In Leeds, building, electrical, plumbing and mechanical permits come from the City’s Development Services Department, 1404 9th Street (205-699-0907), and applications are filed online in the Citizenserve portal. The City code sets permit fees at 0.9% of the job’s valuation. Trade and re-roofing permits are processed in 24 to 48 hours once the application is complete, and other permits in up to 7 to 10 days.
What requires a building permit in Leeds?
The City applies the permit rule of the 2015 International Building and Residential Codes. An owner, or the owner’s authorized agent, must apply to the Building Official and get a permit before doing any of the following:
Building work
- Constructing, enlarging or altering a building or structure
- Repairing, moving or demolishing one
- Changing a building’s occupancy
- Re-roofing
- Setting up a mobile or manufactured home
- Building a swimming pool
Systems and site
- Installing, altering, repairing or replacing an electrical system
- The same for a mechanical or plumbing system
- Gas piping
- Land disturbing activity, which has its own permit application
- Signs
- Excavation in a street or right-of-way
A Certificate of Occupancy is issued for new construction and for a change of use only.
Who issues permits in Leeds?
Development Services permits and inspects new construction, additions, alterations, repairs and remodeling throughout what the City calls its building permitting jurisdiction, and it enforces the City’s Flood Damage Prevention Ordinance. Leeds lies in three counties, Jefferson, St. Clair and Shelby, which is why the City’s checklist sends applicants to each county’s GIS site for deeds and to each county’s onsite sewage office for septic approval.
| Contact | Details |
|---|---|
| Office | Development Services, 1404 9th Street, Leeds, AL 35094 |
| Hours | Monday through Thursday, 7 a.m. to 4:30 p.m. |
| Building Inspections Superintendent | Jody Courson, 205-699-0907 |
| Apply and book inspections | Citizenserve portal |
| Pay in person | Check or cash at City Hall, 1400 9th Street |
| Boards | Board of Zoning Adjustments and Historic Preservation Commission meet at the City of Leeds Annex, 1412 9th Street |
Short on time to read all of this?
Get a free quote →Leeds permit types and online filing
Everything is filed in Citizenserve. The portal takes construction plans and supporting documents, shows the review status, accepts card payments and books inspections, and the City says it works best in the Chrome browser. Issued permits and stamped plans are downloaded from the Documents tab rather than collected from the office.
- Building permits for residential and non-residential work. Each permit carries only its own valuation, so the building permit for a new house leaves out the electrical, mechanical and plumbing work.
- Electrical, mechanical, plumbing and gas permits, applied for separately by each trade.
- Authorized Agent Form, submitted with the application when an owner names someone to handle permitting for them.
- Commercial Checklist, which must be completed and returned with every commercial application.
- Application for Driveway Access Permit, for a driveway onto a city street, taken to City Hall.
- Permit to Develop in a Special Flood Hazard Area, a form the Building Department supplies for the contractor or owner to sign before a flood-zone permit is issued.
Permit fees in Leeds
Section 10-5 of the City code, amended by Ordinance 2024-04-01 on April 15, 2024, says permit fees for new buildings, remodels, demolition, and electrical, plumbing and mechanical installations are 0.9% of the valuation, counting labor, materials and equipment only. The fee schedule linked from the Development Services page is still the 2023 edition, which shows 1% for building permits and 2% for trade permits; the 2024 ordinance is the later adopted document.
Not sure this scope needs a permit?
Get a free quote →| Charge | Amount | Where it is set |
|---|---|---|
| Building, demolition, electrical, plumbing and mechanical permits | 0.9% of valuation | City Code Sec. 10-5 (April 15, 2024) |
| Technology fee, on all permits | $11.82 | 2023 fee schedule |
| Minimum permit fee | $35.46 | 2023 fee schedule |
| Work done without a building permit | Double fee | 2023 fee schedule |
| Modular permit, commercial | $236.38 | 2023 fee schedule |
| Re-inspection, per permit | $27.10 for the first; $54.20 for the second and each one after | 2023 fee schedule |
| Land disturbing activity permit application | $118.19 for a single-family residence; $472.77 for other work | 2023 fee schedule |
| Sign permit application deposit | $29.55 | 2023 fee schedule |
| Excavation permit | $35.46 | 2023 fee schedule |
For example, a building permit for work valued at $250,000 is $2,250 at 0.9%, before the technology fee. Non-residential permits also carry the state craft training fee. The City’s FAQ page quotes a $45 re-inspection fee when a job is not ready for the inspector, which differs from the 2023 schedule, so allow for either figure.
Fees are paid after the application has been reviewed and approved, by card in the portal or by check or cash at City Hall. Work must not start until the permit status reads “Issued” or “Issued by Email”.
Electrical, plumbing, mechanical and gas permits
Each trade applies for its own permit in the portal, and the City turns complete trade applications round in 24 to 48 hours. The trade permits must all be on file before the combined rough-in inspection is requested. Leeds enforces the 2014 National Electrical Code and the 2015 International Mechanical, Plumbing and Fuel Gas Codes.
Contractors need a City business licence as well as their state licence: the 2023 schedule lists the annual licence at $590.96 for a contractor and $177.29 for a subcontractor. Under Section 10-2 of the code, the City will not issue a certificate of occupancy, or a release letter to a power, gas, water or telephone company, until every general contractor and subcontractor on the job has paid those licence fees.
Rather talk it over?
Call 1-855-478-4290 →Required plans and supporting documents
Every building permit
- Owner and contractor contact details
- A detailed scope of work: what will be done, by what methods, with what materials
- Job valuation for that permit
- Address Verification Letter for new construction
- Proof of ownership and the parcel number, from a tax bill or recorded deed
- Construction plans drawn to scale, as PDF
- Site plan or survey with the footprint of existing and proposed structures and distances to property lines
- Driveway confirmation from ALDOT, the county or the City, depending on the road
- Sewer release or county health department release, and a water release
Commercial projects add
- The Commercial Checklist, attached to each plan set
- Plans ready for construction, not marked preliminary
- Sheets sealed, signed and dated by the architect or engineer where the state boards require it
- Code analysis, and a soil report for new buildings and additions
- Energy code compliance software output
- An ADEM letter where 1 acre or more is disturbed, or a stormwater permit for smaller sites
- Electrical one-line diagram, load analysis and panel schedule; plumbing riser diagram
- Storm drainage and civil plans, and fire alarm plans where required
For a site in a flood zone the City also wants a temporary benchmark or an Elevation Certificate from an Alabama registered surveyor, the signed flood permit form, and a finished-construction Elevation Certificate before the final inspection. A floodway site needs a No-Rise Certificate.
How to apply for a Leeds building permit: 6 steps
The City’s zoning map is online. Variances from the Zoning Ordinance go to the Board of Zoning Adjustments, and Development Services staff handle the applications.
Get the address verification letter, the driveway confirmation, and the sewer or septic and water releases for the property.
Create the application, enter the scope and valuation, and upload the plans and documents.
All status messages are sent by email, including requests for more information and the notice that the permit is “Approved/Payment Required”.
Pay in the portal under My Account, View My Requests, or at City Hall; then download the permit and stamped plans.
Ask at least one day ahead, with every trade permit already on file.
Rather not deal with the building department?
Get a free quote →Inspections, final approval and occupancy
All inspections are requested through the portal. Same-day requests are not accepted; a request can be made up to midnight the night before, and the City does not guarantee a morning or afternoon slot. Results arrive by email when the inspector has finished.
A new building normally goes through a footing inspection, an open-trench plumbing inspection, a slab inspection, the 4-way inspection (framing, mechanical, electrical, plumbing and fire sprinkler together), an energy inspection and the final. If a trade permit is missing, the 4-way request is canceled. Re-roofing is inspected from photos of the nailing pattern, joint seal and finished roof uploaded to the portal. A manufactured home gets its final inspection after tie-down and electrical connection but before skirting, and a pool needs a bonding inspection.
The Certificate of Occupancy is emailed to the permit holder; the City asks for up to two business days after the approved final inspection.
Local details that matter in Leeds
Permit life: a permit becomes invalid if work has not started within 180 days of issue, or stops for 180 days. The Building Official can grant written extensions of up to 180 days each for good cause.
Driveways: on a state highway the contact is ALDOT (205-327-4963); on a Jefferson County road, Jefferson County Roads and Transportation (205-325-5141); on a city street, the City’s own driveway access application.
Septic by county: Jefferson County onsite sewage is on 205-930-1230, St. Clair County on 205-338-3357 and Shelby County on 205-685-4178.
Downtown historic district: the Leeds Historical Preservation Commission oversees the preservation of buildings there.
Site plans and subdivisions: the Engineering unit reviews and permits commercial site plans, subdivisions and right-of-way excavation, and the Planning and Zoning Commission is the sole authority on subdivisions in the city.
Board of Zoning Adjustments: it typically meets at 5 p.m. on the 4th Tuesday of each month, except November and December, at 1412 9th Street. Rezoning applications are taken by appointment or through the portal.
Want this handled start to finish?
Get a free quote →Food businesses: health department approval must be in hand when the City issues the Certificate of Occupancy.
Alabama building code
From 1 January 2027, under Act 2024-443, a residential home builder must build to the applicable residential code (the Alabama Residential Building Code, or the local code where one applies) even where no building department inspects the work. Since 1 October 2024 the Alabama Home Builders Licensure Board adopts the residential code, and the Licensing Board for General Contractors the commercial energy code. Alabama’s codes and the 2027 change
Official Leeds permitting resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
- City of Leeds Development Services
- City of Leeds Citizenserve permit portal
- City of Leeds Development Services FAQs
- Leeds Code of Ordinances (Chapter 10, buildings and construction)
- City of Leeds fee schedule (2023)
- City of Leeds Commercial Checklist
- City of Leeds Engineering
- Leeds Planning and Zoning Commission
- Leeds Board of Zoning Adjustments
- Leeds Historic Preservation Commission
Inspections are where schedules slip.
Get a free quote →Leeds building permit FAQs
Who issues building permits in Leeds, Alabama?
The City of Leeds Development Services Department, 1404 9th Street, 205-699-0907. Applications are filed in the Citizenserve portal.
How much is a building permit in Leeds?
The City code sets the fee at 0.9% of valuation, so $2,250 on a $250,000 job. The 2023 fee schedule adds an $11.82 technology fee to every permit.
How long does it take to get a permit in Leeds?
Electrical, mechanical, plumbing and re-roofing permits take up to 24 to 48 hours once the application is complete. Other permit types take up to 7 to 10 days.
Can a property owner get the permit themselves?
Yes. Permits are issued only to the property owner or the owner’s authorized agent or contractor, and an owner can name an agent with the Authorized Agent Form.
How do I schedule an inspection in Leeds?
In the Citizenserve portal, at least one day in advance. Same-day requests are not accepted.
How long is a Leeds permit good for?
Work must start within 180 days of issue and must not stop for 180 days. Extensions of up to 180 days can be granted in writing.
When is the Certificate of Occupancy issued?
After every required permit and document is on file and the final inspection is approved. The City emails it within about two business days.
Do I need a permit to re-roof a house in Leeds?
Yes. Re-roofing has its own permit, and the inspection is done from photos uploaded to the portal.
Simplify Leeds permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Alabama. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Leeds sooner?
Let Alliance prepare, file, and track your Leeds permits while your crew stays on the job.