Chino is an Inland Empire city of about 97,000 residents in the south-west corner of San Bernardino County, transitioning from a dairy and agricultural preserve into large planned residential and logistics districts. Its Building Division, within Development Services on Central Avenue, is the sole building authority inside the city.
This guide covers the Building Division, its permit process, the codes and amendments in force, and the specific plan and growth issues that shape Chino projects.
This guide covers work inside the City of Chino limits. Unincorporated San Bernardino County and the neighbouring City of Chino Hills are separate authorities.
Chino and Chino Hills are two different cities with two different building departments. Work inside the City of Chino files with the Building Division on Central Avenue; Chino Hills has its own department at its own civic centre. Chino has adopted the 2025 edition of the California Building Code with amendments listed in Chapter 15 of the Chino Municipal Code.
What requires a building permit in Chino?
Permit required
- New commercial, multi-family and residential construction, additions and change of occupancy
- Structural alterations, load-bearing changes, foundations, decks and retaining walls
- Electrical work — services, panels, circuits, solar and EV charging — under the California Electrical Code
- Plumbing under the California Plumbing Code
- Mechanical and HVAC change-outs, and work affecting the Title 24 energy envelope
- Re-roofing above the exempt scope, pools, signs, and demolition
Often exempt
- Minor repairs and maintenance replacing materials in kind
- Small accessory structures below the local threshold, where zoning allows
- Painting, flooring, cabinetry and other finish work
- Like-for-like fixture or appliance swaps with no alteration to wiring or piping
Local amendments and thresholds differ from one jurisdiction to the next, so an exempt list from a neighbouring city is not reliable — a project waved through in one place needs a full permit set in the next. An exemption from a building permit is never an exemption from zoning, the statewide energy or green-building codes, or an electrical or plumbing permit. Confirm scope with Building Division before work starts.
Short on time to read all of this?
Get a free quote →The statewide layers that apply everywhere
Several parts of Title 24 apply on top of the base building code and routinely catch projects owners assume are exempt: the California Energy Code (Part 6); CALGreen (Part 11), California’s mandatory statewide green-building code; and the accessibility provisions in Chapters 11A and 11B. Seismic design is built into the code statewide, and in fire-prone areas the California Wildland-Urban Interface Code (Title 24, Part 7, in force since 1 January 2026) and Cal Fire defensible-space requirements (Public Resources Code 4291) add a further layer. In the City of Chino, the Building Division administers the 2025 California Building Code with the amendments adopted into Chapter 15 of the Chino Municipal Code.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Who handles permitting in Chino?
The Building Division issues building permits and takes in plans for review, and its inspectors field verify compliance with the codes and ordinances on residential and commercial structures.
| Detail | Information |
|---|---|
| Authority | City of Chino Building Division |
| Serves | The City of Chino limits |
| Phone | 909-334-3251 |
| Counter | 13220 Central Avenue, Chino |
| Code | 2025 California Building Code with Chapter 15 amendments |
| Inspections | Requested before the posted afternoon cut-off |
| Licensing | State CSLB license; a city business licence or tax registration may also apply |
| Records | The division holds city permit records |
The Building Division promotes and ensures that development in Chino is constructed to the safety standards established by the California Building Codes, and works alongside Planning, Code Enforcement, Housing and Accessibility inside Development Services. Grading permits and inspections are handled in the same department. Building valuation data and fee calculation tables are available at the Building Division counter, and a permit technician will help apply them.
Confirm the parcel is inside the city first; unincorporated San Bernardino County and the City of Chino Hills file with different authorities under their own amendments.
In 2025, building permits issued in Chino authorized 214 new privately owned housing units, 156 of them single-family homes, according to the U.S. Census Bureau Building Permits Survey.
Not sure this scope needs a permit?
Get a free quote →Permit types
Residential permits
Residential work inside the city is permitted and inspected by the division under the 2025 code and Chapter 15 amendments. There are very few areas of new construction or repair that do not require permits; the codes state that all work requires a permit and then list the exceptions. Additions, ADUs, patio covers, walls, reroofs, pools, solar and EV chargers all need permits.
Commercial permits
Commercial, industrial and multi-family work goes through division plan review against the California Building Code, the Energy Code and CALGreen, with Chapter 15 amendments. It requires CSLB-licensed contractors and drawings stamped by a California-licensed architect or engineer, with school fees and specific plan standards confirmed before submittal.
Licenses, trade classifications and design professionals
Practically, three credential layers appear on California projects: a CSLB license in the correct classification for the contractor pulling the permit; the specialty C-classifications for the electrical, plumbing and mechanical trades; and, on commercial and larger residential work, drawings stamped by a California-licensed architect or engineer. Confirm what Building Division requires for the specific building before filing.
Contractors are licensed statewide by the Contractors State License Board (Classes A, B, B-2 and C) for work of $1,000 or more or any permitted work; a city may also require a business licence or tax registration. Contractor licensing in California
Chino permit costs and fees
Budget the city building permit and plan-review fees, separate trade permits, the state Building Standards and seismic surcharges, school district fees and any development impact fees. Valuation data and fee tables are available at the counter; confirm the schedule in force on your filing date.
| Fee component | How it works |
|---|---|
| Building permit | Based on project valuation or square footage; set by the local schedule |
| Plan check | A percentage of the permit fee or a flat charge, at submittal |
| Trade permits | Separate electrical, plumbing and mechanical fees |
| State surcharges | Building Standards and seismic (SMIP) fees collected with the permit |
| Impact and school fees | Development impact and school-district fees in growth areas |
| Re-inspections and revisions | Additional fees for failed inspections, revisions and expired permits |
Rather talk it over?
Call 1-855-478-4290 →California layers two uniform state surcharges — the Building Standards Administration fee and the Strong Motion Instrumentation seismic fee — on top of the local charges (Health and Safety Code 18931.6; Public Resources Code 2705). The building and plan-check fees themselves are local and change, and California law limits them to the reasonable cost of providing the service, so a figure from a neighbouring city is not reliable — ask Building Division for the schedule in force on your filing date.
Need a real number for a specific Chino project? Send us the scope, address and valuation and we will identify the authority having jurisdiction, the code edition in force and the fee categories that will apply.
Trade permits and who may pull them
Permit required
- Service installations, panel upgrades, new circuits, solar PV and EV chargers
- New plumbing, repipes, water heater change-outs, fixtures, backflow and gas piping
- HVAC installation and change-out, ductwork, venting and commercial kitchen exhaust
- Sprinkler, standpipe and fire alarm work on commercial and multi-family structures
Typically exempt
- Replacing a fixture, switch, receptacle or light with no alteration to wiring or piping
- Clearing a stoppage without replacing or rearranging concealed piping
- Filter, thermostat and routine component service
- Like-for-like appliance repair that does not alter the connection
Each trade follows its part of Title 24 and is done by a contractor with the matching CSLB licence (C-10 electrical, C-36 plumbing, C-20 HVAC), a Class B contractor where allowed, or an owner-builder. Trade licences in California
Rather not deal with the building department?
Get a free quote →How to apply for a Chino building permit
Chino Hills is a separate city with its own building department.
The 2025 code applies with Chapter 15 municipal code amendments.
California licenses contractors statewide; match the classification to the scope.
Building valuation data and fee tables are available at the counter.
Both are settled ahead of the building permit on larger projects.
Requests before the afternoon cut-off get next-day service.
Review, corrections and what actually causes delay
In California, the first cause of delay is uncertainty over jurisdiction — filing with the county when a city should have it, or missing a local amendment on top of Title 24. After that come Title 24 energy and CALGreen documentation, a CSLB classification that does not match the scope, and, in fire or coastal areas, defensible-space or coastal-zone requirements that were not addressed up front. Build the plan-check time into the schedule and confirm the checklist with Building Division before filing.
A building permit carries a validity period and can expire if work does not start or stalls between inspections; confirm the expiry with Chino on phased or delayed work. Permit validity in California
Inspections in Chino
Where a permit is required, standard checkpoints include footing and foundation, framing, rough-in electrical, plumbing and mechanical, insulation and Title 24 energy, CALGreen measures, fire systems on commercial work, and final, with a certificate of occupancy before use. Inspection requests are made through the city request form or by phone before the posted afternoon cut-off for next-day service.
California inspections are made against the code editions in effect when the permit application was submitted (Health and Safety Code 18938.5), so the approved plans and any energy and green-building documentation need to be on site for the inspector to check against. Confirm the notice Building Division needs and schedule around its inspection windows.
Want this handled start to finish?
Get a free quote →Do not cover work before the required inspection has been approved. Keep the issued permit, the approved plans, product listings, Title 24 energy documentation and your correction responses available on site.
Chino permit search and official resources
Permit records in California sit with the local authority that issued them. Where the City of Chino Building Division is the authority for the City of Chino limits, it holds the building permit, the inspection history and the certificate of occupancy. If you are buying, refinancing or renovating, confirm that past work was permitted rather than assuming it was — and confirm the code edition that was in force.
Confirm the authority having jurisdiction and the local amendments first. California enforces one statewide code, Title 24, but each city and county adds its own amendments and fee schedule, so the requirements that apply vary by parcel. Confirm current requirements, fees and review turnaround for your filing date.
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
- City of Chino Building Division
- California Building Standards Commission (Title 24)
- Contractors State License Board (CSLB)
- California Energy Commission (Energy Code)
- California Department of Housing and Community Development
Frequently asked questions
Who issues building permits in the City of Chino?
The Building Division, within Development Services on Central Avenue. Chino Hills is a separate city with its own building department, and unincorporated San Bernardino County is separate again.
Inspections are where schedules slip.
Get a free quote →Which code edition applies?
The city has adopted the 2025 edition of the California Building Code, with the specific adoption and amendments listed in Chapter 15 of the Chino Municipal Code.
Does my project need a permit?
Almost certainly. The codes specify that all work requires permits and then list exceptions; the division advises calling to confirm before starting.
Do I need a local contractor registration?
Not a contractor licence: California licenses contractors statewide through the CSLB, and the licence must be active and carry the classification that matches the work. A city may still require a business licence or business tax registration (Government Code 37101), so ask the department.
How do I estimate fees?
Building valuation data and permit fee calculation tables, along with plumbing, mechanical and electrical fee tables, are available at the Building Division counter.
How do I run a Chino permit search?
The division holds the city’s permit and inspection records; confirm past work was permitted before buying, refinancing or renovating.
Simplify Chino permitting with Alliance Permitting
Chino rewards getting the city right before anything else. Chino and Chino Hills are routinely confused, and a filing at the wrong counter costs a full cycle.
Trusted by leading builders, developers, and national contractors — 21+ years of filing in the jurisdictions we write about.
Contractors and builders choose Alliance for Chino because the work is done by people who have stood at the counter:
- We confirm the parcel is in Chino rather than Chino Hills.
- We confirm the code edition and Chapter 15 amendments.
- We estimate fees from the city valuation tables before pricing.
- We confirm the CSLB classification matches the scope of work.
- We book inspections inside the posted daily cut-off.
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Chino sooner?
Let Alliance prepare, file, and track your Chino permits while your crew stays on the job.
More California permitting guides
This guide is provided by Alliance Permitting for general information about Chino permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.