Skip to main content
Municipal GuideUtahNorth Salt Lake · Davis County

North Salt Lake, Utah Building Permit Guide

North Salt Lake’s Building Department issues building, electrical, plumbing and mechanical permits inside the city, all filed and tracked in City Inspect.

Authority: North Salt Lake Building DepartmentFiling: City InspectPhone: 801-335-8720
Authority
North Salt Lake Building DepartmentChief Building Official Cameron Wright
Apply / Intake
City Inspect$500 plan check deposit for a house
Inspections
Monday–ThursdayBooked in City Inspect, no same-day visits
2025 population
23,588U.S. Census Bureau estimate

North Salt Lake’s Building Department at 10 East Center Street issues building permits, including electrical, plumbing and mechanical work, and takes every application through City Inspect. A permit with no plan review costs $50.50 and is normally issued the next business day after payment, while a new house pays a $500 plan check deposit and a residential plan check fee of 50% of the permit fee under the fee schedule effective July 1, 2026.

What requires a building permit in North Salt Lake?

The City requires a building permit and inspection for all new construction, additions, basement finishes and remodeling, and for siding, re-roofing, window replacement and water heater or furnace replacement. Its design criteria add that most repairs and alterations need a building, plumbing, electrical or mechanical permit.

Building permit

  • New homes, townhomes and commercial buildings
  • Additions, remodels and basement finishes
  • Re-roofs, siding and window replacement
  • Water heater and furnace replacement, electrical and plumbing work
  • Accessory structures 200 sq ft or larger, or with power, plumbing or heat
  • Decks, retaining walls and solar
  • Demolition, after an asbestos inspection by a state-certified inspector

Land use permit or no permit

  • Sheds under 200 sq ft with no utilities: free land use permit
  • Accessory dwelling units, short-term rentals and fences: land use permits reviewed by the City Planner
  • Cosmetic work such as carpet, tile, paint and wallpaper: no permit

Who issues building permits in North Salt Lake?

The City’s Building Department reviews plans, issues permits and inspects construction inside North Salt Lake, including electrical, plumbing and mechanical work. Cameron Wright is the Chief Building Official. The City Engineer handles geologic hazard reviews in the Sensitive Lands Overlay Zone, street dumpster permits and engineering sign-off, and the City Planner reviews land use permits. Unincorporated Davis County is permitted by Davis County Community and Economic Development.

Short on time to read all of this?

Get a free quote →
North Salt Lake Building Department contact
DetailInformation
Office10 East Center Street, North Salt Lake, UT 84054
Phone801-335-8720; Building Permit Technician 801-335-8721
City Engineer (sensitive lands)801-335-8722
Chief Building OfficialCameron Wright
Apply, track and book inspectionsCity Inspect (nsl.cityinspect.com)
Land use permitspermits@nslcity.org

North Salt Lake permit types and approvals

Every application goes through City Inspect, where you also upload plans, follow plan review and request inspections. After submission, each reviewing department posts redlines, corrections or approvals, and you answer a correction by opening it and attaching a comment or revised document. Once all departments approve, the City emails the fees; pay them in the portal, by phone to the permit technician or in person, and the permit is emailed to you.

Applications and forms on the City’s Forms page:

  • New Residential SFD Permit Packet, and the New Residential Permit Application for basements, garages, electrical and mechanical work.
  • Residential Remodel and Commercial Remodel permit applications, and the New Commercial Permit Application.
  • Owner/Builder Certification Form, for an owner who is also the builder.
  • Pre-Construction Meeting Application for commercial and multi-family projects, and the Certificate of Occupancy Sign Off Sheet.
  • Land use permit forms for sheds, accessory dwelling units and residential or commercial fences, emailed to permits@nslcity.org.

North Salt Lake permit costs and fees

Fees are set by the City’s Comprehensive Fee Schedule, Resolution 2026-24R, approved June 16, 2026 and effective July 1, 2026. The building permit fee follows the most recent ICC Building Valuation Data, applied to the value of the work as the Building Official determines it from square-foot costs. Fees for plan-reviewed permits are set after review is complete.

Not sure this scope needs a permit?

Get a free quote →
North Salt Lake building fees (effective July 1, 2026)
ItemFee
Permit with no plan review (most roofing, mechanical, plumbing)$50 plus $0.50 state fee = $50.50
Re-roof, residential / commercial$50.50 / $151.50
Plan check, residential / commercial50% / 65% of the building permit fee
Duplicate residential plan within 1 year and the same code period20% of the building permit fee
Plan check deposit: house, duplex or townhome / solar$500 / $100
Plan check deposit, commercial75% of the estimated plan review fee
Re-inspection (charged at the second re-inspection)$50
Reactivating a permit up to 1 year after it expired$100
Construction bond, refundable$40 per linear foot of street frontage, $1,000 minimum
SWPPP inspection / violation bond, single-family lot$150 a year / $500 refundable
Impact and connection fees for a new single-family home
FeeAmount
Parks$2,200
Water impact, indoor$1,641
Water impact, outdoor$1,088 per 1,000 sq ft
Water meter connection, 3/4 inch / 1 inch$350 / $400

All development fees are due when the building permit is issued. Credit card payments carry a 2% service fee.

Rather talk it over?

Call 1-855-478-4290 →

Electrical, plumbing, mechanical and gas work

North Salt Lake’s Building Department issues electrical, plumbing and mechanical permits itself. Stand-alone mechanical and plumbing permits, such as a water heater or furnace replacement, usually need no plan review: they cost $50.50 and are normally issued the next business day after the fees are paid. Residential electrical and mechanical permits use the New Residential Permit Application, and commercial ones the Commercial Remodel Permit Application. A new house submittal must include a gas line drawing and Manual J and D calculations with the HVAC equipment and duct design.

Re-roofs follow the Building Official’s Re-roof and Roof Repair Policy (revised March 2026), which requires a final inspection of vents, flashings and drip edges and covers tear-off, recover limits and plank decking.

Application documents and plan review

For a new house, the residential checklist asks for:

  • A site plan with lot lines and dimensions, all permanent structures, drainage and grading, sewer and water tie-ins, and elevations and contours.
  • Construction drawings and footing and foundation plans, one set wet-stamped and signed, plus floor plans with electrical diagrams and elevations showing final grade.
  • Framing details and a diagram of each wall type, structural calculations and engineering packets.
  • A soils report and retaining wall engineering where they apply.
  • REScheck, Manual J and D, and the gas line drawing.
  • The $500 plan review deposit.

Design to the City’s criteria: 30-inch frost depth, roof snow loads of 30 to 46 psf by elevation (engineered design above 5,000 feet) and seismic category D-2 or E depending on the Wasatch Fault and soil. New commercial buildings, commercial additions or structural remodels, and nonstructural remodels over 3,000 sq ft need a Utah-licensed professional’s stamp. The City does not publish a plan review time, but says that attaching every required document speeds the application along.

Rather not deal with the building department?

Get a free quote →

How to apply in North Salt Lake: 6 steps

1. Check for sensitive lands

Homes usually east of Highway 89 may need a Geologic Hazard Investigation application, scoping meeting and geotechnical review before any permit; call the City Engineer.

2. Register in City Inspect

Create an account with the City’s registration link.

3. Apply and upload

Submit the application with every checklist document; pay the plan check deposit when asked.

4. Answer each department

Respond to redlines and corrections in the portal until all departments approve. In sensitive lands, upload the soils observation report after excavation.

5. Pay the fees

Pay through the portal, by phone at 801-335-8721 or in person; the permit is emailed once paid.

6. Book inspections

Request each inspection in City Inspect at least a day ahead.

North Salt Lake building inspections

Inspections are requested through your City Inspect account and are not available the same day; the City says most are done the next day, with some exceptions. Inspectors work Monday to Thursday, with morning (8:00 a.m. to noon) and afternoon (1:00 to 4:00 p.m.) windows; for a closer time estimate, call on the day. The permit in the portal lists the inspections your scope needs.

A $50 re-inspection fee applies when an inspection needs a second re-inspection for incomplete work or corrections. Every construction site must have a trash container and toilet facilities, and commercial projects close out with the Certificate of Occupancy Sign Off Sheet.

Local details for North Salt Lake projects

Sensitive Lands Overlay Zone: new homes, retaining walls, pools and sports courts there go through a geologic hazard review: site plan and planning approval, a scoping fee and bond, a scoping meeting, a geotechnical report reviewed for the City by GeoStrata, then a soils observation report after footing excavation before the permit is issued.

Street use: dumpsters and portable storage containers may sit in a City street for up to 14 days with a permit from City Engineering, and driveway approaches carry a $500 cash completion bond.

Want this handled start to finish?

Get a free quote →

Accessory dwelling units: basement and mother-in-law apartments and tiny homes need a land use permit as well as any building permit.

Utah building code

Utah adopts one construction code for the whole state; cities and counties enforce it, and any local amendments are set by the Legislature. Utah rules

Official North Salt Lake permitting resources

City sources:

Inspections are where schedules slip.

Get a free quote →

North Salt Lake building permit FAQs

How much is a building permit in North Salt Lake?

Simple permits with no plan review, such as most re-roofs and water heater or furnace replacements, are $50.50. Larger projects pay a fee based on ICC valuation data plus a plan check fee (50% residential, 65% commercial), with a $500 deposit for a new house.

Do I need a permit to replace my roof or windows?

Yes. Re-roofs, siding and window replacement all need a permit; a residential re-roof is $50.50.

Do I need a permit for a shed?

A shed of 200 sq ft or more, or any shed with power, plumbing or heat, needs a building permit. Smaller sheds need a free land use permit.

How do I schedule an inspection?

Request it in City Inspect. There are no same-day inspections, and inspectors work Monday to Thursday in morning or afternoon windows.

What if my lot is in the Sensitive Lands Overlay Zone?

File the Geologic Hazard Investigation application before the building permit and expect a scoping meeting and geotechnical review; the City Engineer is at 801-335-8722.

Can a homeowner pull a permit?

Yes. Include the Owner/Builder Certification Form with the application if you are both owner and builder.

Simplify North Salt Lake permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Utah. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in North Salt Lake sooner?

Let Alliance prepare, file, and track your North Salt Lake permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about North Salt Lake permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.