In the Village of Little Chute, the Inspections Department at Village Hall, 108 W. Main Street, issues permits for houses, garages, decks, remodels and the electrical, plumbing and HVAC work that goes with them (920-423-3871). The village holds the state’s delegation for new one- and two-family homes, but it is not delegated for commercial buildings, so commercial plans and commercial electrical permits go through the state. Under the 2026 residential schedule a new single-family house costs a $600 flat building fee plus $0.10 per square foot above 2,000 square feet, with the state stamp, erosion control and a $500 park fee added.
What requires a building permit in Little Chute?
Little Chute asks for a permit before new construction, repairs, additions, alterations and demolition, and also for a change in a building’s use. The department’s 2026 information document lists common jobs with a plain yes or no, and it asks you to call if your project is not on the list.
Permit required
- New houses, garages, sheds, porches, sunrooms, ramps and additions
- Basement and bathroom remodels, new window or door openings, and moving or removing walls, columns or beams
- Decks, fences, pools (not small kiddie pools) and hot tubs
- Driveways, parking slabs and patio slabs
- New furnaces and water heaters, or a replacement that changes the fuel or vent type; new fireplaces
- Added electrical branch circuits and added plumbing fixtures; water, sanitary and storm connections
- Moving or razing a building; signs (through zoning); satellite dishes
No permit
- Residential and commercial reroofing
- Residential siding
- Exact replacement of residential windows and doors, and commercial window replacement
- Furnace or water heater replaced with the same type, size and fuel
- New flooring, kitchen cabinets, painting and landscaping
Sidewalks, driveway aprons and curb work in the public right-of-way are permitted by Public Works rather than the Inspections Department. Work started without a permit is subject to a doubled permit fee and a stop-work order until a permit is issued.
What Little Chute decides and what the state holds
DSPS lists the village as delegated to enforce the Uniform Dwelling Code for new one- and two-family homes (list current as of 9/24/2026). Little Chute is not on DSPS’s October 2026 lists of delegated agents for commercial building and HVAC plan review, commercial plumbing plan review or commercial electrical inspection, and the village’s commercial fee schedule says so directly: its commercial fees cover zoning verification and recording only. The village sets its own zoning, site plan and design rules, fees and right-of-way permits; the building codes themselves are the state’s.
Little Chute building department: who handles permitting
The Inspections Department handles residential building, electrical, plumbing and HVAC permits and inspections and issues certificates of occupancy. The Community Development Department runs planning and zoning (site plans, conditional uses, rezonings, zoning occupancy permits), and Public Works issues right-of-way and erosion control permits from the second floor of Village Hall. On commercial projects the state reviews plans and permits commercial electrical work, while the village records the project and checks zoning.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Inspections Department | Village Hall, 108 W. Main Street, Little Chute, WI 54140; 920-423-3871; buildinginspector@littlechutewi.org |
| Inspector counter hours | Monday to Friday, 8:00 to 9:00 a.m. and 1:00 to 2:00 p.m. |
| Village Hall hours | Monday to Friday, 8:00 a.m. to 4:30 p.m., closed on holidays; main line 920-788-7380 |
| Community Development | 920-423-3870 (site plans, conditional uses, rezoning, zoning occupancy) |
| Public Works | Second floor of Village Hall, weekdays 8:00 a.m. to 4:30 p.m.; cash or check only |
| Portal | Cloudpermit (village page); new homes also on the DSPS eSLA portal |
Little Chute permit types
The village’s building permits page has an online Cloudpermit application for each common job, with paper forms for fences and small sheds, and accepts applications by email or in person as well. Property owners are responsible for getting the permit, though contractors may apply for them.
Residential permits
- New one- and two-family homes: filed in Cloudpermit and on the state’s eSLA online building permit system, which routes the state application to the village. The plan set needs a plat of survey signed and stamped by a licensed surveyor or civil engineer, grades and elevations set by the surveyor, an erosion control plan, floor plans and elevations, a wall bracing plan, and ResCheck and heat-loss calculations.
- Additions and remodels: one application covers residential additions and remodels; owner-occupants of single-family homes may draw their own plans unless the code says otherwise.
- Accessory buildings: sheds of 200 square feet or less use the shed permit; detached garages over 200 square feet need a site plan with distances to lot lines and other buildings and their own requirements sheet.
- Smaller jobs: fences, pools and hot tubs, driveways, razing and water, storm or sanitary laterals each have an application, as do residential chicken coops.
A permit for a new house will not be issued unless the lot abuts an existing street and public sewer and water are already installed in the streets serving it. Lot corners and the house corners must be staked before work starts, and no lookout or walkout basement may be built unless it is on the approved plan.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial construction has its own online application, but plans that need state review go to DSPS because the village is not delegated. The village then issues a zoning compliance permit and records the state-approved plans: plumbing systems over 15 fixtures and new commercial HVAC installs must bring the state plans. Commercial electrical permits are pulled through the state system, and DSPS inspects. If DSPS allows a village-contracted inspector to do an expedited inspection, the contractor or owner pays for it.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Site plan review. New commercial, industrial, institutional and multi-family buildings and additions over 10,000 square feet need a major site plan review ($600); smaller additions and parking lots a minor review ($300).
- Plan Commission. It meets on the second Monday of each month at 5:00 p.m., with submittals due at least three weeks earlier. Conditional uses get a public hearing before the commission; rezonings go to the Village Board after a commission recommendation and a public hearing.
- Zoning occupancy permit. A new business or tenant files a zoning occupancy permit ($100) with Community Development.
- Right-of-way and erosion control. Sidewalks, driveway approaches, curb openings, culverts and the erosion control permit come from Public Works.
- Sewer connection. The Heart of the Valley Metropolitan Sewerage District charges a connection fee by water meter size on all new construction.
Little Chute building permit fees
The Inspections Department publishes a 2026 residential fee schedule for one- and two-family work and a 2026 commercial schedule marked “Approved on 11/19/25.” Payment is by check or cash, at Village Hall, by mail or in the drop box at the Grand Avenue entrance.
| Permit | Fee |
|---|---|
| New single-family house | $600 + $0.10/sq ft over 2,000 sq ft, plus $35 state stamp, $100 erosion control, $500 park fee per dwelling |
| New two-family house | $1,000 + $0.10/sq ft over 3,000 sq ft, plus the same add-ons |
| New mobile or manufactured home | $200 building, $50 electrical, $50 plumbing |
| Addition / remodeling | $100 / $50 + $5 per $1,000 of cost, $600 maximum |
| Deck | $100 + $5 per $1,000 of cost, $600 maximum |
| New window or door opening | $20 + $5 per opening |
| Detached garage (200 sq ft or more) / shed (under 200 sq ft) | $200 / $50 |
| Fence; driveway, patio or flatwork; pool or hot tub | $50 each |
| Electrical: new single-family / two-family | $150 / $200 |
| Electrical: service replacement / generator or solar | $50 / $100 |
| Plumbing: new single-family / two-family | $150 / $200 |
| Plumbing: additions or remodel | $50 + $5 per fixture over 3 |
| HVAC: furnace, A/C or garage heater | $50 per unit |
| Laterals (storm, sanitary, water) | $50 each |
| Raze primary / secondary structure | $100 / $50 |
| Re-inspection | $50 (after the second failed inspection) |
Rather talk it over?
Call 1-855-478-4290 →Worked example from the residential schedule: a 2,400-square-foot single-family house pays $600 plus $40 (400 square feet over 2,000 at $0.10), or $640, then $35 for the state stamp, $100 for erosion control and the $500 park fee, for $1,275; electrical and plumbing permits add $150 each, and HVAC $50 per unit. The 2026 sewer district connection fee is $1,632 for a 5/8-inch or 3/4-inch water meter and $4,081 for a 1-inch meter.
- Commercial zoning and recording fees: new commercial zoning compliance $100 plus $5 per 1,000 square feet; commercial additions or remodels $100; early start for footings and foundation $50; plumbing over 15 fixtures and new HVAC installs $50 recording fees each.
- Other commercial items: lighted signs $75 (face change $20), unlighted signs $50, fire suppression $50, fence $50, driveway or parking lot $50, laterals $50 each, razing $100 for a primary and $20 for a secondary structure.
- Planning: major site plan $600, minor site plan $300, zoning occupancy permit $100.
- Expired permits: they must be reissued, for an extra fee.
Trade permits and who may pull them
For one- and two-family homes the village issues electrical, plumbing and HVAC permits through Cloudpermit and inspects the work. Its 2026 information document says every contractor must hold the right DSPS credential and may only subcontract to credentialed contractors: a Dwelling Contractor certification with a Dwelling Contractor Qualifier for builders, HVAC contractor registration, a master electrician license and a master plumber license.
- Electrical: work must be done by a state-licensed electrician, except that the owner of a one-family home he or she owns and lives in may wire beyond the main disconnect; a permit is still required.
- Plumbing: the village web page gives the same owner-occupant allowance for plumbing in a one-family home, but the 2026 information document says plumbing must be supervised by a master plumber and installed by licensed plumbers, and that an owner may add plumbing beyond the required kitchen sink and full bathroom only after the house is occupied. Ask the inspector which applies to your job.
- HVAC: an owner-occupant may take responsibility for carpentry, electrical and HVAC work; tenants and rental owners must hire licensed contractors.
- Flips and rentals: an owner who does not live in the house must hold the Dwelling Contractor and Qualifier credentials to pull building permits, and electrical, HVAC and plumbing changes must be done by state-licensed contractors.
Rather not deal with the building department?
Get a free quote →Commercial electrical permits are not issued by the village; they are pulled through the state’s system and inspected by DSPS. Electrical permits expire one year after issue, and building, plumbing and HVAC permits for homes after two years.
How to apply for a Little Chute building permit
Use the department’s yes-or-no list, or call the inspector at 920-423-3871 during counter hours.
Commercial and multi-family projects file site plan review with Community Development three weeks before a Plan Commission meeting.
Apply on Cloudpermit, email the application and attachments to the Inspections Department, or bring it to Village Hall; new houses also file on DSPS eSLA.
Survey, erosion control plan, floor plans, elevations, wall bracing and energy calculations for a new house; a site plan for garages and other accessory buildings.
Pay by check or cash, then post the permit placard in a front window or door visible from the road.
The applicant schedules every required inspection as work progresses.
Review, corrections and what causes delay
The village returns a set of approved plans for construction. New-house permits wait if the lot does not yet front a street with sewer and water installed, if the survey is not sealed, or if grades for the sidewalk and driveway have not been set by the surveyor. Changing the scope during construction means calling an inspector, and a larger scope may need an added permit. Commercial projects wait on state plan approval before the village records them.
Inspections and occupancy in Little Chute
Once a permit is issued, the Inspections Department inspects the project in stages and makes a final inspection at the end. For a new house the 2026 information document lists these inspections:
- Erosion control: the installed controls, which must also be checked weekly and after rain events until the site is stabilized
- Laterals: new water, storm and sanitary services, tracer wire, gravel, clay dam and pitch
- Footings and foundation: footing forms, rebar and drain tile bleeders before the pour, foundation rebar, then the foundation wall with drain tile, gravel, damp-proofing and insulation before backfill
- Electrical service, underground plumbing and vapor barrier before slabs are poured
- Rough-ins: plumbing, electrical and HVAC, each with the tests the code requires
- Framing, fire separation and insulation
- Final: all trades complete, followed by a certificate of occupancy once any non-compliant items are fixed
Want this handled start to finish?
Get a free quote →A $50 re-inspection fee is charged for each inspection after the second failed one. Permits are marked finished when the work complies.
Wisconsin building code in Little Chute
Little Chute enforces the state dwelling code on new homes under its DSPS delegation; commercial buildings fall to the state. FEMA’s Community Status Book lists Little Chute (community 550307) as participating in the National Flood Insurance Program, with flood maps effective July 22, 2010.
Wisconsin's Uniform Dwelling Code covers one- and two-family homes. Its Commercial Building Code covers public buildings, workplaces and buildings of three or more units. Local ordinances must conform to both. Wisconsin rules
Little Chute permit search and official resources
The Inspections Department says building records are available from the department on request, and it suggests that buyers use them to check whether permits were obtained and finished for new homes, additions and remodels. Ask at Village Hall or call 920-423-3871.
- Little Chute building permits and online applications
- Building Inspections: permit requirements and contacts
- Inspections Department information document 2026
- Residential building permit fee schedule 2026
- Commercial building and zoning compliance fee schedule 2026
- Heart of the Valley MSD connection fee schedule 2026
- Planning and Zoning: Plan Commission dates and applications
- Major site plan review application
- Detached garage requirements 2026
- Little Chute Cloudpermit portal
- DSPS eSLA portal (new one- and two-family homes)
- DSPS UDC delegated agents list
- FEMA Community Status Book, Wisconsin
Inspections are where schedules slip.
Get a free quote →Little Chute building permit FAQs
Do I need a permit to reroof or reside my house in Little Chute?
No. Residential reroofing and siding are on the village’s no-permit list, as are exact window and door replacements.
How much is a permit for a new house?
$600 plus $0.10 per square foot over 2,000 square feet, plus $35 state stamp, $100 erosion control and a $500 park fee; electrical and plumbing are $150 each.
Can I do my own electrical work?
The owner of a one-family home who lives in it may wire beyond the main disconnect, with a permit; rental owners and tenants must hire a licensed electrician.
Who reviews commercial plans in Little Chute?
The state. The village is not DSPS-delegated for commercial buildings, so it only issues zoning compliance and recording permits, and commercial electrical permits go through the state system.
Does a driveway or patio need a permit?
Yes. Driveways, parking slabs and patio slabs need a $50 permit; work in the street right-of-way also needs a Public Works permit.
How long is a permit good for?
Two years for homes, plumbing and HVAC, and one year for electrical; expired permits are reissued for a fee.
What happens if I start work without a permit?
The village issues a stop-work order, and the permit fee is subject to doubling.
Simplify Little Chute permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Wisconsin. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Little Chute sooner?
Let Alliance prepare, file, and track your Little Chute permits while your crew stays on the job.
More Wisconsin permitting guides
Outagamie County
Read guide →Appleton
Read guide →Grand Chute
Read guide →Madison Building Permit Guide
Read guide →Manitowoc Building Permit Guide
Read guide →Manitowoc County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Little Chute permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.