To get a building permit in Claremont, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Claremont’s Building Division at City Hall, 207 Harvard Avenue, issues building, electrical, plumbing and mechanical permits inside city limits; plan sets are emailed for electronic review and simple permits are issued over the counter Monday to Thursday.

Authority: Claremont Building DivisionFees: User fee schedule, July 1, 2026Phone: 909-399-5471
Authority
City Building Division207 Harvard Avenue
Permit counter
Mon–Thu 7:00–5:30Over the counter if no plans
Issuance fee
$61.80 per permitPlan check 80% of permit fee
Inspections
Mon–Thu 8–5Request online

In Claremont, building permits come from the City’s Building Division at City Hall, 207 Harvard Avenue (909-399-5471), where Joe Caro is the Building Official. Projects with plans are emailed to the division for electronic plan check, while permits without plans are issued over the counter Monday to Thursday from 7:00 a.m. to 5:30 p.m. Under the Citywide User Fee Schedule effective July 1, 2026 each permit carries a $61.80 issuance fee and plan check costs 80% of the building permit fee.

What requires a building permit in Claremont?

The Building Division requires permits for building, remodeling or enlarging any building or structure and for other improvements to a property. The City calls its list of examples a guideline rather than a complete list.

Permit needed

  • New buildings and accessory structures, additions and patio covers
  • Demolition of all or part of a structure, including patio covers
  • Garage conversions
  • Remodels that add or remove any part of a wall, window or door, or enlarge an opening
  • Window and door installation, decks and balconies
  • Electrical panel upgrades, repairs or moves, and new or extended circuits
  • Plumbing work, water heaters, and water or sewer line replacement
  • Furnace or air conditioning installation or replacement
  • Roof installation, replacement or re-cover
  • Swimming pools, including above-ground pools, and spas

No permit

  • Painting, wallpapering, carpeting, cabinets and interior trim
  • Repairing electrical fixtures on existing wiring
  • Replacing switches, plugs and light ballasts
  • Pumping out a septic system

A self-contained, portable plug-in spa still needs an electrical permit. Walls, fences and patio covers have their own City handouts, including standards for freestanding walls, retaining walls, block walls on top of a retaining wall, masonry pilaster fences and patio covers, and an agreement form for a shared property-line wall.

What Claremont decides and what the state holds

Claremont sets its own user fees, runs design review for new construction and exterior changes, keeps a Register of Structures of Historical and Architectural Merit and regulates accessory dwelling units under Chapter 16.333 of the Claremont Municipal Code. It has also adopted a streamlined permitting ordinance for electric vehicle charging. Contractor licensing is handled by the state.

Claremont building department: who handles permitting

The Building Division of Claremont’s Community Development Department reviews plans, issues permits and inspects construction inside city limits. Its page names Joe Caro as Building Official. Before you apply, the division asks you to check with the Planning and Engineering divisions, which issue their own approvals. Property outside the city limits is not handled here; unincorporated Los Angeles County land is permitted by LA County Public Works Building and Safety.

Short on time to read all of this?

Get a free quote →
Claremont permit contacts
DetailInformation
OfficeBuilding Division, City Hall, 207 Harvard Avenue, Claremont, CA 91711
Building Division909-399-5471, buildingapplications@claremontca.gov
Building OfficialJoe Caro, 909-399-5477
Permit issuanceMonday to Thursday, 7:00 a.m. to 5:30 p.m.
InspectionsMonday to Thursday, 8:00 a.m. to 5:00 p.m.
Planning Division909-399-5470
Engineering Division909-399-5465
City Hall main line909-399-5460

Claremont permit types and what comes first

Claremont issues building permits and separate electrical, plumbing and mechanical permits, each with its own issuance fee. Permits without plans are handled over the counter at City Hall; anything with a plan set goes through electronic plan check.

Residential permits

Residential plan sets (new homes, additions and remodels) must meet the division’s Residential Submittal Requirements: a cover sheet with the parcel number, a detailed scope that matches the application, code references, the fire sprinkler status of existing and new structures, deferred submittals and required deputy inspections; a site plan with setbacks, drainage, impervious surfaces and the distance from the nearest fire hydrant; floor plans and elevations; electrical, plumbing and mechanical plans where new work is proposed, with load calculations when new electrical loads total more than 40 amps; framing and foundation plans; structural details stamped by an engineer or architect unless the design follows the prescriptive California Residential Code; an energy analysis; and a construction and demolition diversion plan.

Accessory dwelling units follow the City’s ADU rules: one ADU and one junior ADU per single-family lot, an ADU of 150 to 1,000 square feet, a 4-foot minimum setback, a 16-foot height limit and exterior windows, colors, materials and roof that match the main house. Within 8 feet of a property line the unit may have no exterior entrances on that side and no windows lower than 6 feet above the ground. The ADU application needs the owner’s notarized signature.

Commercial permits

Commercial projects use the division’s Commercial Submittal Requirements and the same electronic submittal. The cover sheet must also state the occupancy classification and maximum occupancy, and the site plan must show all parking, including accessible and EV spaces. Any commercial project that affects accessibility needs a deputy inspection report from an accessibility expert (CASp-certified or approved by the Building Official) at final inspection, noted on the cover sheet. New non-residential buildings pay electrical, plumbing and mechanical system fees of 18% of the building permit fee each, against 20% for new residential buildings; alterations are charged by the unit fee schedule. Electrical plan check is added when the service exceeds 400 amps.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Design review. The Planning Division’s Design Review Packet applies to new construction, exterior changes to existing buildings, building relocations, changes to site features, landscaping and signs. The application must be signed by the owner and notarized (an agent attaches a notarized letter from the owner) and comes with three full-size plan sets and a PDF set, elevations, window, door and veneer details, a color and materials board and landscape and irrigation plans. Depending on the project it is decided by staff, the commission marked APC on the form, or the City Council, and listed historic properties may need a Certificate of Appropriateness.
  • Historic resources. The City keeps a Register of Structures of Historical and Architectural Merit, and owners of historic properties can apply for a Mills Act contract that lowers property taxes in exchange for agreed preservation work.
  • Engineering. Grading, drainage, on-site improvements and work in the public right-of-way are checked by the Engineering Division under its own fees; a room addition or on-site improvement under 500 square feet is charged $206.40 plus 2.5% of the construction cost for grading and drainage plan check.
  • Utility service. Southern California Edison asks applicants to contact it early when a project may need electrical system upgrades.

Claremont permit fees

Building fees are set in the Citywide User Fee Schedule effective July 1, 2026. New construction is priced from the City’s building valuation table; each permit adds an issuance fee, and plan check is a percentage of the permit fee.

Claremont building valuation table, all new construction (effective July 1, 2026)
ValuationFee
$1 to $2,000$56.38 base plus $4.88 per $100
$2,001 to $25,000$105.09 base plus $22.57 per $1,000
$25,001 to $50,000$623.82 base plus $18.79 per $1,000
$50,001 to $100,000$1,093.40 base plus $16.90 per $1,000
$100,001 and up$1,938.63 base plus $9.40 per $1,000

Rather talk it over?

Call 1-855-478-4290 →
Other Claremont building fees (effective July 1, 2026)
ItemFee
Permit issuance (building, electrical, plumbing or mechanical)$61.80 per permit
Building plan check80% of the building permit fee, when valuation exceeds $1,000
Plumbing or mechanical plan check80% of the trade permit fee
General Plan maintenance10% of building permit and plan check fees
Technology maintenance2.5% of building permit and plan check fees
Water heater and/or vent$59.05 each
Plumbing fixture or trap$47.30 each
Furnace installation or relocation$59.05 each
Electrical service up to 200 amps$94.50
Solar permit issuance$244.60
Demolition permit$139.20
Reinspection$125
Expedited plan review50% of standard plan review fees
Certificate of occupancy / temporary certificate$169 / $316.85
Work without a permitEqual to the permit fee, at least $554.75 ($257.60 for an owner-builder’s one- or two-family home, with Building Official approval)

Worked example. A water heater replacement is a plumbing permit: the $61.80 issuance fee plus the $59.05 unit fee for a water heater and vent comes to $120.85 before any surcharges. The valuation table’s band starting figures do not join up exactly with the per-$1,000 rates, so no worked example is given here for larger projects.

Plan revisions are charged at $197.25 an hour (two-hour minimum) or $218.25 over the counter, extra review beyond the second plan check at $218.25 an hour, preliminary code consultations at $457.60, and inspections after business hours at $354.55.

Trade permits and who may pull them

Electrical, plumbing and mechanical permits are issued by the Building Division, each with a $61.80 issuance fee. For new buildings the trade fee is a share of the building permit fee; for additions and alterations it follows the unit schedule, for example $53.15 for the first 20 receptacles, switches or lighting outlets and $11.80 for each one after that, $76.80 for the wiring of a pool, hot tub or spa, and $29.55 per gas piping outlet.

Rather not deal with the building department?

Get a free quote →

The application packet includes a fillable Contractor Declaration form, and the inspection page puts the responsibility for confirming that work is ready on the general contractor, the owner-builder or their authorized representative. Owner-builders of one- or two-family homes also appear in the fee schedule, which sets a lower minimum investigation fee for their unpermitted work when the Building Official approves it. Contractor licenses come from the state.

How to apply for a building permit in Claremont

1. Check Planning and Engineering

Call Planning (909-399-5470) and Engineering (909-399-5465) to find out whether design review, a planning permit or engineering approval is needed first.

2. Fill in the worksheet

Complete the Building Permit Worksheet/Application and the Contractor Declaration form.

3. Assemble the plan set

Follow the Residential, Commercial or Demolition submittal checklist; the division refuses submittals that do not include every listed item.

4. Submit

Email the worksheet, plans and supporting documents to buildingapplications@claremontca.gov or upload them through the City’s online form. Permits without plans can be issued over the counter.

5. Plan check and corrections

Respond to plan check comments; reviews after the second round are billed by the hour.

6. Pay and receive the permit

Pay the issuance, permit and plan check fees and collect the permit during counter hours, Monday to Thursday.

Review, corrections and what causes delay

The Apply page warns that submittal responses are running one week behind because of high volume. Incomplete submittals are refused outright, so a missing load calculation, energy analysis or diversion plan sends the application back to the start. Expedited plan review is available at 50% of the standard plan review fee.

Inspections in Claremont

Inspections are requested online from the division’s Inspections page, which also shows the next available inspection date and links the Online Permit Search for inspection status. Have the address, inspection type, permit number and a contact phone number ready. Inspectors work Monday to Thursday from 8:00 a.m. to 5:00 p.m.

Before requesting an inspection, the general contractor, owner-builder or authorized representative must confirm that all the work to be inspected is complete. Re-inspections are made on request and cost $125 each. Results and the status of each inspection can be checked through the City’s Online Permit Search. A certificate of occupancy costs $169, and a temporary certificate costs $316.85 and may need a bond.

Building code in Claremont

Claremont enforces the state codes through its Building Division, and the fee schedule cites Chapter 15.04 of the Claremont Municipal Code for local building provisions such as the temporary certificate of occupancy bond. FEMA lists Claremont as a participating community in the National Flood Insurance Program, with no special flood hazard area mapped in the city.

Want this handled start to finish?

Get a free quote →

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Frequently asked questions

Who issues building permits in Claremont?

The City’s Building Division at City Hall, 207 Harvard Avenue, issues building, electrical, plumbing and mechanical permits for property in Claremont. Joe Caro is the Building Official.

How much is a building permit in Claremont?

Each permit has a $61.80 issuance fee. New construction is priced from the valuation table (for example $623.82 base plus $18.79 per $1,000 between $25,001 and $50,000), plan check adds 80% of the permit fee, and General Plan (10%) and technology (2.5%) fees follow.

Do I need a permit to replace a water heater in Claremont?

Yes. The City lists water heater replacement, relocation or installation as permitted work; the plumbing permit is $61.80 plus $59.05 for the water heater.

Do I need a permit for a new roof?

Yes. Roof installation, replacement or re-cover all need a building permit in Claremont.

How do I submit plans?

Email the worksheet and plan set to buildingapplications@claremontca.gov or upload them through the City’s online form; permits without plans are issued over the counter Monday to Thursday.

Can I build an ADU in Claremont?

Yes, on lots zoned for single-family or multi-family homes. A single-family lot may have one ADU and one junior ADU; ADUs range from 150 to 1,000 square feet with a 16-foot height limit and must match the main house.

How do I schedule an inspection?

Request it online from the Inspections page with your permit number and inspection type. Inspections run Monday to Thursday, 8:00 a.m. to 5:00 p.m.

How can I check a permit’s status?

Use the City’s Online Permit Search, linked from the Permit Status Inquiry page, which also shows inspection results.

Claremont permit search and official resources

The Permit Status Inquiry page opens the City’s online building permit search, which shows permits and inspection results. Photocopies of permits and other City records cost $0.10 a page under the user fee schedule, and full-size plan prints are $29.65 or $48.70 a sheet.

Inspections are where schedules slip.

Get a free quote →

Simplify Claremont permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Claremont sooner?

Let Alliance prepare, file, and track your Claremont permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Claremont permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.