Inside Covina city limits, building permits come from the Building & Safety Division of the Community Development Department at City Hall, 125 E. College Street ((626) 384-5460), open Monday to Thursday. The city takes hard-copy submittals while it moves to Clariti online permitting, and small jobs such as a like-for-like re-roof are express permits. Eleven county pockets with Covina mailing addresses are unincorporated, so those parcels go to Los Angeles County instead. Under the city’s FY 2026-27 user fee schedule each building, mechanical, electrical or plumbing permit carries a $76 issuance fee on top of the item fees.
What requires a building permit in Covina?
Covina’s Handout #01, effective January 1, 2026, says a construction permit is needed for all new construction and, in many cases, for alteration, repair or replacement of existing fixtures. A separate plumbing, electrical or mechanical permit may be needed whenever a building’s systems are added to or changed.
Permit required
- New homes and buildings, room additions, remodels, alterations and repairs
- Demolition of any structure, and swimming pool demolition
- Decks, patio covers, re-roofing, siding and stucco
- Window and door replacements and shower or tub enclosure replacements
- Fences and block walls in front, side and rear yards, pilasters, and retaining walls over 3 feet high
- Storage sheds over 120 square feet, fireplaces and fireplace inserts
- HVAC change-outs, electrical repairs or upgrades, water heater change-outs, and water, sewer or gas line work
- New or remodeled swimming pools and spas
No building permit
- One-story detached tool or storage sheds and playhouses of 120 square feet or less (the handout notes 8 feet tall)
- Water tanks on grade under 5,000 gallons with a height-to-width ratio of 2 to 1 or less
- Exterior painting, papering and similar finish work
- Flat work and landscaping
- Prefabricated swimming pools less than 24 inches deep
The exempt list carries a note that Planning approval is still required: every shed, whatever its size, and every wall and fence needs Planning approval before Building & Safety takes plans.
What Covina decides and what the state holds
Covina enforces the statewide code through its own Building Official and plan review, and sets its own fees, zoning, construction hours (Covina Municipal Code 9.40.110 bars noisy construction between 8:00 p.m. and 7:00 a.m., on Sundays and on public holidays) and ADU standards under Ordinance No. 22-06 of May 17, 2022. Fire code review is done by the Los Angeles County Fire Department.
Covina building department: who handles permitting
The Building & Safety Division reviews plans and inspects building, plumbing, mechanical and electrical work for property inside the City of Covina. It does not handle West Covina or any of the unincorporated county addresses that share a Covina mailing address.
Short on time to read all of this?
Get a free quote →The city’s jurisdiction page says there are 11 county pockets within Covina proper. On those parcels Los Angeles County handles planning, building, code enforcement and public works, though Covina Water may still serve them. Signs that an address is in a pocket include a house number above 2999, a location south of the 10 Freeway and east of Grand Avenue, or blue county street signs instead of Covina’s green ones. The city’s GIS viewer shows county parcels in gray, and Los Angeles County’s EPIC-LA Permit Helper and Service Locator show the jurisdiction for an address.
| Detail | Information |
|---|---|
| Office | Building & Safety Division, Community Development, City Hall, 125 E. College Street, Covina, CA 91723 (east entrance or the east side of the north courtyard) |
| Phone / email | (626) 384-5460; Building@covinaca.gov |
| Hours | Monday to Thursday, 7:00 a.m. to 6:00 p.m., closed 1:00 to 2:00 p.m.; no office, plan check or inspections Friday to Sunday or on city holidays |
| Planning counter | Monday to Thursday, 7:00 a.m. to 1:00 p.m. and 2:00 to 5:45 p.m.; (626) 384-5450 |
| Engineering | Public right-of-way and grading inspections, (626) 384-5440 |
| Fire | Los Angeles County Fire Department inquiries, (626) 974-8335 |
Covina permit types
Covina splits its work into express permits, issued over the counter, and permits that need building plan check. Express permits cover like-for-like re-roofs, minor mechanical, electrical and plumbing work, and like-for-like window and door change-outs. Every project needs a site plan, and an outdoor mechanical or electrical unit must be shown at least 5 feet from the property line. Qualifying rooftop solar can use SolarAPP+ approved plans for an express solar permit. Alarm permits go through the Police Department.
Residential permits
- Additions, ADUs and JADUs need Planning approval and full plan check. A new detached ADU takes four sets of 24-by-36-inch plans with two sets of calculations and energy reports; a JADU inside the home takes three sets.
- Patios, pools and walls: a patio takes three 11-by-17-inch sets, a pool three full-size sets, and a block wall a plot plan, a licensed survey and a consent form from each neighbor sharing it.
- Remodels such as kitchens, bathrooms and re-roofs each have a numbered handout.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial projects must be pulled by an appropriately licensed contractor. An interior tenant improvement with no exterior work or change of use takes three sets of plans with calculations and energy forms, with fire plans reviewed at the same time; a restaurant adds a county health submittal. Changes of use, parking lot work and commercial solar need Planning approval first, and commercial solar also needs fire approval.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Planning approval clearance. Required for added square footage, roof pitch, color or material changes, exterior and landscaping changes, patios and porches, new or resized window and door openings, all sheds, all walls and fences, new pools and spas, commercial solar and changes of use. Plans submitted without the clearance stamp are rejected.
- Engineering and encroachment. Work in the public right-of-way, such as breaking the sidewalk or a sewer lateral connection, needs an encroachment permit issued at or before the building permit.
- Fire. New development, which can include ADUs, is reviewed by Los Angeles County Fire through EPIC-LA; tenant improvements and commercial solar go to the local fire inspector’s office. New homes, ADUs and townhomes need Fire Flow Availability Form 195 completed by the water purveyor.
- Sanitation. A new dwelling unit, such as an ADU, triggers a Los Angeles County Sanitation Districts connection clearance before issuance; a bathroom remodel does not.
- School district. New structures and added floor area check in with Azusa, Charter Oak or Covina-Valley Unified first.
Covina permit fees
Covina posts its fees as the FY 2026-27 user fee schedule on the Finance Department page; the file prints no resolution number. Building fees are listed item by item, not on a valuation table, and each permit adds the issuance fee. For a new house or a commercial building, which the item list does not cover, ask the Building Division for the fee basis.
| Item | Fee |
|---|---|
| Permit issuance (building, mechanical, electrical or plumbing) | $76 |
| Re-roof, composition or metal | $122 for the first 100 sq ft, plus $19 for each additional 100 sq ft |
| Re-roof, tile or shake | $142 for the first 100 sq ft, plus $19 for each additional 100 sq ft |
| Room addition, first story | $572 up to 500 sq ft; $183 for additional area over 500 sq ft |
| Wood-frame patio cover | $285 up to 300 sq ft |
| Gunite pool or spa | $735 up to 800 sq ft |
| Masonry wall over 3 ft and up to 6 ft | $248 for the first 100 linear feet, plus $89 per additional 100 |
| Retaining wall | $285 for the first 50 linear feet |
| Demolition | $388 |
| Stand-alone photovoltaic system (building) | $408, plus $89 for the residential solar electrical item |
| Water heater / residential A/C | $28 / $43 |
| Reinspection fee | $176 |
| Archive fee | 3% of permit value |
| Temporary occupancy certificate | $1,336 per 30 days |
| Address request | $527, non-refundable |
Rather talk it over?
Call 1-855-478-4290 →Planning charges are separate: a counter site plan review is $213, a minor site plan review $1,000, a minor site plan review for an ADU that does not qualify for the streamlined path $888, minor and major construction plan review $975 and $2,650, and the General Plan fee $2.50 per $1,000 of construction valuation. A worked example from the building list: a 2,000-square-foot composition re-roof is $122 plus 19 × $19, or $483, plus the $76 issuance fee, before the archive fee.
Development impact fees may apply to an ADU before occupancy, and the sanitation and school districts bill their own charges.
Trade permits and who may pull them in Covina
Mechanical, electrical and plumbing permits are separate city permits, priced per item and issued while you wait for most stand-alone jobs; a new electrical service needs a single-line diagram.
- Plumbing: for an owner-occupied home and for single-family or duplex rentals, the owner or a contractor can apply. For other categories of trade work, the handout says an appropriately licensed contractor may apply.
- Contractors bring photo ID, their state license pocket card, proof of workers’ compensation and a current City of Covina business license, which may be paid at issuance.
- Agents for a contractor bring an original authorization letter on company letterhead naming a person, not a business, valid for up to one year. Agents for an owner-builder file the city’s Authorized Agent form, and Handout #01 says authorization letters must be notarized.
- Tenants cannot pull a permit unless authorized as the owner’s or contractor’s agent.
- Fire sprinklers and alarms are permitted by Covina and inspected by the Los Angeles County Fire Department.
A new Covina business license application costs $31 to process.
How to apply for a Covina building permit
Use the city’s jurisdiction page, the GIS viewer or EPIC-LA Permit Helper; county-pocket addresses file with Los Angeles County.
Projects on the Planning list need a Planning Approval Clearance, which is then placed inside the plan set.
Each project type has a numbered handout listing the plans, calculations and forms to bring.
Fill in the permit application and add the site plan plus owner-builder, contractor or agent documents.
Email the package so a technician can spot problems, then drop the complete set at the counter or mail it; incomplete counter drop-offs are rejected.
Return the address, Form 195, school district, sanitation and environmental clearances, pay the invoice, show ID and pick up the job card.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
The city says a first plan check can take 4 to 6 weeks, although its plan review consultant averages 10 working days for room additions and other minor projects; solar can take 1 to 6 business days and commercial solar longer because of the fire review. Covina offers no expedited plan check. A plan check is good for 180 days, and fees apply to reactivate it after that. Missing Planning stamps and incomplete drop-offs are the delays the city names.
Inspections in Covina
To request an inspection, email bldinspections@covinaca.gov with the address, the permit number (BLD##-###), the inspection code and type, and a contact name and phone number. Requests received before 3:00 p.m. are scheduled for the next business day, and there are no inspections Friday to Sunday or on holidays. The daily inspection route is posted online and on the recorded line at (626) 384-5460, option 2, both updated by 5:00 p.m., split into morning and afternoon shifts. Inspectors take calls from 7:15 to 8:45 a.m. To cancel, email the inspection address, or call on the day itself.
Have the approved plans and the orange permit card on site, an adult 18 or older present, pets secured, ladders that meet OSHA rules and electrical panels open; no work may be covered before it is inspected. Special inspectors must register with the city first. Grading and right-of-way work is inspected by Engineering and landscape work by Planning.
A permit expires if work does not start within 180 days of issuance or goes 180 days without a passed inspection; the city also says permits are good for 365 days after issuance. One written extension of up to 180 days may be granted for hardship if you ask before expiry.
California building code in Covina
Covina’s main handouts (#01, #03A, #14 and IB-02) are marked effective January 1, 2026, the date the 2025 California codes took effect, and its ADU handout adds the 2023 Los Angeles County Fire Code to the list designers must cite. FEMA’s Community Status Book lists Covina (community 065024) as participating in the National Flood Insurance Program, with no special flood hazard area mapped in the city. The fee schedule still carries a $203 FEMA flood zone review item for parcels where one is needed.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Want this handled start to finish?
Get a free quote →Covina building permit FAQ
Is my Covina address in the city or the county?
Not always the city. There are 11 unincorporated county pockets with Covina addresses. Addresses above 2999, parcels south of the 10 Freeway and east of Grand Avenue, and blue street signs usually mean Los Angeles County. Check the city’s GIS viewer or EPIC-LA Permit Helper before you apply.
Do I need a permit for a shed in Covina?
A one-story detached shed of 120 square feet or less needs no building permit, but Covina requires Planning approval for every shed regardless of size. Sheds over 120 square feet need a building permit as well.
Do I need a permit for a fence or block wall?
Yes. Covina lists fences and block walls in every yard as permit work, Handout #18 says all masonry, wood and wrought-iron fences need a building permit, and every wall and fence needs Planning approval first.
Can I apply online?
Not yet. Covina takes hard copies at the counter or by mail, asks for an emailed copy first, and is moving to Clariti online permitting.
How much does a re-roof permit cost?
A composition or metal re-roof is $122 for the first 100 square feet and $19 for each further 100, plus the $76 issuance fee, so a 2,000-square-foot roof comes to $559 before the 3% archive fee.
Can a homeowner pull a permit in Covina?
Yes, for residential property. Owner-builders bring photo ID, a recorded deed if ownership changed recently, and the signed owner-builder notice. Commercial projects must be pulled by a licensed contractor.
Covina permit search and official resources
Covina’s Public Records Portal holds the city’s published records, and the Building Division keeps forms for a change of record (IB-30 and IB-31) and for duplicating plans (IB-40). The fee schedule charges $230 for the first half hour of building research and $114 for each further half hour.
Inspections are where schedules slip.
Get a free quote →- Covina Building & Safety Division
- Apply for a permit
- Informational handouts and forms
- Handout #01: Do I need a permit?
- IB-02: Who can pull a permit
- IB-11: Prerequisites packet
- Handout #14: Mechanical, electrical and plumbing permits
- Handout #03A: Residential ADU
- Handout #18: Block walls and fences
- Building inspections
- Daily inspection route
- Check address jurisdiction
- Planning Division and ADU information
- User fee schedule, FY 2026-27 (PDF)
- SolarAPP+ express solar permits
- Covina Public Records Portal
- Los Angeles County EPIC-LA (county pockets)
Simplify Covina permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Covina sooner?
Let Alliance prepare, file, and track your Covina permits while your crew stays on the job.
More California permitting guides
Los Angeles County
Read guide →Culver City
Read guide →Diamond Bar
Read guide →Cupertino Building Permit Guide
Read guide →Cypress Building Permit Guide
Read guide →Daly City Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Covina permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.