Helena’s Department of Building, Planning & Community Development at City Hall issues building, grading and sign permits on paper applications, with fees and impact fees set by City ordinance.

Authority: City of Helena Department of Building, Planning & Community DevelopmentCode: 2012 International Codes, 2011 NEC (Ordinance 881-2021)Phone: (205) 663-2161
Authority
Building, Planning & Community DevelopmentKeith Martin, Building Official
Office
City Hall, 10 Jack Gray WayMonday to Friday, 8:00 a.m. to 4:00 p.m.
New home
$1,000 base fee plus valuation feePlus $3,541 impact fee and $25 issuance fee
Commercial
$1,000 plus 0.85% of valuationOrdinance 881-2021

Inside Helena’s city limits, permits are approved by the Building Official in the Department of Building, Planning & Community Development at City Hall, 10 Jack Gray Way. The City uses a one-page paper Building Permit form. Under Ordinance 881-2021 a commercial permit costs $1,000 plus 0.85% of the construction valuation, a new house pays a $1,000 base fee plus a valuation-based fee, and a new single-family home also pays a $3,541 impact fee before the permit is issued.

What requires a building permit in Helena?

Helena’s zoning ordinance makes it unlawful to start earthwork, build or move any building or other structure, put up a sign, or alter or repair a structure until the Building Official has issued a permit. Accessory structures are named in that rule. The fee ordinance then carves out ordinary upkeep.

Permit required

  • New buildings, additions and alterations
  • Decks and porches
  • Remodeling, including siding and roofing
  • Mechanical, gas and plumbing work
  • Swimming pools
  • Signs and temporary banners
  • Grading and clearing (land disturbance)
  • Land development
  • Demolition and moving a building
  • Temporary construction structures

Exempt

  • Repairs or normal maintenance such as painting and pressure washing

An accessory structure may not be built or moved onto a lot until construction of the main building has started. Fences are limited to 3 feet high in a front yard and 6½ feet in a side or rear yard, and nothing that blocks visibility may stand within 25 feet of a street intersection in a residential district.

Who issues permits in Helena?

The Department of Building, Planning & Community Development handles permitting, inspections, development and zoning. Keith Martin is the Building Official for residential and commercial work, and the ordinance has permits issued by the Building Official or the City Clerk. Ordinance 881-2021 applies to buildings within the corporate limits; the city has a Shelby County portion and a Jefferson County portion, and the same City office permits both.

Short on time to read all of this?

Get a free quote →
Helena building department contact
DetailInformation
OfficeHelena Municipal Building (City Hall), 10 Jack Gray Way, Helena, AL 35080
City Hall phone(205) 663-2161
Building OfficialKeith Martin, ext. 221
Building Inspection Clerkext. 452
HoursMonday to Friday, 8:00 a.m. to 4:00 p.m.
Planning and Zoning CommissionMeets on the third Thursday of each month

Helena permit forms

The City posts three construction forms on its Licenses & Permits page:

  • Building Permit: one form for a new building, addition, alteration, repair or replacement, wrecking, moving, or a foundation-only permit. It asks for the electrical, plumbing and heating/AC costs and the names of those subcontractors, the type of sewage disposal with the Health Department permit number for a septic tank, and whether the site is in a flood plain.
  • Grading and Clearing Permit: issued under Ordinance 597-02. The inspection record is posted at the front of the lot, and the signed-off record has to be brought back to City Hall before a building permit for the same lot is issued.
  • Temp Sign-Banner Permit for temporary signs.

Builders and developers also need a City business licence; licence questions go to (205) 663-2161 ext. 116.

Permit costs and fees in Helena

Building and development fees come from Ordinance 881-2021, adopted April 26, 2021 and in effect since May 1, 2021. Impact fees come from Ordinance 889-2022, adopted April 25, 2022.

Helena permit fees (Ordinance 881-2021)
PermitFee
Commercial and general permits$1,000 base fee plus 0.85% of the valuation of construction
New residential construction$1,000 base fee plus the valuation fee in Appendix L of the 2012 International Residential Code
Decks, porches, remodeling and additions, including siding and roofingAppendix L fee on the total cost or valuation; $50 minimum
Residential mechanical, gas and plumbing; swimming poolsAppendix L fee
Commercial mechanical, gas and plumbing0.85% of the cost of construction
Sign1% of the cost of the job
Land disturbance (grading and clearing)$100 residential; $400 commercial
Land development$6 per $1,000 of total estimated cost
Issuance fee, added to every permit$25
Trade re-inspection$25 each

Not sure this scope needs a permit?

Get a free quote →

For example, a commercial building valued at $500,000 pays $1,000 plus $4,250 (0.85%), and the $25 issuance fee, a total of $5,275 before the state construction industry craft training (CICT) fee and impact fees.

Helena impact fees (Ordinance 889-2022)
Development typeImpact fee
Single-family home$3,541 each ($2,844 parks and recreation, $697 transportation)
Multi-family or mixed-use residential$2,407 per unit
Commercial and mixed-use commercial$0.97 per sq ft
Office and other services$0.36 per sq ft
Institutional$0.27 per sq ft
Industrial$0.15 per sq ft
Hotel$324 per bedroom
Assisted living$98 per bed

The Building Department collects the impact fee before the building permit is issued, and the fee can never be more than 1% of the estimated fair market value of the finished development. If work starts before the permit, the ordinance doubles the fees, and each further failure adds $100.

Electrical, plumbing, mechanical and gas work

Helena adopted the 2011 National Electrical Code and the 2012 International Mechanical, Plumbing and Fuel Gas Codes. Residential mechanical, gas and plumbing permits are charged from the Appendix L table and commercial ones at 0.85% of the cost of the work. The Building Permit form itself collects the electrical, plumbing and heating/AC cost figures and the names of the electrician, plumber and HVAC contractor.

Rather talk it over?

Call 1-855-478-4290 →

The Building Official and the Fire Code Official share enforcement of the ordinance, and the City adopted the 2012 International Fire Code with the 2013 NFPA codes as excepted by the State Fire Marshal’s Office. Open burning needs a burn permit: $25 residential, $50 commercial.

Application documents

Plan to submit with the permit form

  • A drawing or plat to scale, in duplicate, with lot and building dimensions based on an actual survey
  • The shape, size, use and location of every existing and proposed building, sign or structure
  • Existing and proposed storm water drainage
  • Setback and side lines of buildings on adjoining lots
  • Fire hydrant locations with adequate flow

Certifications

  • Written certification from the Helena Utility Department, or from the Shelby County Health Department for a septic system, that sewage treatment is available
  • The signed-off grading inspection record, where the lot was graded or cleared first
  • For a theater, hotel, private school or commercial building of 15 or more rooms: the architect’s written certification of state approval of the plans

One copy of the approved drawing stays with the Building Official and the duplicate is kept with the permit at the site throughout construction. The Shelby County Health Department’s environmental office is on 205-620-1650.

How to apply: 6-step Helena process

1. Check zoning with the department

Call (205) 663-2161 and ask for the Building Official or the Building Inspection Clerk; rezonings and site matters go to the Planning and Zoning Commission on the third Thursday.

2. Get the grading permit first if the lot needs clearing

Pay $100 (residential) or $400 (commercial), post the inspection record on the lot and have the finished grading inspected.

3. Line up sewer or septic approval

Obtain the Helena Utility Department or Shelby County Health Department certification.

4. File the Building Permit form at City Hall

Bring the form, the survey-based plans in duplicate and the subcontractor and cost details to 10 Jack Gray Way.

5. Pay the permit, issuance and impact fees

No permit is issued until every fee in the ordinance has been paid.

6. Build without long breaks

A permit expires if work stops for 90 days without the Building Official’s written approval.

Rather not deal with the building department?

Get a free quote →

Inspections and the Certificate of Occupancy

Helena’s Building Inspector covers residential and commercial work. If an inspector arrives and the work is not substantially complete or not ready, a re-inspection fee of $25 per trade must be paid before the re-inspection is scheduled. At the final inspection, one re-inspection is free; after that the City charges $25 for each item still uncorrected.

No building may be used or occupied until the Building Official issues a Certificate of Occupancy. The zoning ordinance gives the Building Official three working days from the owner’s notice that the building is ready to make the final inspection and either issue the certificate or refuse it in writing with reasons. Appeals of zoning decisions go to the Board of Adjustment, and appeals of building or fire code decisions are heard by the City Council.

Local Helena details that matter

Temporary suspension on some commercial uses: Ordinance 1043-2026 suspends, for 180 days from its effective date, building permit and site plan applications for new or expanded gas stations, auto parts stores, mechanic shops, automobile or manufactured home dealerships and data centers within 500 feet of the centerline of Highways 17, 52 (except the stretch shared with Highway 261), 58 and 95.

Two expiry rules: under the fee ordinance a permit lapses when work stops for 90 days, or after 6 months if the work is abandoned, with no refund. Under the zoning ordinance a permit also expires if nothing has been built above the foundation within 6 months of issue, and it can be renewed only once.

Storm water: Helena runs an MS4 storm water program and posts its Storm Water Management Program Plan and a builder’s guide to low-impact development on the department page.

Impact fee disputes: an owner can appeal an impact fee to the Impact Fee Review Committee and then to the City Council.

Want this handled start to finish?

Get a free quote →

Alabama building code

From 1 January 2027, under Act 2024-443, a residential home builder must build to the applicable residential code (the Alabama Residential Building Code, or the local code where one applies) even where no building department inspects the work. Since 1 October 2024 the Alabama Home Builders Licensure Board adopts the residential code, and the Licensing Board for General Contractors the commercial energy code. Alabama’s codes and the 2027 change

Official Helena permitting resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Inspections are where schedules slip.

Get a free quote →

Helena building permit FAQs

How much is a building permit for a new house in Helena?

A $1,000 base fee plus a valuation fee from Appendix L of the 2012 International Residential Code, a $25 issuance fee, and a $3,541 impact fee for a single-family home.

What does a commercial building permit cost?

$1,000 plus 0.85% of the construction valuation, a $25 issuance fee, the state CICT fee and an impact fee per square foot ($0.97 for commercial space).

Do I need a permit to replace a roof or siding?

Yes. The fee ordinance prices remodeling “including siding, roofing” on the cost of the work, with a $50 minimum. Painting and pressure washing are exempt.

How tall can my fence be?

Up to 3 feet in a front yard and 6½ feet in a side or rear yard under the zoning ordinance.

Which building codes does Helena use?

Ordinance 881-2021 adopts the 2012 International Building, Residential, Existing Building, Fire, Mechanical, Plumbing and Fuel Gas Codes and the 2011 National Electrical Code.

When does a Helena permit expire?

When work stops for 90 days without written approval from the Building Official, or after 6 months of abandonment. Fees are not refunded and a new permit must be bought.

Who is the Building Official?

Keith Martin, at City Hall, (205) 663-2161 ext. 221, Monday to Friday, 8:00 a.m. to 4:00 p.m.

Simplify Helena permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Alabama. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Helena sooner?

Let Alliance prepare, file, and track your Helena permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Helena permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.