool is $150.85, and for other pools, spas and hot tubs $101.35 (2021 amounts).
- Rooftop solar: register with SolarAPP+, submit the design for automated review, pay the SolarAPP+ fee and download the approval document, then email the city permit application with the SolarAPP+ approval, checklist and a single-line drawing to the permit technician and schedule the inspection online; the Los Angeles County Fire Department must give its final before the solar or battery system is used.
- EV chargers follow the city’s EV charger checklist.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial and industrial projects use the same worksheet and the valuation table. In the schedule’s 2021 amounts, tenant improvements pay a Title 24 electrical energy plan check of $25.91 per 1,000 square feet and a mechanical Title 24 plan check of $50.13 per 1,000 square feet, each with a $264.01 minimum. Commercial hoods, garage ventilation, stair pressurization and product-conveying systems carry a $313.30 surcharge when part of the work, or $469.95 as an individual system, and hazardous electrical locations over 2,000 square feet add $407.29.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Planning: the worksheet asks for a planning file number, so zoning approval from the Planning Division comes first.
- Agency approvals: by signing the worksheet, the applicant accepts that approvals from the planning, fire and health agencies named on the worksheet and any other agency on the referral form are required before the building or grading permit is issued.
- Health plan check: the division links Los Angeles County Environmental Health plan check locations and a route map of city and county agencies.
- Large grading: grading plans submitted with parcel maps, tract maps or conditional use permits use a separate plan check table that starts at $14,040.33 for up to 10,000 cubic yards (2021 amount).
- Recycling: covered projects file the city’s construction and demolition recycling forms.
Not sure this scope needs a permit?
Get a free quote →Commerce building permit fees
The division links its Master Schedule of Fees, updated July 2021, as the city’s schedule of fees; its tables are still headed “Proposed Fee Schedule” and no adopting resolution is printed. Starting July 1, 2021 and every July 1 after, each fee rises by the change in the Los Angeles-Long Beach-Anaheim consumer price index, never decreasing, so the amounts below are the posted July 2021 figures, not the fees charged today: with the yearly adjustment, the amounts in force are likely higher.
| Project valuation | Table 1A fee (July 2021 amounts) |
|---|---|
| $0 to $700 | $83.00 |
| More than $700 to $25,000 | $124.75, plus $32.18 per $1,000 or fraction over $1,000 |
| $25,001 to $50,000 | $897.63, plus $24.76 per $1,000 or fraction over $25,000 |
| $50,001 to $100,000 | $1,524.48, plus $18.64 per $1,000 or fraction over $50,000 |
| Over $100,000 | $2,454.62, plus $12.71 per additional $1,000 or fraction |
| Item | Fee |
|---|---|
| Energy / disabled access / CALGreen increase to Table 1A | 10% / 5% / 5% |
| Permit issuance fee, each | $20.89 |
| Technology fee | 2% added to all fees |
| Additional plan review, or checks beyond the second, per hour | $132.01 |
| Inspection with no set fee, per hour | $93.99 |
| Demolition inspection, including sewer termination | $122.19 |
| Certificate of occupancy / temporary certificate | $62.66 / $93.99 |
| House number assignment | $33.42 |
| Each extension of a temporary certificate of occupancy | $93.99 |
Plan check, investigation (work without a permit), preliminary review and plan maintenance fees are set by Sections 107.2, 107.13, 107.15 and 107.16 of the building code, and the state Building Standards fee and strong motion (SMIP) fee are added. The division’s Permit Fee Estimate form breaks a project into plan check fee, permit fee, plan maintenance fee, issuance fee, green fee and SMIP fee. Because every amount has risen by inflation since 2021, no worked example is given here; ask the permit technician for an estimate.
Rather talk it over?
Call 1-855-478-4290 →| Cubic yards | Grading permit fee | Grading plan check fee |
|---|---|---|
| 1 to 50 | $308.39 | $545.67 (1 to 1,000 cu yd), plus $185.63 per 100 cu yd |
| 51 to 1,000 | $458.55, plus $155.27 per 100 cu yd over 100 | Same band as above |
| 1,001 to 10,000 | $1,856.81, plus $130.35 per 1,000 cu yd | $2,220.81, plus $153.95 per 1,000 cu yd |
| 10,001 to 100,000 | $3,028.85, plus $83.16 per 1,000 cu yd | $3,606.53, plus $90.92 per 1,000 cu yd |
| Over 100,000 | $10,523.57, plus $207.41 per 10,000 cu yd | $11,805.00 (to 500,000 cu yd), plus $251.31 per 10,000 cu yd |
Grading plans filed with parcel maps, tract maps or conditional use permits use Table 1C instead: the first five plan reviews are priced on the estimated yardage, each later submittal costs 10% of the original fee, and revisions are $171.28 an hour.
Trade permits and who may pull them in Commerce
| Item | Fee |
|---|---|
| Electrical service or panel, up to 399 amps / 400 to 1,000 amps | $72.69 / $141.61 |
| Receptacle, switch or lighting outlet / light fixture | $3.55 each |
| Residential appliance, 3 HP or less | $20.21 |
| Temporary power pole | $81.14 |
| Temporary lighting for construction sites, tree lots or firework stands | $40.42 |
| Furnace, heater or boiler up to 100,000 BTU / to 500,000 BTU | $48.56 / $128.45 |
| Evaporative cooler / ventilation system not part of air conditioning | $40.73 / $60.78 |
| Alteration of an existing duct system | $48.35 |
| Plumbing fixture or water heater | $30.39 each |
| Gas piping, five outlets or fewer | $30.39 |
| Backwater valve | $87.25 |
| House sewer connection / grey water system | $89.26 / $183.33 |
| Disconnecting, abandoning or repairing a house sewer or private sewage system | $57.58 |
| Electrical plan check | 70% of the electrical permit fee, minimum $264.01 |
| Mechanical / plumbing plan check | 50% of the permit fee, minimum $264.01 |
Rather not deal with the building department?
Get a free quote →The Permit Worksheet names a permit holder who is either a licensed contractor, giving the state license number, class, expiration date and workers’ compensation carrier and policy number, or an owner-builder. The division posts a separate Owner Builder Declaration and Contractor’s Declaration to file with the worksheet. The city’s Finance Department’s Business Licenses page is where a business applies for or renews a city business license.
How to apply for a Commerce building permit
Get Planning Division approval and note the planning file number for the worksheet.
Fill out the Permit Worksheet and the owner-builder or contractor’s declaration.
Upload the plan set in the city’s ePlanSoft portal and email the completed applications to permittechnician@commerceca.gov.
The plan check fee is due when plans are submitted; checks are payable to the City of Commerce.
Respond to plan check comments and obtain fire, health and other agency sign-offs from the referral form.
Pay the remaining permit, plan maintenance, issuance, green and SMIP fees before issuance.
Review, corrections and what causes delay
The worksheet’s terms set the main risks: plan check is valid for one year, after which renewal fees may apply; changing submitted plans triggers additional plan check fees; and if plans are reviewed but the other agencies’ approvals cannot be obtained, the plan check fees paid to Building and Safety are forfeited. Review needed because of plan complexity, revisions, or errors beyond the first and second check is billed at $132.01 an hour in the 2021 amounts; Table 1A itself lists additional reviews at $81.46 an hour, so ask which rate applies to a given resubmittal.
Commerce building inspections
Building inspections are performed by the Building and Safety Division, and the division’s SolarAPP+ instructions tell applicants to schedule the inspection online after the permit is issued. In the 2021 amounts, an extra inspection caused by defective work or materials is $93.99, and other inspections with no set fee are $93.99 an hour, or $47 for the first half hour of an electrical inspection. Fire inspections are separate: for solar photovoltaic and energy storage systems the applicant must contact the county fire department’s Fire Prevention Division (323-890-4125) and pass its inspection before using the system.
Want this handled start to finish?
Get a free quote →Occupancy follows the final inspection with a certificate of occupancy ($62.66 in 2021 amounts) or, where work remains, a temporary certificate ($93.99) that can be extended for the same fee.
California building code in Commerce
The Building and Safety Division checks plans against the state codes that the city adopts in its municipal code, and its fee schedule ties several fees to the building code’s administrative Section 107; the division began checking every plan submitted from January 1, 2026 against the 2025 California building, residential, electrical, mechanical, plumbing and green codes. FEMA’s Community Status Book lists the City of Commerce (community 060110) as participating in the National Flood Insurance Program, with a current flood map dated September 26, 2008 that FEMA marks as showing no base flood elevations.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Commerce permit search and official resources
Electronic submittals, review comments and resubmittals are handled in the ePlanSoft portal. For a fee estimate, the Permit Fee Request form can be sent to the division with the job address, description, square footage and valuation; questions about existing permits go to the permit technician by email or to City Hall.
- Commerce Building and Safety
- Electronic plan check portal
- Master Schedule of Fees, updated July 2021
- Permit Fee Request (estimate) form
- Permit Worksheet
- Owner Builder Declaration
- Contractor’s Declaration
- EV charger checklist
- Route map of city and county agencies
- Construction and demolition recycling
- Community Development
- Contact the City
- Los Angeles County Fire Department, Fire Prevention
- LA County Fire: solar and storage permitting
- FEMA Community Status Book, California
Inspections are where schedules slip.
Get a free quote →Commerce building permit FAQs
How much is a building permit in Commerce?
It follows Table 1A by valuation, starting at $83 in 2021 amounts and rising with inflation each July, plus issuance, technology and state fees.
Are new homes cheaper to permit?
Yes. For single- and two-family dwellings the schedule says the Table 1A fee is “reduced by 2/3rd”; ask the permit technician for the exact figure.
Can I submit plans electronically?
Yes. Plans go through the city’s ePlanSoft portal, and completed applications are emailed to the permit technician.
When do I pay?
The plan check fee at submittal; the rest before the permit is issued.
How long is a plan check good for?
One year; renewal fees may be charged after that.
Who handles fire review?
The Los Angeles County Fire Department, which has a fire prevention office at 2535 Commerce Way (323-720-9913).
Do I need a fire inspection for solar panels or batteries?
Yes. The county fire department must inspect and approve PV and energy storage systems before they are used.
Does Commerce require construction recycling?
Yes. Covered projects must recycle at least 65% of their construction and demolition waste.
Simplify Commerce permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Commerce sooner?
Let Alliance prepare, file, and track your Commerce permits while your crew stays on the job.
More California permitting guides
Los Angeles County
Read guide →Covina
Read guide →Culver City
Read guide →Compton Building Permit Guide
Read guide →Concord Building Permit Guide
Read guide →Contra Costa County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Commerce permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.