In the Town of Grand Chute, the Community Development Department at Town Hall, 1900 West Grand Chute Boulevard (920-832-1599), issues building permits and the electrical, plumbing and HVAC subcontractor permits, and its own building inspectors make the inspections; the town holds Uniform Dwelling Code delegation from the state. Under the 2026 fee schedule, a house addition costs $20 plus $12 for every 100 square feet, and a re-roof, new siding or a fence is a flat $35. Work started without a permit is charged triple.
What requires a building permit in Grand Chute?
Grand Chute’s rule is broad: an owner needs a permit for new construction, for any addition or change to the outside or inside of a structure, and for any electrical, heating or plumbing work. Anyone putting up a new building or taking over a new tenant space also needs a certificate of occupancy. The town’s own table sorts common projects:
Permit required
- Moving or building interior walls, or altering a kitchen or bathroom
- A new furnace, air conditioner or water heater, or new electrical outlets
- Changing the number of dwelling units
- Building, remodeling or adding on to any structure, including garages and sheds
- Decks, patios and screened porches
- New siding, re-roofing and fences
- Swimming pools: above-ground, in-ground or temporary
No permit
- Interior or exterior painting
- Replacing windows or doors with ones of similar style and size
- Installing gutters and downspouts
If the town finds an active project without permits, it stops all work until the permits are issued, charges triple the regular fee and can fine the owner for every day the work is out of compliance. The fee schedule prices patios only over 100 square feet.
What Grand Chute decides and what the state holds
The state writes the construction codes: the Uniform Dwelling Code for one- and two-family homes and the Commercial Building Code for other buildings. Grand Chute runs its own zoning, with a Plan Commission and a Zoning Board of Appeals, its own stormwater and erosion control rules, its public works permits and its own fees, including fire impact and park development fees on new homes. Outagamie County still issues shoreland zoning permits for lots in the shoreland area and sanitary permits where public sewer is not available.
Grand Chute building department: who handles permitting
Community Development, led by Community Development Director Michael Patza, handles planning, zoning, building inspection, GIS and assessment, with two building inspectors on staff. The DSPS list of Uniform Dwelling Code delegated agents (current as of 9/24/2026) shows the Town of Grand Chute as delegated, with the Community Development Director as contact and a town building inspector, so new houses are permitted and inspected by the town. The City of Appleton’s permit page warns that the Town of Grand Chute uses Appleton mailing addresses although it lies outside the city, so confirm the municipality before paying for a permit.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Community Development Department, Grand Chute Town Hall, 1900 W. Grand Chute Boulevard, Grand Chute, WI 54913 |
| Phone / fax | 920-832-1599 / 920-832-6036; Town Hall main line 920-832-1573 |
| comdev@grandchutewi.gov | |
| Hours | Monday to Thursday, 7:00 a.m. to 4:30 p.m.; Friday, 7:00 to 11:00 a.m. |
| Commercial plan review | Submitted through E-Plan Exam, as linked on the town’s forms page |
| Shoreland and septic | Outagamie County Zoning Department |
| UDC status | Town delegated by DSPS for one- and two-family dwellings |
Grand Chute permit types
Building permits use the town’s Uniform Building Permit Application, which covers construction, HVAC, electrical, plumbing and erosion control boxes and asks for the Dwelling Contractor and Qualifier numbers, or the owner-occupant’s statement. Electrical, plumbing, HVAC and sprinkler work is then filed by each trade on the town’s subcontractor permit application.
Residential permits
- New homes: two complete sets of plans with a site plan, a site and grade elevation sheet, heat loss calculations, a water sizing calculation from the plumber, erosion control information with a notarized financial guarantee, the driveway culvert application, the building cost estimate and a list of subcontractors with their credential numbers.
- Additions, garages and sheds: priced by floor area, with an assessor’s property record fee for structural work.
- Re-roofing, siding, fences, larger patios, fireplaces and wood stoves: flat-fee permits.
- Pools and hot tubs: priced by cost; seasonal or temporary pools have their own application.
- Demolition and moving: each needs a permit, a bond and insurance.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial projects file five sets of plans with a site plan. Plans the state must review go to DSPS, and the town then charges a $100 local submittal fee; the town’s forms page sends commercial building plan review to E-Plan Exam, and the town’s schedule points to E-Plan’s fee schedule for those SPS 302.31 review fees. Minor alterations that need no state plans pay $50 plus $10 per 100 square feet. A new building or a new tenant needs a certificate of occupancy, and the fire department runs pre-occupancy compliance inspections and acceptance tests of fire protection systems.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning: confirm the zoning district; rezonings, special exceptions, site plans and planned development districts go to the Plan Commission and Town Board, and variances to the Zoning Board of Appeals.
- Erosion control and stormwater: an online application, plan review and financial guarantee; disturbing an acre or more brings in the state’s NR 151 standards.
- Driveway and culvert: the town’s 2026 driveway and culvert permit and installation requirements.
- Utilities and right-of-way: a water, sewer and storm connection permit, and a separate permit for work in the public right-of-way.
- Shoreland or septic: an Outagamie County shoreland zoning permit in the shoreland area, and a county sanitary permit where no sewer is available.
Grand Chute permit costs and fees
Fees come from the Community Development Department’s 2026 fee schedule. Note 3 of the schedule waives the new-home plan review fee and the single-family fire impact fee for a new single-family house with less than 1,500 square feet of living area.
| Work | Fee |
|---|---|
| New construction, additions and alterations; garages and sheds | $20 + $12 per 100 sq ft |
| Remodeling when square footage cannot be set; pools and hot tubs | Up to $5,000: $20 + $10 per $1,000; over $5,000: $70 + $5 per $1,000 above $5,000 |
| Electrical, heating, ventilating or air conditioning | Up to $500: $30; $501–$1,000: $30 + $5 per $100 above $500; $1,001–$10,000: $55 + $12 per $1,000 above $1,000; $10,001–$100,000: $163 + $3 per $1,000 above $10,000 |
| Electrical service change | $30 for a 100 or 200 amp service; $50 over 200 amps |
| Furnace or air conditioner replacement | $40; both together $50 |
| Plumbing | $7 per fixture or appliance; laterals, water service and repairs $30 each; minimum $30 |
| Re-roofing, siding, fences, patios over 100 sq ft, fireplaces and wood stoves | $35 each |
| New home or duplex plan review / Wisconsin permit seal | $100 / $35 |
| Certificate of occupancy | $50 single family; $75 duplex |
| Erosion control plan review and inspections / drainage facilities check | $400 / $400 |
| Culvert, access or driveway permit | $60 |
| Fire impact fee | $346 single family; $264 per unit duplex or multi-family |
| Park development fee | $400 single family; $600 duplex; $200 per multi-family unit |
| Demolition | $25 garage or shed; $50 house; plus a bond of $500 to $2,000 by size |
Rather talk it over?
Call 1-855-478-4290 →Commercial work pays $15 per 100 square feet for new space up to 10,000 square feet, with lower rates on larger bands, a $150 certificate of occupancy and drainage facility checks from $600 to $2,000 by building size; non-residential construction also pays a fire impact fee of $1.70 per $1,000 of value. Planning applications are $500 for a site plan, rezoning, special exception or variance. Worked examples from the schedule: a 400-square-foot addition is $20 + 4 × $12, or $68, plus the $50 assessor’s fee for a structural addition; an $8,000 electrical job is $55 + 7 × $12, or $139.
Trade permits and who may pull them
Grand Chute splits the trades off the building permit. The building application tells applicants to use the subcontractor forms for electrical, plumbing and HVAC work, and each contractor files its own permit, so the general contractor’s list of subcontractors and credential numbers has to match what is filed.
- Electrical: priced by the value of the work; a service change is $30 or $50 and the service is inspected before the permanent meter is set.
- Plumbing: priced per fixture, with sewer laterals, storm laterals and water services at $30 each; the plumber supplies the water sizing calculation for a new home.
- HVAC: priced by value, or $40 for a straight furnace or air conditioner replacement; heat loss calculations come from the builder, architect or HVAC contractor.
- Fire sprinklers: a separate subcontractor application, $70 plus $22 per riser or floor for new systems in commercial buildings and $25 for alterations.
- Owner-occupants: the permit form carries an owner-occupant statement for those building their own homes without a Dwelling Contractor certification.
How to apply for a Grand Chute building permit
Make sure the property is in the town, not Appleton, and check its zoning district and whether it lies in the county shoreland area.
Rezonings, site plans and special exceptions follow the 2026 schedule: applications by 4:00 p.m. Monday, a Wednesday site plan meeting, then the Plan Commission and Town Board.
File the erosion control and stormwater application and financial guarantee, and the driveway and culvert permit.
Plans (two sets for a home, five for commercial), site plan, grade sheet, heat loss and water sizing figures, cost estimate and subcontractor list.
Submit the Uniform Building Permit Application to Community Development, with subcontractors filing their trade permits.
No permit is issued until every required document has been received.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
The town will not issue a building permit until it has every required document, so a missing grade sheet, heat loss calculation or notarized guarantee stops the file. Commercial projects also wait on state or E-Plan plan approval, and planning items move on a fixed calendar: under the 2026 schedule, an application in by September 21 reached the Plan Commission on October 20 and the Town Board on November 5. The schedule was revised at the January 20, 2026 Town Board meeting.
Inspections and occupancy in Grand Chute
Request inspections by phone at 920-832-1599 or by e-mail to Community Development staff, giving the permit number, name, phone, site address, the inspection type and when the work will be ready; allow 48 hours’ lead time. Any violation cited must be fixed within 30 days, and the owner must call for the re-inspection. The town’s list of required inspections, in construction order:
- Temporary power and water and sewer laterals: Public Works inspects the connection at the street, and Community Development inspects from the street onto the lot.
- Footing before concrete, foundation with drain tile, gravel and below-grade insulation, and underground plumbing under test.
- Frame and roof, electrical service before the meter, and plumbing, HVAC and electrical rough-ins.
- Insulation before wallboard, then the drainage plan and final grading inspection once lot corners are set.
- Final before occupancy.
Occupancy is not allowed until the final inspection is passed and a certificate of compliance is issued; the certificate of occupancy fee is $50 for a house and $75 for a duplex.
Wisconsin building code in Grand Chute
Grand Chute enforces the state Uniform Dwelling Code under its own DSPS delegation (municipal number 44-020) and handles commercial permits after state or contracted plan review. FEMA’s Community Status Book does not list the town separately; Outagamie County (community 550302) participates in the National Flood Insurance Program with maps effective January 20, 2016.
Wisconsin's Uniform Dwelling Code covers one- and two-family homes. Its Commercial Building Code covers public buildings, workplaces and buildings of three or more units. Local ordinances must conform to both. Wisconsin rules
Grand Chute permit search and official resources
Copies of permits, plans and inspection records are requested from the town under its open records policy, using the form on the Find a Form page; Community Development answers permit questions at 920-832-1599, and Plan Commission and Zoning Board of Appeals schedules are posted on its meeting dates page.
Want this handled start to finish?
Get a free quote →- Building permit and inspection requirements
- Community Development fee schedule 2026
- Uniform Building Permit Application
- Subcontractor permit application (electrical, plumbing, HVAC, sprinkler)
- Building permit requirements checklist
- Inspection requirements
- Community Development forms and applications
- Plan Commission and Zoning Board of Appeals dates
- 2026 Plan Commission and Town Board schedule
- Driveway and culvert permit (2026)
- Work in public right-of-way application
- Water, sewer and storm connection permit
- Fire Department pre-occupancy inspection application
- E-Plan Exam commercial plan submittal
- Community Development staff
- Open records request policy and form
- DSPS UDC delegated agents list
- FEMA Community Status Book, Wisconsin
Inspections are where schedules slip.
Get a free quote →Grand Chute building permit FAQs
Do I need a permit to re-roof in Grand Chute?
Yes. Re-roofing, new siding and fences each need a permit, at a flat $35 under the 2026 schedule.
Do replacement windows need a permit?
Not when the new windows or doors are a similar style and size; changing the openings or the structure does need one.
How much is a permit for a garage?
$20 plus $12 for every 100 square feet, the same rate as additions; a 600-square-foot garage is $92.
Who issues permits for my Appleton address?
If the parcel is in the Town of Grand Chute, the town’s Community Development Department does, even with an Appleton mailing address.
What does a new house pay in impact fees?
A $346 fire impact fee and a $400 park development fee for a single-family home; the fire impact fee is waived under 1,500 square feet of living area.
How much notice do inspectors need?
48 hours; call 920-832-1599 or e-mail staff with the permit number and the inspection type.
What happens if I start without a permit?
The town stops the work, charges triple the regular fee and can fine the owner for each day out of compliance.
Simplify Grand Chute permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Wisconsin. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Grand Chute sooner?
Let Alliance prepare, file, and track your Grand Chute permits while your crew stays on the job.
More Wisconsin permitting guides
Outagamie County
Read guide →Greenville
Read guide →Kaukauna
Read guide →Grant County Building Permit Guide
Read guide →Green Bay Building Permit Guide
Read guide →Green County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Grand Chute permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.