Building Without a Permit in Florida: What It Takes to Fix

The doubled fee is the part everyone warns you about. It is rarely the expensive part — because work built years ago gets reviewed against today's code, not the code you built it under.

By Weston SenatoreReviewed by Marshall Chmura, Founder & CEOPublished 12 min read

Get a free quoteSee Our ServicesCall 1-855-478-4290

Three costs that stack

What an after-the-fact permit involves Three costs stack on an after-the-fact permit: the penalty fee, review against the current code rather than the code at the time, and opening up finished work for inspection. THE PART YOU EXPECT The penalty fee + THE PART THAT COSTS Today’s code, not yesterday’s + AND THE ONE NOBODY PLANS Opening it up IT IS FIXABLE. IT IS ROUTINE. IT IS JUST NOT CHEAP.
What you can controlWhat the code decides

Most people searching building without a permit are not planning anything. They already did the work, or they bought a house where someone else did, and they are trying to find out how bad it is.

Short answer: fixable, routinely, and more expensive than the fee you will read about.

If you need an after-the-fact permit filed: we handle them, including work inherited with a property. We prepare, file and track permits in all 50 states across seven trades.
Request a Free Quote

What an after-the-fact permit is

An after-the-fact permit is a permit obtained for work that was already built without one. You apply now, for work done earlier, and it is reviewed and inspected like any other permit with a penalty on top.

The important thing to know first is that this is a normal process. Jurisdictions issue after-the-fact permits routinely and have published procedures for them. Nobody is going to arrive and demolish your kitchen because you replaced a water heater in 2021.

Want it handled rather than researched? Request a free quote and tell us what was built.

The penalty fee, and what sets it

The statewide hook is Florida Building Code § 109.4: any person who commences work on a building, structure, electrical, gas, mechanical or plumbing system before obtaining the necessary permits is subject to a fee established by the building official, in addition to the required permit fees. Many jurisdictions adopt an amended version that adds “or without prior approval from the building official as permitted in Section 105.2.2 or 105.12” — and that is the wording worth reading closely.

The penalty attaches because nobody asked. Asking is what exempts you.

Those two cross-references, where your jurisdiction has adopted them, are the whole structure of this topic. § 105.2.2 covers ordinary minor repairs made with the building official's approval. § 105.12 covers starting the scope before the permit issues, again with approval. Both are routes that keep you out of the penalty, and both require a conversation you did not have.

Note what that does and does not say. It establishes that a penalty applies. It does not set the number — the building official does, under authority traced to Fla. Stat. § 553.80.

So the multiplier is local, and jurisdictions set it two different ways. Miami-Dade County Code § 8-12(c) requires an applicant to pay double the fee where work requiring a permit was started before the permit was obtained. Others move the decision — Seminole County's adopted Chapter 1 has the fee set by the Board of County Commissioners rather than the building official. Separate code enforcement fines can run alongside the permit penalty entirely.

The penalty can sometimes be reduced

Less widely known: several jurisdictions amend § 109.4 to allow the building official to grant extensions of time or waive fees where justifiable cause is demonstrated in writing — Palm Beach County's amendments are one example. Some jurisdictions go further and publish a formal request process for it.

Worth asking whether your jurisdiction has an equivalent before you simply pay. The same amended language also makes a point worth absorbing: paying the double fee is not a substitute for, and does not preclude, prosecution for commencing work without a permit.

Which is why the honest answer to "what is the fine" is that you have to ask your jurisdiction. The usual pattern is that the penalty is calculated off the permit fee — so it scales with the size of the work, not with how long ago you did it.

We confirm the multiplier before you file, not after. Request a free quote.

Florida permit guides Penalty multipliers are set county by county. We maintain published requirements across Florida. Browse Florida guides

If it was an emergency, you may not be in this at all

Before going further: a meaningful share of people who think they have unpermitted work have an emergency repair, and the code treats that differently.

§ 105.2.1 provides that where equipment replacements and repairs must be performed in an emergency situation, the permit application is submitted to the building official within the next working business day. Some jurisdictions add notification requirements on top — Palm Beach County's amendments require notice including the work address, the nature of the emergency and the scope of work, immediately or by the next business day.

Several jurisdictions also amend § 109.4 so the penalty does not apply to emergency work where delay would clearly have placed life or property in imminent danger — provided the permit is then applied for promptly, within three business days in Palm Beach County's version, with unreasonable delay bringing the penalty back.

A failed condenser in August is an emergency repair. It stops being one the week you did not file.

So if a supply line burst, a panel failed, or a condenser died and the work had to happen that day, the right move is a next-business-day application, not an after-the-fact filing weeks later. The window is short and it closes quietly.

Happened recently and still inside the window? Tell us today and we will file it as an emergency repair rather than after the fact.

The cost nobody budgets for

Here is the part that turns a manageable problem into an expensive one, and almost nothing written on this topic leads with it.

Your work is reviewed against today's code, not the code you built it under.

This follows from how the Florida Building Code assigns editions. Under § 105.3, each application is inscribed with its date of application and the code in effect as of that date applies — which we cover in which Florida building code applies to your permit. An after-the-fact application is made today, so today's edition is the one in play.

One qualification a careful reader should raise: the Florida Existing Building Code governs alterations, repairs and changes of occupancy in existing buildings and carries its own provisions, so the exact standard applied to a given as-built scope depends on which volume governs it. The direction of travel is the same — you are measured against current requirements rather than the ones in force when you built — but the building official determines which provisions apply to your specific work.

Work installed in 2019 under the 6th Edition is reviewed in 2026 against the 8th — and applications filed from December 31, 2026 are reviewed against the 9th. Anything the code tightened in between — and in Florida, with hurricane provisions and energy requirements, plenty tightened — now has to be brought up.

That is where the real money is. Not the doubled permit fee, which is a known quantity, but the possibility of removing and replacing work that was perfectly good when it went in and is simply no longer current.

Not sure which edition your work would be judged against? Tell us when it was built and we will tell you what you are filing into.

Opening up finished work

The second cost follows from a simple fact: an inspector cannot approve what they cannot see.

Concealed work — framing, wiring, plumbing, mechanical, anything behind drywall or under finishes — generally has to be exposed for inspection. In practice that means finishes come off, the inspection happens, and the finishes go back on.

How much gets opened depends on scope and on what the inspector needs to verify. A reroof is visible. A bathroom where the supply lines were moved is not. Where the work involved the five trades — electrical, plumbing, mechanical, gas, structural — assume something gets opened.

A reasonable follow-up at this point is whether a private provider can certify the work instead of the jurisdiction inspecting it. That question has been put to Miami-Dade's Board of Rules and Appeals directly — its 2022 guidance memo addresses both whether a building official may refuse a private provider to an owner or contractor already cited for failing to obtain a permit, and whether concealed work can be certified without inspection. If you are considering that route, read the guidance for your jurisdiction before assuming it is open.

This is also why the advice to "just leave it and hope" ages badly. Every year that passes adds finishes over the top of the problem, and the cost of exposing it rises while the cost of the permit does not fall.

Better to deal with it now than after another remodel covers it. Get a quote.

What unpermitted work blocks

Three knock-on effects, and the first one catches people who were otherwise content to leave it alone.

New permits on the same property. Jurisdictions commonly refuse to issue a new permit where there are unresolved violations or open permits on the parcel. So the unpermitted carport from 2018 stops the addition you want to build in 2027. This is the most common way old unpermitted work finally becomes urgent.

Resale. It surfaces during diligence, at the point where you have least leverage and a closing date to hit. Buyers price it, and they price it badly for you.

Insurance. Carriers ask how work was done. An unpermitted, uninspected alteration is a question you do not want live at claim time, particularly in Florida where roofing and openings carry so much weight.

Blocked on a new permit by something old? That is a common reason people call us. Request a free quote or call 1-855-478-4290.

If you inherited it with the house

A large share of after-the-fact permits are not filed by the person who did the work.

Unpermitted work and open permits attach to the property, not to whoever built it. They transfer at closing, and they frequently transfer silently — a previous owner's enclosed patio or converted garage shows up years later when you apply for something unrelated.

Two practical points. If you are buying, search the property's permit and violation history during diligence rather than after; it is a public record search and it takes minutes. And if you already own it, the fact that someone else did the work does not change who has to resolve it, which is worth knowing before you spend energy on the unfairness of it.

We cover the property-record search alongside the other pre-filing checks in the five most common permit rejection reasons.

Inherited something with a purchase? We run the permit history and file the fix. Request a free quote.

Worth including because the people who build without permits are usually solving a real scheduling problem, and there is a sanctioned version of it that almost nobody uses.

Under Florida Building Code § 105.12, the scope of work described in a submitted permit application and plans may be started before the permit is issued — but only on the building official's approval, entirely at the applicant's risk, and the work may not proceed past the first required inspection. On a direct contract over $5,000, the building department also needs a copy of the recorded notice of commencement before the first inspection.

There is a legal way to start before the permit issues. It requires asking.

Some jurisdictions tighten how you ask. Palm Beach County amends § 105.12 to require a written request rather than a verbal approval, which is worth knowing given the advice here is to have the conversation. That is a narrow allowance and it is not a loophole: you still need an application on file, plans submitted for review, and the building official's say-so. But if the problem is that a crew is mobilized and a permit is two weeks out, this is the conversation to have rather than the one where you start anyway.

Related: in some states a jurisdiction that misses its own statutory deadline owes you something. We set out which ones in how long does a building permit take.

Permit two weeks out and a crew mobilized? Filing faster is the part we can actually help with. Get a quote.

How to work through it

Five steps, in order.

1. Stop, if work is still in progress. Continuing after you know is a different and worse posture than discovering it late. Jurisdictions distinguish between the two.

2. Establish what is actually unpermitted. Pull the property's permit history. Some of what you assume is unpermitted may have been permitted and simply never closed out, which is a different and easier problem.

3. Get the as-built condition documented. An after-the-fact application generally needs drawings reflecting what exists, sealed where the scope requires it. That is your architect or engineer, not a filing service and not the jurisdiction.

4. File the application and pay the penalty. Expect a multiplier on the permit fee and, where code enforcement is already involved, a separate resolution track alongside it.

5. Expose what needs inspecting, and schedule. Then the normal inspection sequence runs, and the permit closes like any other.

None of that is clever. It is just a sequence, and the main value in knowing it is that it is finite — there is an end state where the property is clean and the problem is gone.

We run that sequence routinely. Request a free quote or call 1-855-478-4290.

Where we come in

We file after-the-fact permits, including work inherited with a property, and it is a meaningful share of what we do in Florida.

That means pulling the property's permit and violation history so you know the actual scope of the problem, assembling the application with whatever the jurisdiction requires for as-built work, confirming the penalty structure for that specific jurisdiction before you are surprised by it, filing, tracking the review, routing comments, and coordinating the inspection sequence through to closeout.

What we do not do is produce the as-built drawings, determine whether existing work complies, or decide what has to be removed. Those belong to your design professional and the building official. The full scope is in what permit expediting actually covers.

Have unpermitted work to resolve? Tell us what was built and roughly when — we will tell you what the filing looks like.

After-the-fact permit FAQ

What is an after-the-fact permit?

A permit obtained for work that was already built without one. The application is made now, for work done earlier, and it is reviewed and inspected like any other permit, with a penalty fee on top. It is the normal route back to compliance and jurisdictions issue them routinely.

What is the penalty for building without a permit in Florida?

Florida Building Code § 109.4 provides that anyone commencing work before obtaining the necessary permits is subject to a fee set by the building official in addition to the required permit fees. Local codes set the multiplier — Miami-Dade County Code § 8-12(c) requires double the fee where work started before a permit was obtained. Separate code enforcement fines can run alongside that. Confirm current figures with the jurisdiction, since fee schedules change.

Is unpermitted work judged against the code in place when it was built?

No, and this is usually the largest cost. The Florida Building Code applies the edition in effect on the date of the application, so an after-the-fact application filed today is reviewed against today's code. Work that complied when it was installed can fail review years later, and bringing it up to the current edition is where the real expense sits rather than in the penalty fee.

Will I have to open up finished work?

Often yes, in part. An inspector cannot approve what cannot be seen, so concealed work such as framing, wiring, plumbing and mechanical usually has to be exposed for inspection. The practical effect is that finishes come off, get inspected, and go back on.

I bought a house with unpermitted work. Whose problem is it?

The current owner's, in practice. Unpermitted work and open permits attach to the property rather than to whoever did the work, so they transfer at closing. Jurisdictions commonly refuse to issue new permits on a property with unresolved violations or open permits, which means work somebody else did years ago can block your project today.

What if the work was an emergency repair?

Florida Building Code § 105.2.1 provides that where equipment replacements and repairs must be performed in an emergency, the permit application is submitted to the building official within the next working business day. Some jurisdictions add notification requirements, and several amend § 109.4 so the penalty does not apply to emergency work where delay would clearly have placed life or property in imminent danger, provided the permit is applied for promptly. The window is short, so a failed condenser handled on the day is a different filing from the same work reported three weeks later.

Can you start work legally before a permit is issued in Florida?

In limited circumstances, yes. Florida Building Code § 105.12 allows the scope described in a submitted permit application and plans to be started before the permit issues, but only with the building official's approval, entirely at the applicant's risk, and the work may not proceed past the first required inspection. That is a formal authorization, not an assumption anyone can make on their own.

Current as of November 2026. Penalty multipliers, code enforcement procedures and fee schedules are set locally and change. Nothing here is a determination about your specific property or a statement of what any code edition requires — the authority having jurisdiction makes those calls. This is general information about administrative process, not legal advice. Where code enforcement action is already underway, consider getting legal advice rather than relying on an article.

Weston Senatore — Marketing Lead, Alliance PermittingWeston writes about the administrative side of construction permitting for Alliance Permitting. This article draws on our filing team's day-to-day work across Florida, Texas, Georgia and North Carolina.

Alliance Permitting prepares, files, tracks, and coordinates construction permits in all 50 states for homebuilders, roofing, solar, mechanical, electrical, plumbing, and windows, doors and siding contractors. We do not perform plan review, inspections, engineering, or construction, we do not determine whether existing work complies, and we do not influence review decisions. Browse our Florida permit guides or request a free quote.