Adelanto, California Building Permit Guide

To get a building permit in Adelanto, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Adelanto’s Building & Safety Division issues building, electrical, plumbing and mechanical permits inside city limits from City Hall on Air Expressway, with applications, plans and fees handled online through the city’s Camino portal.

Authority: City of Adelanto Building & SafetyOffice: 11600 Air ExpresswayPhone: 760-246-2300
Counter hours
Mon–Thu, 7 a.m.–6 p.m.City Hall is closed Fridays
Inspections
Ext. 2362Book by 5 p.m. the day before; none on Fridays
Plan check
70% of permit feeNew houses; covers two resubmittals
Snow load
16 psf groundWind 110 mph, Exposure C (residential)

In Adelanto, the city’s Building & Safety Division issues every building permit inside city limits, from re-roofs and block walls to tract homes, warehouses and cannabis facilities. Applications, plans and fee payments go through the city’s online Camino portal, and the counter at City Hall, 11600 Air Expressway, is open Monday to Thursday from 7:00 a.m. to 6:00 p.m. A new house pays plan check at 70% of a square-footage building permit fee, and impact fees for a single-family home add up to about $15,800 before water and sewer connections.

What requires a building permit in Adelanto?

The city requires a permit for any construction improvement, repair, alteration or demolition, and its Building & Safety page spells out that this includes pools and spas, sandblasting, most excavation work and temporary structures such as temporary power poles. Applications must be in before work starts. The division’s “Situations Requiring a Permit” handout lists the common home projects.

Permit required

  • Room additions, garages, carports, gazebos, guest houses, patio covers and patio enclosures
  • Decks more than 30 inches above surrounding grade, and decks with a roof cover of any size
  • Block walls more than 3 feet above grade, and fences
  • Re-roofing of more than 25% of a roof
  • Garage conversions, which also require a new two-car garage
  • Storage sheds over 120 square feet and metal storage containers (planning rules apply)
  • Pools and spas 18 inches deep or deeper
  • Mobile home set-downs, demolition (interior or exterior), septic tank replacement
  • Sewer hook-ups, which must include removal or demolition of the septic system
  • New or altered electrical, plumbing and mechanical work, including HVAC units, service upgrades and water heater replacement

No permit

  • On-site flat concrete work such as sidewalks and driveways; foundations with floor slabs still need a permit

A cannabis business needs a building permit to verify its occupancy even when no construction is planned.

What the city decides and what the state holds

Adelanto sets its own design criteria for local conditions: a 16 pound per square foot ground snow load, 110 mph Exposure C wind design for houses and solar, site-specific seismic values on Site Class D and climate zone 14. It also sets its fees, impact fees and zoning, and it applies the San Bernardino County Fire Department’s amendments to the Fire Code. The building standards and contractor licenses come from the state.

Adelanto building department: who handles permitting

The City of Adelanto Building & Safety Division, part of Community Development Services, issues building, electrical, mechanical and plumbing permits for all property inside city limits; land outside the city falls to San Bernardino County. A Plan Checker reviews each set and either approves it or returns a correction list, and the Building Official issues the certificate of occupancy once every department has signed off. Fire sprinkler, fire alarm and hood suppression plans are reviewed by San Bernardino County Fire, not by the city.

Short on time to read all of this?

Get a free quote →
Adelanto permit contacts
DetailInformation
Building & SafetyCity Hall, 11600 Air Expressway, Adelanto, CA 92301; 760-246-2300 ext. 11182 (the 2025 code bulletin lists ext. 11181); buildingandsafety@adelantoca.gov; fax 442-249-1181
Inspection request line760-246-2300 ext. 2362; inspections 8:00 a.m. to 4:00 p.m., Monday to Thursday
Online portalCamino permit portal (applications, plans and fee payment)
Planning760-246-2300 ext. 11180; planning@adelantoca.gov; Monday to Thursday, 7:00 a.m. to 6:00 p.m.
Fire plan reviewSan Bernardino County Fire, through the county’s EZOP online system
Business licensesHdL processing center for the city, 8839 N. Cedar Ave #212, Fresno, CA 93720; 760-298-5461; adelanto@hdlgov.com

Planning reviews every new development or change to an existing building against the Development Code and General Plan before construction starts.

Adelanto permit types

Only the property owner, a licensed contractor or an authorized agent may obtain a permit. The application must say who will do the work, where the project is and what it covers. The document center supplies the building application, permittee authorization forms for contractors and owners, a special inspector registration form and standard handouts for block walls, patio covers, pools and water heaters.

Residential permits

  • New houses and ADUs: full construction plans on 24 by 36 inch sheets, structural and Title 24 energy calculations where they apply, deferred submittals such as fire sprinklers, trusses and rooftop solar listed on the cover sheet, and a waste management plan for projects over 1,000 square feet. Plan review fees are paid when the plans are submitted.
  • Additions and remodels: the same plan set with a detailed scope of work, plus an Assessor’s copy of the floor plan, plot plan and scope.
  • Soils reports: required for every new house, but not for a room addition, ADU or non-habitable accessory structure where the foundation design meets the code’s Category 5 soil values and the site is not subject to liquefaction.
  • Rooftop solar: residential rooftop PV and storage systems under 38 kW can use SolarAPP+; ground-mounted and ballasted systems and buildings in a historic district cannot.

Commercial permits

All commercial buildings, and houses three stories or taller, must be designed by a licensed civil or structural engineer or architect. Commercial, industrial, tenant improvement and multi-family projects follow their own submittal list, and new commercial or industrial buildings and commercial additions need a soils report. Businesses also file a Mojave Desert Air Quality Management District clearance form for a building permit or certificate of occupancy (residential projects are exempt).

What comes before the building permit

  • Pre-consultation: the city strongly encourages a meeting with a site plan or concept sketch before any formal filing.
  • Planning: Planning is usually the first review and decides whether a proposal can be approved at staff level or must go to the Planning Commission and City Council; its applications include conditional use permits, tentative tract and parcel maps, temporary use permits, location and development plans, sign permits and home occupation permits.
  • ADUs: the city’s ADU handout starts with a call to a Planner and offers a complimentary preliminary review of the architectural plans before the permit application.
  • Fire: fire protection system plans go to San Bernardino County Fire through EZOP.

Not sure this scope needs a permit?

Get a free quote →

Adelanto building permit fees

Adelanto prices most permits from its Development Fee Schedule, linked from the Building & Safety page; the schedule prints no adoption date or resolution number. New buildings pay a square-footage building permit (inspection) fee by occupancy, and plan check is a percentage of that fee: 70% for single-family homes and 75% for multi-family, commercial, hotel and industrial buildings, covering the first review and two resubmittals. A third review or later costs $229 an hour, repeat-model homes pay 25% of the plan check fee, and expedited plan review costs 1.5 times the plan check fee. Fees for items the schedule does not list are taken from the County of San Bernardino’s Building & Safety fee schedule.

Selected Development Fee Schedule items
ItemFee
Single-family building permit, 1,000–3,000 sq ft$1,392.54 plus $237.59 per 500 sq ft over 1,000
Single-family building permit, 3,000–5,000 sq ft$2,342.91 plus $292.86 per 500 sq ft over 3,000
Residential addition, structure only, up to 500 sq ft$939, plus $102.79 per 100 sq ft over 500
Kitchen or bathroom remodel, MEP included, up to 500 sq ft$1,579, plus $102.79 per 100 sq ft over 500
Patio cover / pre-engineered or city standard patio cover$1,357 / $1,129
Block wall / other fencing$785 / $603
Residential re-roof / commercial re-roof$694 / $603 per 25 squares
Residential pool or spa / above-ground pool or spa$1,470 / $1,357
Residential solar, 15 kW or less$450, plus $15 per kW above 15
Residential EV charging station$809
Storage shed over 120 sq ft, no electrical or water$317
Re-inspection / miscellaneous plan review$182 an hour / $229 an hour
Manufactured home set-down$968
Surcharges and deposits
ItemFee
General Plan maintenance fee15% of the building permit fee
Technology fee7% of the permit fee
Strong motion (SMIP) fee$0.13 per $1,000 residential; $0.28 per $1,000 commercial
Building Standards Commission fee$1 per $25,000
Construction and demolition waste$155 processing fee, plus a deposit of $50 per 100 sq ft (minimum $1,000, maximum $100,000)

Rather talk it over?

Call 1-855-478-4290 →

Worked example: a new 2,000 square foot house pays a building permit fee of $1,392.54 plus two 500-square-foot increments at $237.59, or $1,867.72. Plan check at 70% adds $1,307.40 and the 15% General Plan maintenance fee adds $280.16, for $3,455.28 before the separate electrical, plumbing and mechanical fees, the technology fee, state surcharges, the waste deposit and impact fees.

Development impact and connection fees (as of October 23, 2026)
FeeSingle-family / multi-family / non-residential
Circulation$6,573.35 / $4,541.70 per unit / $24,977.86 per acre
Fire$346.98 / $239.19 per unit / $1,318.51 per acre
Park and recreation$4,267.07 per unit (single- and multi-family)
Drainage$4,624.38 / $2,312.19 per unit / $17,570.29 per acre
Water connection (APUA)$9,930.61 for a 1-inch or smaller meter; $31,694.67 for a 2-inch meter
Sewer connection (APUA)$3,675 per equivalent dwelling unit (20 fixture units, or 245 gallons a day)

The four impact fees for a single-family home total $15,811.78. Developers may ask to defer impact fees until the certificate of occupancy, and the fees are adjusted each year for inflation. School developer fees are paid to the Victor Valley Union High School District and the elementary district serving the site; the high school district accepts only a cashier’s check or the exact amount in cash and asks for 24 to 48 hours to prepare the paperwork.

Trade permits and who may pull them in Adelanto

Electrical, plumbing and mechanical permits are issued by Building & Safety under the same fee schedule. Each trade permit carries a $78 issuance fee, and new construction is charged by the square foot: on a new house, $0.10 for mechanical, $0.13 for electrical and $0.10 for plumbing, each capped at the building permit fee. Stand-alone items are priced individually, for example $194 for a water heater, furnace or sub-panel, $251 for an HVAC change-out and $479 for a new septic system.

Contractors list their state license on the permit, and a contractor doing business in the city also needs an Adelanto business license, which the city’s processor HdL takes by phone at 760-298-5461 and which is valid for one year. SolarAPP+ users must hold both. Owner-builders receive the city’s Property Owner’s Package and must initial each statement, sign and return the acknowledgment before the permit issues; an agent cannot sign it for the owner without the city’s prior approval. Cannabis facilities are the exception: no permits are issued to owner-builders, and all work must be done by licensed contractors.

Rather not deal with the building department?

Get a free quote →

How to apply for an Adelanto building permit

1. Check zoning and meet with staff

Look up the parcel on the city’s GIS map and bring a site plan or sketch to a pre-consultation with Planning and Building.

2. Clear Planning

Planning decides whether the project can be approved by staff or needs the Planning Commission and City Council.

3. Prepare the plan set

Use the residential or commercial submittal list, the city’s design loads and the 2025 codes; include soils, structural, energy and waste management documents.

4. Apply in Camino

Create a Camino account, submit the application and plans, and pay plan review fees at submittal.

5. Answer corrections and outside reviews

Respond to the Plan Checker’s list, file fire plans with San Bernardino County Fire through EZOP, and obtain school fee and air district clearances.

6. Pay and receive the permit

Once every department signs off, the permit technician issues the permit when the remaining fees are paid.

7. Inspect and finalize

Book each inspection on ext. 2362 and keep the stamped plans on site until the final.

Review, corrections and what causes delay

Every submittal is checked for completeness on arrival, and incomplete submittals are voided at the counter. Plans filed on or after January 1, 2026 must meet the 2025 California codes and the city’s amendments; tract and stock plans approved under the 2022 codes expire without renewal one year after their stock plan issuance date and must be redesigned, with new plan review fees, before they can be used again.

Adelanto building inspections

The permit holder, owner or licensed contractor schedules inspections once the permit is issued. Call the inspection request line, 760-246-2300 ext. 2362, before 5:00 p.m. the day before; you may ask for a morning or afternoon visit, but the slot is not guaranteed. Inspections run from 8:00 a.m. to 4:00 p.m., and none are available on Fridays. Work may not go beyond each inspection point until it is approved, anything that fails must be re-inspected before it is covered, and a copy of the stamped plans must be on site when required. Re-inspections are billed at $182 an hour, and inspections outside business hours at $244 an hour with a four-hour minimum. SolarAPP+ systems over 15 kW may need a separate roof mount inspection before panels go on.

After the final, the permit technician routes a sign-off sheet to the other departments, and the Building Official then issues the certificate of occupancy. A temporary certificate of occupancy costs $520.

California building code in Adelanto

Adelanto applies the 2025 California codes, the San Bernardino County Fire Department amendments to the Fire Code, the 2024 International Property Maintenance Code, the 1997 Uniform Code for the Abatement of Dangerous Buildings and its own municipal code. FEMA’s Community Status Book lists the City of Adelanto (community 060639) as participating in the National Flood Insurance Program, with flood maps effective September 2, 2016.

Want this handled start to finish?

Get a free quote →

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Adelanto building permit FAQs

Can I apply for an Adelanto permit online?

Yes. Applications, plans and fee payments now go through the city’s Camino portal.

Do I need a permit for a block wall or fence in Adelanto?

Yes. Block walls over 3 feet above grade and fences are on the city’s permit list; a block wall permit is $785 and other fencing $603.

Does a shed need a permit?

Storage sheds over 120 square feet do; a shed with no electrical or water service costs $317.

Are inspections available on Fridays?

No. Inspections run Monday to Thursday from 8:00 a.m. to 4:00 p.m., booked by 5:00 p.m. the day before on ext. 2362.

How much is plan check on a new house?

70% of the building permit fee, covering the first review and two resubmittals; further reviews cost $229 an hour.

Can an owner-builder get a permit?

Yes, after signing and returning the city’s owner-builder acknowledgment, except for cannabis facilities, which must use licensed contractors.

Adelanto permit search and official resources

Plans go in, and fee invoice links come back, through the applicant’s Camino account. For an older permit or certificate of occupancy, email Building & Safety with the address and parcel number.

Inspections are where schedules slip.

Get a free quote →

Simplify Adelanto permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Adelanto sooner?

Let Alliance prepare, file, and track your Adelanto permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Adelanto permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.