Building permits inside Orange city limits are issued by the Plans and Inspections Division of the City’s Planning and Community Development Department at 303 N. 8th Street, led by Building Official Marvin Benoit (409-988-7399). Applications and plans can be emailed to permits@orangetexas.gov, mailed or brought in. A new house costs $0.40 per square foot of habitable area plus $0.20 per square foot of garage and porch, electricians, plumbers and HVAC contractors pull their own permits, and inspections are called in by 5:00 p.m. the business day before.
What requires a permit in Orange?
The City’s notice to contractors says permits are required for all building construction and for electrical, plumbing, mechanical and gas repairs inside city limits. The building permit application lists these permit types:
Building permit
- New construction, add-ons and remodels
- Garages, carports and storage or accessory buildings
- Re-roofing, siding and window replacement
- Fences and concrete flatwork
- Foundation repair and house leveling
- Swimming pools
- Manufactured, mobile and modular home placement
- Demolition and moving a building
- Fire suppression systems and irrigation
- Certificate of Occupancy
Separate permits
- Electrical, plumbing, gas and mechanical permits, pulled by each trade
- Floodplain development permit for clearing or changing the ground
- Signs and tents
- Tree cutting or trimming
- Certificate of Appropriateness in a historic district
- Plat review and lot consolidation
New construction, additions, fences, manufactured or mobile home placements, storage and accessory buildings and pools all need a site plan drawn to scale with the application, and every remodel needs a written scope of work. A retailer or installer who delivers a storage building to a site without a posted permit is charged $100.
Short on time to read all of this?
Get a free quote →Orange building department: who handles permitting
The Plans and Inspections Division reviews and approves site plans and construction plans, explains the codes to builders and inspects construction for code and site plan compliance. The Building Official also runs the City’s floodplain program. Zoning questions go to the Director of Planning and Community Development, and water and sewer taps to Public Works. Plats and development in unincorporated Orange County are handled by the Orange County Engineer (409-920-2414), and drainage plans also involve the Orange County Drainage District (409-745-3225).
| Detail | Information |
|---|---|
| Division | Plans and Inspections, Planning and Community Development |
| Office | 303 N. 8th Street, Orange, TX 77630 |
| P.O. Box 520, Orange, TX 77631 | |
| permits@orangetexas.gov | |
| Building Official | Marvin Benoit, 409-988-7399 |
| Permits and inspection requests | 409-883-1034; Inspections office 409-883-1070 |
| Water and sewer taps | Public Works, 409-883-1082 |
Orange applications, bonds and contractor rules
Send the Building Permit Application (current form effective May 1, 2026) with plans by email, by mail to P.O. Box 520, or in person at 303 N. 8th Street. Fees can be paid in person, by mail, or by credit card over the phone with a 2.5% processing fee. A permit is good for 180 days.
- Building and demolition contractors show a driver’s licence and post a $10,000 contractor’s surety bond issued to the City; demolition contractors also file a certificate of insurance naming the City.
- Electricians, plumbers and mechanical contractors register with the City and keep their state licence (master electrician and electrical contractor, master plumber or irrigator, or state air conditioning licence), a $300,000 general liability certificate and photo ID on file at the Inspections office.
- Fire alarm contractors need a state master fire alarm installer licence and insurance naming the City.
Other forms on the City’s permit page include the Floodplain Development Permit Application, Building Relocation and Moving Permit, the four Certificate of Appropriateness applications for historic districts, Board of Adjustment, Plat Review, Lot Consolidation, Sign, Tent and Tree Cutting applications, and 2026 diagrams of building setbacks and base flood elevation.
Orange permit cost
Fees come from the City’s Permit Fee Schedule effective January 9, 2024. Starting work before the permit is issued doubles the fee.
Not sure this scope needs a permit?
Get a free quote →| Project | Fee |
|---|---|
| New home, duplex or townhome unit | $0.40 per sq ft habitable; $0.20 per sq ft garage, carport, covered patio |
| Residential plan review | $10 |
| Addition | $0.40 per sq ft, $35 minimum |
| Remodel | $0.30 per sq ft remodelled, $35 minimum |
| Accessory storage building | $0.20 per sq ft, $25 minimum |
| Detached garage / detached carport | $0.25 / $0.15 per sq ft, $25 minimum |
| Re-roof | $40 |
| Windows | $35 plus $2 per window |
| Fence or siding | $35 each |
| In-ground / above-ground pool | $250 / $50 |
| Flatwork concrete | $25 |
| House leveling / elevating a house | $35 / $50 |
| Manufactured / modular home placement | $100 / $200 |
| Demolition, residential / non-residential | $40 / $100 |
| Re-inspection | $30 |
For example, a house with 2,000 sq ft of habitable space and a 500 sq ft attached garage pays $800 plus $100, or $900, plus the $10 plan review fee, before trade permits.
Commercial and multifamily permits use a valuation table: $25 per inspection for work of $1,000 or less; $25 for the first $1,000 plus $6 per extra $1,000 up to $50,000; $275 plus $5 per $1,000 to $100,000; $475 plus $4 per $1,000 to $500,000; and $1,675 plus $3 per $1,000 above that. Commercial plan review adds half the building permit fee. A Certificate of Occupancy is free with a building permit and $30 for a change of occupant in an existing building. A floodplain development permit for clearing or regrading land costs $45 per acre.
Rather talk it over?
Call 1-855-478-4290 →Orange trade permits
Each trade pulls its own permit, separate from the general contractor’s building permit. A homeowner whose homestead exemption is confirmed by the Orange County Appraisal District may apply for electrical, plumbing, gas or mechanical permits on that home; commercial, rental and leased property needs a state-licensed contractor to apply and do the work.
| Permit | Fee |
|---|---|
| Electrical, new single-family or duplex unit | $55 |
| Electrical, base permit (one service and 10 outlets) | $20, plus $0.50 per extra device |
| Electrical, rewire / generator or solar | $45 / $40 |
| Plumbing, new single-family unit | $50 |
| Plumbing, base permit | $20 plus $3 per fixture, trap, sewer line or water heater |
| Residential irrigation | $30 |
| Mechanical, new or full changeout / partial | $70 / $35 |
| Gas, residential | $15 plus $3 per extra opening |
| Trade re-inspection | $30 |
Rather not deal with the building department?
Get a free quote →Orange permit application: how to apply step by step
Confirm the zoning district and whether the lot is in a flood hazard area or floodway; a pre-development meeting with City staff can help on larger projects.
In a historic district, submit a Certificate of Appropriateness for review by the Historic Preservation Commission before the building permit.
Send the Building Permit Application with a scaled site plan, plans, an elevation certificate in a flood zone and, for commercial work over $50,000, the TDLR architectural barriers registration number.
Electrical, plumbing, gas and mechanical contractors file their own permits.
Once the Building Official approves the plans, pay the fees; pay the water and sewer tap at Public Works for new service.
Call each inspection in by 5:00 p.m. the business day before, through the final inspection and Certificate of Occupancy.
Inspections in Orange
Each contractor calls its own inspections to the Plans and Inspections office at 409-883-1034 by 5:00 p.m. one business day ahead. A $30 re-inspection fee is charged when work fails or is not ready.
- Plumbing: soils rough-in with all under-slab piping filled to a 5-foot head; yard lines for water, sewer and gas before they are covered; stack-out, with a water test and preliminary gas test on two-storey houses; and a final with a final gas test. Covered work gets an automatic red tag.
- Electrical: temporary pole, rough-in before insulation, meter loop, and final.
- Mechanical: rough-in with plenums, ducts and vents in place, and final.
- Building: rough-in before improvements are covered, then final.
Nobody may occupy a building before the final inspection and Certificate of Occupancy. The electric meter is installed before the final so the inspector can test lights and equipment, and a meter does not mean the building may be occupied.
Local Orange details
Flood elevation: the Building Official administers the floodplain program, and every job in a special flood hazard area needs an elevation certificate. The City’s 2026 base flood elevation diagram sets a 1-foot freeboard requirement, with the floor at base flood elevation plus 1 foot; the older Development Guide says at or above base flood elevation, so build to the newer 1-foot rule. No building is allowed on the part of a lot inside a floodway.
Want this handled start to finish?
Get a free quote →Historic districts: new buildings, accessory structures, fences, exterior changes and demolitions in a historic district need a Certificate of Appropriateness, which goes to the Historic Preservation Commission; the district also controls colours, roof styles and architectural features.
Site plans: multifamily projects of 3 or more units, large commercial and industrial projects submit two 24-by-36-inch site plan copies, or a PDF by email, to the Building Official.
Texas building code
Texas has no single statewide building code: state law makes the International Residential Code the base code for homes in cities and the International Building Code the base for commercial buildings, with each city choosing the edition and its own amendments, while the National Electrical Code and the energy code apply statewide. Outside city limits most counties issue no building permits for homes. Texas building code rules
Official Orange permit resources
- Orange Plans and Inspections Division
- Orange permits and applications
- Building Permit Application (May 2026)
- Permit Fee Schedule (January 2024)
- Notice to Contractors: licence and bond requirements
- Orange floodplain administration
- Base Flood Elevation diagram (2026)
- Orange Development Guide
Inspections are where schedules slip.
Get a free quote →Frequently asked questions
How much is a building permit for a new house in Orange?
$0.40 per square foot of habitable area and $0.20 per square foot of garage, carport or covered patio, plus a $10 plan review fee. A 2,000 sq ft house with a 500 sq ft garage pays $910.
Do I need a permit for a roof, fence or shed in Orange?
Yes. A re-roof is $40, a fence $35 and an accessory storage building $0.20 per square foot with a $25 minimum, and fences and sheds need a scaled site plan.
Can a homeowner pull trade permits?
Yes, for a home with a homestead exemption on record at the Orange County Appraisal District. Rental, leased and commercial property needs a state-licensed contractor.
How do I schedule an inspection?
Call 409-883-1034 by 5:00 p.m. the business day before. Failed or not-ready inspections cost $30 to repeat.
How high must a house be built in an Orange flood zone?
The City’s 2026 diagram requires the floor at 1 foot above base flood elevation, shown on an elevation certificate.
What codes does Orange use?
The 2021 International Codes, including the residential, building, fire, energy, plumbing, mechanical, fuel gas, existing building, property maintenance and swimming pool codes, and the 2023 National Electrical Code.
Simplify Orange permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Texas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Orange sooner?
Let Alliance prepare, file, and track your Orange permits while your crew stays on the job.
More Texas permitting guides
This guide is provided by Alliance Permitting for general information about Orange permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.