Inside Agoura Hills, building, electrical, plumbing and mechanical permits come from the city’s Building and Safety Division in the Community Development Department at City Hall, 30001 Ladyface Court (818-597-7334); Lukas Quach is the Building Official. Applications can be filed online through MGO Connect or at the counter. Under the master fee schedule effective August 26, 2026, permits are priced from the project valuation, plan check is 95% of the building permit fee, and a 7% technology fee and a General Plan fee of 1.19% of valuation are added.
What requires a building permit in Agoura Hills?
A building permit is the city’s authorization to start construction, alteration, demolition or repair of a building or structure, and the Building and Safety Division inspects all permits for new construction, additions and remodels, tenant improvements and electrical, mechanical and plumbing work. The work that does not need a permit is set out in Ordinance No. 19-445, which amended Section 8103 of the Agoura Hills Municipal Code; that code also says an exemption never authorizes work that breaks the code or other laws.
Permits priced in the fee schedule
- New buildings, additions and remodels, valued from the ICC table
- Re-roofs, door and window replacements, patio covers and trellises
- Pools and spas, block walls and retaining walls
- Kitchen and bathroom remodels, demolition and foundation bolting
- Solar, battery storage, generators and EV chargers
- Panels, wiring, HVAC, water heaters, gas piping and sewer work
Over-the-counter review (30 minutes or less)
- Residential patio covers
- Residential sheds and storage structures
- Small residential remodels
- Standard pools and spas
- Commercial signs, fence walls and small retaining walls
Work started before a permit is issued triggers a special investigation and an investigation fee equal to the permit fee, with a $743 minimum under the current fee schedule.
What Agoura Hills decides and what the state holds
The city enforces the Title 24 codes with city amendments, adopts the 2026 Los Angeles County Fire Code and the 2024 International Property Maintenance Code, and adopted its own electric vehicle charging station amendments in Ordinance No. 17-431, effective September 12, 2017. It sets permit time limits, construction-noise conditions and fees, runs zoning, oak tree and design review, and requires every contractor working in the city to hold a city business license. Contractor licensing itself is a state matter.
Agoura Hills building department: who handles permitting
The Building and Safety Division takes in applications, routes plans to other divisions and outside agencies, reviews project valuations, issues permits and performs inspections; Planning and Zoning sits in the same Community Development Department. Agoura Hills runs its own building department; Los Angeles County Public Works handles unincorporated land nearby, and the Los Angeles County Fire Department reviews fire items under the county fire code the city adopts.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building and Safety Division, City Hall, 30001 Ladyface Court, Agoura Hills, CA 91301 |
| Building Official | Lukas Quach |
| Phone | 818-597-7334 (City Hall main line 818-597-7300; Planning 818-597-7339) |
| Counter hours | Monday to Thursday 7 a.m. to 5 p.m.; Friday 7 a.m. to 4 p.m. |
| Cashier hours | Monday to Thursday 7 a.m. to 4:30 p.m.; Friday 7 a.m. to 3:30 p.m. |
| Plan check appointments | Tuesday and Thursday 8 to 10 a.m.; Monday and Wednesday 1:30 to 3:30 p.m. |
| Portal | MGO Connect for building and planning permits |
| Permits@AgouraHillsCity.gov; solar: SolarPermits@AgouraHillsCity.gov; records: Records@AgouraHillsCity.gov |
Agoura Hills permit types
Online applicants set up a one-time MGO Connect profile and choose the application type that matches the work. Smaller jobs that take no more than 30 minutes to review can be checked over the counter at City Hall; larger ones go into full plan review, and most need plans by a California licensed architect or engineer, with structural calculations, a soils report and a Title 24 energy report where they apply.
Residential permits
- New houses and additions are valued from the most recent ICC building valuation data with a regional cost adjustment; remodels are valued at 33% of the new-construction figure.
- Standard-plan work has flat fees: a pool or spa built to an approved standard plan is $652 for plan check and $624 for the permit, a patio cover or trellis to a standard plan is $699, and a kitchen-only or bathroom-only remodel with no wall changes using the city handout is $699.
- Accessory dwelling units can use the city’s free pre-approved studio, one-bedroom and two-bedroom plans, each in three styles. A pre-approved plan generally avoids plan check and its fees, but still needs a pre-approved ADU permit and any grading, drainage, utility or fire sprinkler review.
- Solar can go through SolarAPP+ for pre-approved systems ($207 for the first 15 kW).
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial work, tenant improvements and change of use go through full plan review. Where disabled accessibility review applies, it adds 15% of the building permit fee to the 95% building plan check, and a final inspection on a new structure or change of use leads to a certificate of occupancy. Food facilities need Los Angeles County Health approval, equipment that emits air contaminants needs an AQMD permit, and trenches 5 feet deep or more and structures over three stories need a Cal/OSHA permit before the building permit is issued.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Planning: zoning clearance ($336) or site plan and architectural review (Zoning Administrator review $5,407); the Planning Division offers “talk to a planner” help and design guidelines.
- Oak trees: work near protected oaks needs an oak tree permit; administrative review for a single-family home is $745.
- Agency clearances: the city’s Agency Referral List shows which outside agencies must sign off; Building and Safety cannot issue the permit until they have.
- Preliminary review: a conceptual plan review or code interpretation before you apply is $475.
Agoura Hills building permit fees
The City Council adopted a new master fee schedule after a comprehensive fee study; the fees took effect on August 26, 2026. The building permit fee comes from the valuation table below. Building plan check is 95% of the building permit fee, disabled accessibility review 15%, and mechanical, electrical and plumbing permits 10%, 15% and 10% of the building permit fee. Every permit also carries a 7% technology fee, a General Plan fee of 1.19% of valuation and the state SB 1473 fee of $1 per $25,000.
| Valuation | Building permit fee |
|---|---|
| Up to $25,000 | $379 plus $28.25 per $1,000 over $5,000 |
| $25,001 to $100,000 | $944 plus $21.60 per $1,000 over $25,000 |
| $100,001 to $500,000 | $2,564.28 plus $11.64 per $1,000 over $100,000 |
| $500,001 to $1,000,000 | $7,222.71 plus $9.45 per $1,000 over $500,000 |
| $1,000,001 to $5,000,000 | $11,948.30 plus $5.64 per $1,000 over $1,000,000 |
| $5,000,001 to $25,000,000 | $34,501.64 plus $2.99 per $1,000 over $5,000,000 |
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Minimum permit fee | $97 |
| Re-roof | $346 for the first 1,000 sq ft, $139 per added 1,000 |
| Door or window replacement in the same opening | $31 each |
| Residential solar, first 15 kW | $258 plan review plus $155 permit |
| Residential EV charger / water heater | $103 / $103 |
| Electrical panel, new or upgraded | $253 |
| Replacement AC condenser or air handler, same size and place | $207 |
| Residential demolition | $448 |
| Permit extension / reinstatement | $127 / 50% of permit fee ($325 minimum) |
| Reinspection after the second failed inspection | $186 an hour |
| Temporary certificate of occupancy | $596 |
Worked example: an addition valued at $100,000 has a building permit fee of $944 plus 75 × $21.60 = $2,564.00. Plan check at 95% adds $2,435.80, the 7% technology fee $179.48, the 1.19% General Plan fee $1,190 and SB 1473 $4, for $6,373.28 before trade, accessibility and state seismic fees.
Trade permits and who may pull them in Agoura Hills
Electrical, mechanical and plumbing work tied to a building permit is charged as a percentage of the building permit fee; stand-alone jobs use the itemized trade fees, such as $253 for a new or upgraded panel, $160 for a furnace or heat pump, $207 for a water re-pipe per dwelling and $290 for a residential backup generator. Electric vehicle chargers follow the AHGreen guidelines: a single-family submittal and plan review sheet, an eligibility checklist for the expedited commercial process with over-the-counter plan check, and a policy for multi-family charging stations. Solar applications and plans can be emailed to the solar permit address for faster review.
Every contractor working in the city, with or without an office there, needs an Agoura Hills business license; contractors are Category A, at $155 for a new license and $107 to renew, including the $4 state fee. Homeowners may pull permits as owner-builders, but the city recommends hiring a California licensed contractor and explains the risks of acting as worker, contractor or employer, including payroll and workers’ compensation duties when paying unlicensed help for work over $500.
Rather not deal with the building department?
Get a free quote →How to apply for an Agoura Hills building permit
Confirm zoning, oak trees and design review needs, and get any zoning clearance or architectural approval first.
Use the Agency Referral List to contact Fire, Health, AQMD, Cal/OSHA or others that must sign off.
Have plans prepared by a qualified person (usually a California licensed architect or engineer) with calculations, soils and energy reports as needed.
Set up a profile, choose the right application type and upload the plans, or book an over-the-counter plan check appointment for small jobs.
Respond to plan check comments, then pay the permit fee in full; no permit is issued or inspection done before payment.
Schedule inspections from your MGO Connect dashboard and keep the permit and approved plans on site.
Review, corrections and what causes delay
Incomplete, inaccurate or non-compliant plans delay permits and add review fees: rechecks after the third review are $260 an hour. Under AHMC Section 8103, an application is treated as abandoned 180 days after filing unless pursued in good faith, with extensions of up to 90 days; the city’s 2025 code FAQ instead says plan check applications expire 12 months after the first submittal. Once issued, a permit lapses if work does not start within 180 days or stops for 180 days under the code text on the permits page, while the 2025 FAQ gives one year; ask the division which limit it applies to your permit.
Agoura Hills building inspections
Schedule inspections on your MGO Connect dashboard; for older permits, call 818-597-7334. Inspections run from 8 a.m. to 12:30 p.m., Monday to Friday, and you can call at 7:30 a.m. on the day of the inspection for a two-hour window. Before the visit, finish the work, correct earlier items, post the address so it is visible from the street, give access details, keep the latest approved plans and permit documents on site, complete all earlier inspections before asking for the final, and have someone who knows the project present.
A reinspection fee can be charged when work is not ready, the permit card or approved plans are missing, access is not provided, or the work departs from the plans; no further inspection is done until it is paid. The building official may also suspend or revoke a permit for construction noise between 7 p.m. and 7 a.m., Monday through Saturday and on federal holidays, or for dust above permitted levels. New structures and changes of use receive a certificate of occupancy after the final inspection.
California building code in Agoura Hills
From January 1, 2026 the city enforces the 2025 California Building Standards Code with city amendments, the 2026 Los Angeles County Fire Code, the 2024 International Property Maintenance Code and the city’s municipal code. Projects submitted for plan check before that date stay under the 2022 code; existing approved stock plans stay valid for 10 years under the city’s reading of AB 130. FEMA’s Community Status Book lists the City of Agoura Hills (community 065072) as participating in the National Flood Insurance Program, with flood maps effective April 4, 2018.
Want this handled start to finish?
Get a free quote →California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Agoura Hills permit search and official resources
Records requests for permits and plans go to Records@AgouraHillsCity.gov. Copies of archived plans requested outside the public records process cost $101 per building under the fee schedule. Applicants can follow their own permits on the MGO Connect dashboard.
- Building and Safety Division
- Building permits
- MGO Connect permit portal
- Plan review
- Inspections
- Master fee schedule page
- Master fee schedule, effective August 26, 2026
- Building valuation data
- Codes in effect, 2025
- FAQs on the 2025 code adoption
- ADUs and pre-approved plans
- AHGreen: solar and EV charging
- Business license
- Planning and Zoning
- FEMA Community Status Book, California
Inspections are where schedules slip.
Get a free quote →Agoura Hills building permit FAQs
How much is a building permit in Agoura Hills?
It depends on valuation: $944 plus $21.60 per $1,000 over $25,000 up to $100,000, then plan check at 95%, a 7% technology fee and a 1.19% General Plan fee.
Can I apply online?
Yes, through MGO Connect; small jobs can also be reviewed over the counter by appointment.
How do I schedule an inspection?
From the MGO Connect dashboard; inspections are 8 a.m. to 12:30 p.m., and calling 818-597-7334 at 7:30 a.m. that day gets a two-hour window.
Do contractors need a city business license?
Yes. Every contractor working in the city needs one: $155 new and $107 to renew.
Can I be my own contractor?
Yes, as an owner-builder, though the city recommends a licensed contractor and warns of employer and workers’ compensation duties.
What does a re-roof permit cost?
$346 for the first 1,000 square feet and $139 for each added 1,000, plus the technology fee.
Are there pre-approved ADU plans?
Yes. Free studio, one-bedroom and two-bedroom plans that generally skip plan check, though the ADU still needs a permit and other reviews.
Simplify Agoura Hills permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Agoura Hills sooner?
Let Alliance prepare, file, and track your Agoura Hills permits while your crew stays on the job.
More California permitting guides
Los Angeles County
Read guide →Artesia
Read guide →Azusa
Read guide →Alameda Building Permit Guide
Read guide →Alameda County Building Permit Guide
Read guide →Albany Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Agoura Hills permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.