In Grand Terrace, the city’s Building & Safety Division issues building, grading, electrical, plumbing and mechanical permits for all property inside city limits from City Hall, 22795 Barton Road (909-954-5181). Permit fees come from valuation tables updated on November 18, 2026, plus a $59 issuance fee; simple permits are issued over the counter, and plan check takes about 10 business days or less. Solar, electrical, plumbing, mechanical and re-roof permits can be filed electronically.
What requires a building permit in Grand Terrace?
The division’s FAQ says most new construction, remodeling, electrical, plumbing, mechanical and structural repair or replacement needs a building permit, and it gives a partial list of typical projects; anyone unsure is asked to contact Building & Safety.
Permit required
- New homes and buildings, room additions, patio enclosures, sunrooms and carports
- Kitchen and bathroom remodels and garage conversions
- Decks and patio covers, and storage sheds larger than 120 square feet
- Swimming pools and spas
- Re-roofing, exterior siding, skylights, insulation and drywall
- Window and door installations or alterations
- Water heaters, water softeners, re-piping and fixture replacement or installation (sinks, toilets, shower valves, outlets, switches)
- Fireplaces and fireplace inserts, HVAC systems and wall heaters
- Electrical services, sub-panels and re-wiring; shower and tub enclosure replacements
- Fences and retaining walls, depending on scope (check Planning’s standards)
No permit (2025 CRC R105.2)
- One-story detached storage sheds, playhouses or similar buildings of 120 square feet or less
- Retaining walls up to 4 feet from the bottom of the footing to the top of the wall, unless supporting a surcharge
- Painting, papering, carpet and similar work
- Decks of 200 square feet or less, no more than 30 inches above grade, not attached to the house and not serving the required exit door
- Sidewalks and driveways
Exempt work may still need approval from the Planning Division or the Public Works Department. Commercial HVAC installations, and residential HVAC units placed on a roof, need Planning approval as well as a permit.
What the city decides and what the state holds
The city lists the 2025 California codes it enforces, together with the 2021 International Property Maintenance Code and the 1997 Uniform Code for the Abatement of Dangerous Buildings, and it sets its own fees, development impact fees, zoning standards for fences and walls, and the expedited solar process its City Council adopted by ordinance on August 11, 2015. The building standards themselves and contractor licenses come from the state.
Grand Terrace building department: who handles permitting
The Building & Safety Division, part of the city’s Planning & Development Services Department, answers construction questions, reviews plans for compliance with local, state and federal rules, issues building, grading and related construction permits, inspects active permits and enforces building codes. Property outside the city is permitted by San Bernardino County. The permit application carries a Planning staff box for General Plan consistency, zoning conformity and conditions of approval.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Building & Safety | City Hall, 22795 Barton Road, Grand Terrace, CA 92313; 909-954-5181; fax 909-824-6623 (the fee schedule and permit application list 909-824-6624) |
| Hours | Monday to Friday; permit hours 1:00 to 4:30 p.m. and counter hours 8:00 a.m. to 5:00 p.m. on the division page (the FAQ page lists 8:00 a.m. to 4:30 p.m. for both) |
| Inspection requests | Online request form linked from the division page; cancel or reschedule by email to Inspections@grandterrace-ca.gov |
| Payments | Cash, check, or card (Visa, MasterCard, Discover) plus 2% |
| Planning & Development Services | 909-954-5176 (development impact fees) |
| City Hall main line | 909-954-5200 |
Grand Terrace permit types
The 2026 Building Division permit application asks for the job site address, a description of the work, the square footage and assessor’s parcel number, the property owner, the contractor and CSLB number, the design professional, and the total valuation of the work broken into building, electrical, mechanical and plumbing amounts. Its second page is a checklist of electrical, mechanical and plumbing items. The division also posts a special inspector registration package, a smoke and carbon monoxide alarm self-certification form, standard details and an expedited permitting checklist for electric vehicle charging stations.
Residential permits
- Over the counter: permits that need no plan submittal are issued at the counter.
- With plans: additions, new homes, patio covers and similar projects go through plan check, which the city estimates at around 10 business days or less depending on complexity and the information the design professional provides.
- Electronic permits: solar, mechanical, electrical, plumbing and re-roof permits can be filed online; staff review the application within 48 to 72 hours on weekdays and send a payment link, the applicant tells staff once payment is made, and the permit materials are emailed within one to two business days.
- Solar: online solar submittals are reviewed in 3 to 5 business days, and the permit and job card are emailed after payment. Under the city’s 2015 expedited solar ordinance, systems of 10 kW or less can also be filed over the counter with a completed application and two copies of plans, with processing of up to 3 business days.
- Pre-engineered patio covers: a pre-engineered or city standard patio cover has a flat $705 fee; other patio covers are priced from the valuation table.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial projects use the same application and valuation tables. Commercial HVAC installations need Planning approval, a building occupancy inspection costs $226, and CASp application and evaluation, plan re-checks and other unlisted plan checks are billed at the division’s hourly rate. Stormwater (NPDES) inspections are charged against a deposit at actual cost, and commercial kitchen hoods, walk-in boxes and grease traps carry their own fees.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Planning sign-off: the application’s Planning box records General Plan consistency, zoning conformity and any conditions.
- Fences and walls: Planning sets development standards, heights and frontage rules for fences and retaining walls.
- Public Works: encroachment permits are processed by Public Works; the city’s 2023 fee update set the processing fee at $60, with inspections at actual contract cost.
- Impact fees: new development pays development impact fees by square foot, calculated by Planning & Development Services.
Grand Terrace building permit fees
Permit fees are based on the total construction valuation, including labor and materials. The current Building & Safety fee schedule PDF is marked updated November 18, 2026 (the division page still calls it the fee schedule effective 2023) and charges a plan check fee and a building permit fee from separate tables, plus a $59 issuance fee on each permit.
| Valuation | Plan check | Building permit |
|---|---|---|
| Up to $2,000 | $90 | $452 |
| $2,001–$25,000 | $90 + $15.75 per $1,000 over $2,000 | $452 + $6.50 per $1,000 over $2,000 |
| $25,001–$50,000 | $452 + $25 per $1,000 over $25,000 | $602 + $3.50 per $1,000 over $25,000 |
| $50,001–$75,000 | $1,077 + $11 per $1,000 over $50,000 | $690 + $20.50 per $1,000 over $50,000 |
| $75,001–$100,000 | $1,352 + $14.50 per $1,000 over $75,000 | $1,203 + $10.75 per $1,000 over $75,000 |
| $100,001–$250,000 | $1,715 + $3 per $1,000 over $100,000 | $1,472 + $5.75 per $1,000 over $100,000 |
| $250,001–$500,000 | $2,165 + $2 per $1,000 over $250,000 | $2,335 + $8 per $1,000 over $250,000 |
| $500,001–$750,000 | $2,665 + $3 per $1,000 over $500,000 | $4,335 + $2.75 per $1,000 over $500,000 |
| $750,001–$1,000,000 | $3,415 + $4.50 per $1,000 over $750,000 | $5,023 + $6 per $1,000 over $750,000 |
| $1,000,001–$2,000,000 | $4,540 + $3.50 per $1,000 over $1,000,000 | $6,523 + $3.50 per $1,000 over $1,000,000 |
| Over $2,000,000 | $8,040 + $3.50 per $1,000 over $2,000,000 | $10,023 + $2.25 per $1,000 over $2,000,000 |
Rather talk it over?
Call 1-855-478-4290 →Worked example: a $40,000 room addition pays plan check of $452 plus 15 times $25, or $827, and a building permit fee of $602 plus 15 times $3.50, or $654.50. With the $59 issuance fee, the total is $1,540.50 before any separate trade items. A new home valued at $250,000 pays $2,165 for plan check, $2,334.50 for the permit and $59 for issuance, $4,558.50 in all.
| Item | Fee |
|---|---|
| Demolition permit | $343 |
| Pre-engineered or city standard patio cover | $705 |
| Decks (the schedule labels this line “based on valuation”) | $705 |
| In-ground private pool or built-in spa | $1,218 |
| Above-ground pool or portable spa | $811 |
| Residential solar PV | $450, plus $15 per kW over 15 kW |
| Commercial solar, 0–50 kW | $1,000 |
| EV charging system, residential / commercial | $407 / $1,401 |
| Stand-alone electrical, mechanical or plumbing plan check | $181 |
| Building occupancy inspection | $226 |
| After-hours inspection (4-hour minimum) | $723 |
The city’s 2023 fee update added a Community Development technology surcharge of 7.5% of all Building & Safety fees. Development impact fees are charged by the square foot under the city’s master DIF schedule, which draws on a 2026–27 nexus study; the City Council may set fees at or below the maximum the study supports.
| Land use | Total per sq ft |
|---|---|
| Single-family detached | $7.184 |
| Multi-family attached | $11.600 |
| Manufactured or mobile home | $10.486 |
| General commercial | $5.927 |
| Office commercial | $2.323 |
| Industrial | $1.179 |
Rather not deal with the building department?
Get a free quote →At those rates, a 2,000 square foot single-family house carries $14,368 in development impact fees.
Trade permits and who may pull them in Grand Terrace
Building & Safety issues electrical, mechanical and plumbing permits, each with a $39 processing fee and item fees from the schedule: an electrical service up to 400 amps is $181 and one of 401 to 1,000 amps $407, a meter reset $226, a temporary power service $136, a furnace or HVAC combination unit up to 100,000 BTU/h $136, a water heater $90 (tankless $181), re-piping up to 150 linear feet $181, a backflow preventer $181 and a septic tank $542. A residential kitchen stove hood with duct is $949. Other common items are $136 each: a building sewer, an evaporative cooler, a ventilation fan, an appliance vent, a roof drain system, a water softener or a solar water heating system; a plumbing gas system of up to 10 outlets is $136 and a grease trap $407. These trade permits, along with solar and re-roofs, can be filed through the electronic permitting process.
The application records the contractor’s CSLB license number. Homeowners may apply for their own permits by completing the city’s owner-builder form. Work done without a permit is inspected at the hourly rate for inspection of unpermitted work.
How to apply for a Grand Terrace building permit
Check the permit list and exemptions, and ask Planning about setbacks, heights and any land use case.
Fill in the 2026 permit application, including the valuation split by trade and the contractor or owner-builder details.
File solar, electrical, plumbing, mechanical and re-roof permits electronically; bring other projects and plans to the counter during permit hours.
Projects with plans go through Planning sign-off and Building plan check, typically about 10 business days or less.
Pay the invoice online, or at City Hall by cash, check or card (plus 2%).
Electronic and solar permits and job cards are emailed after payment.
Use the online inspection request form and wait for a confirmation.
Review, corrections and what causes delay
Plan check time depends on the project’s complexity and the information the design professional supplies; staff can estimate a timeline at submittal or by phone. For electronic permits, nothing moves after payment until the applicant notifies staff, and plan re-checks are billed at the hourly rate.
Want this handled start to finish?
Get a free quote →Grand Terrace building inspections
Request inspections through the online form linked from the Building & Safety page (a QR code is also posted), and make sure you receive a confirmation. To cancel, reschedule or ask about an inspection, email Inspections@grandterrace-ca.gov. Re-inspections and safety inspections are charged at the division’s hourly rate, and after-hours inspections cost $723 with a four-hour minimum.
A building permit is typically valid for six months from the date it is issued or from the last approved inspection, so keep inspections moving to keep the permit active. The schedule also lists a building occupancy inspection at $226.
California building code in Grand Terrace
Grand Terrace lists the 2025 editions of the California Building, Residential, Electrical, Mechanical, Plumbing, Green, Fire, Energy, Historical, Existing Building, Administrative and Referenced Standards codes as its currently adopted codes. FEMA’s Community Status Book lists the City of Grand Terrace (community 060737) as participating in the National Flood Insurance Program, with flood maps effective September 2, 2016.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Grand Terrace building permit FAQs
How are building permit fees calculated in Grand Terrace?
From the project’s total valuation, including labor and materials, using separate plan check and permit tables, plus a $59 issuance fee.
Does a shed need a permit?
Not if it is a one-story detached shed or playhouse of 120 square feet or less; larger sheds need a permit.
Can a homeowner pull a permit?
Yes. Homeowners complete the city’s owner-builder form.
How long does plan check take?
Around 10 business days or less, depending on the project; permits without plans are issued over the counter.
How long is a permit valid?
Typically six months from issuance or from the last approved inspection.
Can I apply online?
Yes, for solar, mechanical, electrical, plumbing and re-roof permits; staff send a payment link within 48 to 72 hours.
How much is a pool permit?
$1,218 for an in-ground private pool or built-in spa and $811 for an above-ground pool or portable spa.
What are the impact fees on a new house?
$7.184 per square foot for a single-family detached home under the master DIF schedule.
Grand Terrace permit search and official resources
For the status of a permit or inspection, call Building & Safety at 909-954-5181 or email the inspections address with the permit number.
Inspections are where schedules slip.
Get a free quote →- Building & Safety Division
- Building & Safety fee schedule, updated November 2026 (PDF)
- Building permit application (PDF)
- Building & Safety FAQs
- Electronic building permit submittals
- Solar permits
- Development impact fees
- Master DIF schedule (PDF)
- 2023 fee update (PDF)
- FEMA Community Status Book, California
Simplify Grand Terrace permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Grand Terrace sooner?
Let Alliance prepare, file, and track your Grand Terrace permits while your crew stays on the job.
More California permitting guides
San Bernardino County
Read guide →Hesperia
Read guide →Highland
Read guide →Grass Valley Building Permit Guide
Read guide →Greenfield Building Permit Guide
Read guide →Grover Beach Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Grand Terrace permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.