Midland issues building permits through the Development Services Department, running applications and inspection scheduling on the PermitMidland portal. A residential building permit is required for new construction, additions, remodeling, repairs, and detached accessory buildings, and a commercial permit is required for all work performed on commercial structures.
The contractor requirement here is stricter than most Texas cities. To obtain a permit you must be a licensed and bonded contractor registered with the City of Midland — bonding is named alongside licensing, and city registration on top of both. Most construction projects require one.
The city also flags a jurisdiction check explicitly: check the jurisdiction and zoning to determine whether your property is located within the Extraterritorial Jurisdiction or the city limits. And the property must be platted and zoned for the proposed use before a residential permit will issue.
Applies inside Midland city limits, with ETJ considerations beyond them. Odessa and the surrounding Permian Basin municipalities permit independently, and unincorporated Midland County runs its own Public Works permitting. Confirm both jurisdiction and zoning before filing.
Licensed and bonded and registered. Midland requires all three to obtain a permit — a licensed and bonded contractor registered with the city. That is a higher bar than most Texas jurisdictions, where state licensure plus city registration is the norm, and it is the item most likely to block a contractor arriving from elsewhere in the state.
What requires a permit in Midland?
Midland requires a residential building permit for new construction, additions, remodeling, repairs, and detached accessory buildings, and a commercial permit for all work performed on commercial structures. Only the property owner or the owner’s licensed contractor can obtain a building permit.
The property must be platted and zoned for the proposed use. On residential work the city states plainly that you must verify the zoning of your land allows for residential use — a check that belongs before design, not at application.
Permit required
- Residential new construction, additions, remodeling, and repairs
- Detached accessory buildings
- All work performed on commercial structures
- Reroofing and exterior envelope work
- Electrical, plumbing, and mechanical work
- Retaining walls above the applicable height threshold
- Pools, with barrier requirements
- Change of occupancy or use; demolition
Typically exempt
- Cosmetic updates without electrical or plumbing changes
- Replacing a light fixture or outlet
- Freestanding decks not more than 30 inches above grade, per IRC R105.2
- Standard backyard fences under the applicable height threshold
Midland building department: who handles permitting
The Development Services Department handles permitting and inspections, with Code Administration describing its mission as protecting the health, safety, and public welfare of the city. Inspections are scheduled through PermitMidland or on 432-685-7390.
Midland enforces a mixed set of adopted editions — the 2018 IBC, IRC, IMC, and IPC, the 2015 IECC and IFC, and the 2023 NEC. The electrical code is considerably newer than the building codes, which is worth noting when a designer assumes a single edition year applies across the set.
| Detail | Information |
|---|---|
| Authority | City of Midland Development Services Department |
| Phone | 432-685-7390 — permitting and inspections |
| Online portal | PermitMidland — applications and inspection scheduling |
| Contractor requirement | Licensed and bonded, registered with the City of Midland |
| Adopted codes | 2018 IBC, IRC, IMC, IPC; 2015 IECC and IFC; 2023 NEC |
| Jurisdiction check | Confirm whether the property is in the ETJ or the city limits |
| Residential prerequisite | Property must be platted and zoned for residential use |
| Who may permit | Only the property owner or the owner’s licensed contractor |
Note the split edition years. Midland enforces 2018 building, residential, mechanical, and plumbing codes alongside the 2015 energy and fire codes and the 2023 NEC — so an electrical design has to be considerably more current than the structural one. Confirm the set before drawing.
Midland permits: record types and what each covers
A building permit is one record among many. Development Services issues work under separate record types inside PermitMidland, and filing under the wrong one is a rejection rather than a correction. Midland puts two gates ahead of the record type: a licensed, bonded, and city-registered contractor, and a property that is platted and zoned for the proposed use.
Residential permit types
| Permit type | What triggers it | Review path | Fee basis |
|---|---|---|---|
| New construction | New dwellings, additions, and accessory structures over the exempt threshold | Full plan review (structural, energy, zoning) | Valuation-based |
| Renovation / alteration | Structural or load-bearing changes, layout changes, substantial repair | Plan review scaled to scope | Valuation-based |
| Reroof | Roof covering replacement and most major roof repair | Product approval review; dry-in and nail-off inspections | Valuation or squares |
| Solar photovoltaic | Rooftop or ground-mount PV installation or replacement | Structural plus electrical review | Flat or system-size based |
| Solar thermal | Passive water heating or pool heating systems | Plumbing and structural review | Flat or per-permit minimum |
| Electrical | Service changes, panel upgrades, new circuits, most wiring alterations | Trade review; filed against the building permit | Per-permit minimum or per-device |
| Plumbing | New piping, repipes, water heaters, fixtures, gas piping | Trade review; filed against the building permit | Per-permit minimum or per-fixture |
| Mechanical / HVAC | Changeouts that are not like-for-like, ductwork, refrigeration | Trade review; filed against the building permit | Per-permit minimum or per-unit |
| Windows and doors | Replacement units and opening protection | Product approval review for wind-borne debris | Valuation or per-opening |
| Pool and spa | In-ground and above-ground pools, spas, barrier and enclosure work | Plan review plus barrier and electrical bonding | Valuation-based |
| Fence and accessory | Fences, sheds, decks, and carports over the exempt threshold | Zoning plus structural where applicable | Flat or valuation-based |
| Demolition | Full or partial demolition of a structure | Utility disconnect verification required | Flat |
Commercial permit types
| Permit type | What triggers it | Review path | Fee basis |
|---|---|---|---|
| New construction | Ground-up commercial, industrial, and multifamily | Full multi-discipline plan review | Valuation-based |
| Tenant improvement | Interior build-outs and suite fit-ups | Plan review across affected disciplines | Valuation-based |
| Renovation / alteration | Structural, envelope, or system changes to an existing building | Plan review scaled to scope | Valuation-based |
| Change of use | Converting a building from one occupancy classification to another | Zoning, life-safety, and accessibility review | Valuation or flat |
| Reroof | Commercial roof covering replacement | Product approval review plus fire review where applicable | Valuation or squares |
| Solar photovoltaic | Commercial rooftop, carport, and ground-mount PV | Structural, electrical, and often fire review | Valuation or system-size based |
| Electrical | Service, distribution, and branch circuit work | Trade review | Valuation or per-device |
| Plumbing | Supply, waste, vent, and gas systems | Trade review | Valuation or per-fixture |
| Mechanical / HVAC | Rooftop units, ductwork, exhaust, and refrigeration | Trade review | Valuation or per-unit |
| Fire protection | Sprinkler, standpipe, alarm, and suppression systems | Fire prevention plan review | Valuation or per-device |
| Sign | Wall, monument, and illuminated signage | Zoning plus electrical where illuminated | Flat or per-sign |
| Demolition | Full or partial commercial demolition | Utility disconnect and environmental clearance | Flat or valuation-based |
Residential
- Single-discipline review in most cases
- Master permit with trades filed against it
- Owner-builder route exists but carries statutory affidavits
- Product approval drives roofing and opening protection
Commercial — multi-discipline
- Concurrent review across building, fire, and zoning
- Signed and sealed plans across every affected discipline
- Accessibility and life-safety review attach to change of use
- Impact and concurrency fees can apply on top of permit fees
Solar permits in Midland
Solar is permitted as its own record type in most Texas jurisdictions rather than rolled into a general building permit, and residential and commercial photovoltaic are usually separate records with different document sets. Solar thermal — passive water and pool heating — is a third, distinct record.
A photovoltaic submittal is reviewed on two tracks at once: structural (roof load path, attachment spacing, uplift) and electrical (conductor sizing, rapid shutdown, point of interconnection). A single-line diagram and a signed and sealed structural attachment detail are the two attachments most often missing on a first submittal.
Texas HOA law is narrower than most installers assume. Under Tex. Prop. Code §202.010 a property owners' association cannot prohibit a solar energy device outright, and any dedicatory provision that does is void — but the statute expressly preserves the association's right to require prior architectural approval and to impose placement and appearance conditions. Approval cannot be unreasonably withheld, and conditions that cut estimated production materially are not enforceable. Practically: get the HOA submittal moving in parallel with the permit rather than treating it as optional.
Texas SB 1202 changed this materially on September 1, 2025. Codified at Tex. Local Gov't Code §247.0025, it lets authorized third parties — licensed engineers, electrical inspectors, and Texas master electricians — perform the plan review and inspections for a home backup power installation instead of the jurisdiction. The definition covers generators, energy storage systems, and associated equipment serving a one- or two-family dwelling at 600 volts or less. Construction may begin on submission of the notice, the third party has 15 days to report results, and the regulatory authority must issue the approval on a short statutory clock. Jurisdictions that process work this way do not review or inspect it, and responsibility for code compliance sits with the third-party reviewer and the contractor of record. Note the boundary: it is a backup-power provision, so a straight grid-tied photovoltaic array with no storage is not automatically inside it, and separate electrical or plumbing permits are still generally required for service release. Confirm how Midland is administering SB 1202 before assuming either path.
Utility interconnection runs parallel to the building permit, not inside it. Permission to Operate is issued by the utility after the final electrical inspection clears, and in deregulated territory the interconnecting utility is the wires company rather than the retail provider.
Roofing permits in Midland
A roof covering replacement requires a permit in most Texas municipalities. Repairs below the local threshold may not, but the threshold is scope-specific and set locally — confirming it with the building department before tear-off is cheaper than an after-the-fact permit.
Texas has no statewide product approval system, so there is no central listing to check a roofing product against. Compliance runs against the code edition the jurisdiction has actually adopted and the local amendments layered on top of it. Those amendments are where the binding requirements live, and they change from city to city inside the same county.
Texas Department of Insurance windstorm certification — the WPI-8 process — applies only in the designated seaward counties along the Gulf. Midland is not a seaward county, so WPI-8 certification does not attach here and roofing contractors licensed for inland work do not need TDI appointment for this jurisdiction.
Hail is the governing weather risk across most of inland Texas, not wind. Impact-resistant Class 3 and Class 4 shingles carry insurance premium credits from most carriers, and under Tex. Prop. Code §202.011 a property owners' association cannot prohibit shingles that are wind or hail resistant, or that improve energy efficiency, provided they otherwise match the roof's appearance requirements.
Reroof inspections are typically sequenced by the jurisdiction, commonly a decking or nail-off inspection before the covering goes down and a final afterward. Covering the deck before the required intermediate inspection means tearing it back open.
Texas has no statewide building code and no statewide general contractor license. The code edition and the amendments that bind your submittal are adopted locally, and contractor registration with the jurisdiction is frequently the gate that has to clear before a record type can even be filed. On commercial work, projects over the statutory threshold also register separately with TDLR for Texas Accessibility Standards review, which runs outside the building permit entirely.
Midland sits in the Permian Basin at roughly 105 to 115 mph ultimate design wind speed under the adopted code, far from the designated catastrophe area and outside any TDI windstorm requirement. Hail and blowing dust are the governing weather exposures, and impact-resistant roofing is an economic decision here rather than a code mandate.
Midland permit cost and fees
Midland permit fees are set by the city and vary by project type and valuation, paid through the PermitMidland portal alongside the application.
Budget the bonding requirement if you are a contractor new to the city. Licensed and bonded registration is a precondition of permitting here, and arranging a bond is not a same-day step.
| Fee component | How it works |
|---|---|
| Building permit | Varies by project type and valuation |
| Contractor registration | Licensed and bonded registration with the city required |
| Trade permits (E / P / M) | Separate fee per trade, filed by the registered contractor |
| Retaining walls | Permitted above the applicable height; engineering review may be required |
| Pools | Barrier and safety requirements apply alongside the permit |
| Re-inspection | Charged when a checkpoint fails and is re-requested |
Want a precise number for a specific Midland project? Send us the scope and valuation and we’ll return a fee estimate alongside a filing timeline against the adopted editions.
Midland trade permits
Electrical, plumbing, and mechanical work each need their own permit pulled by a licensed and bonded contractor registered with the City of Midland. Electrical work runs under the 2023 NEC — a newer edition than the 2018 building codes alongside it.
Electrical
Service and panel work, new circuits, solar PV, and EV charging under the 2023 NEC — performed by a TDLR-licensed electrician registered and bonded with the city.
Plumbing
New plumbing, repipes, water heaters, fixtures, and gas piping under the 2018 IPC — performed by a TSBPE-licensed plumber.
Mechanical / HVAC
Installations, changeouts, ductwork, and venting under the 2018 IMC, with the 2015 IECC governing energy compliance.
Specialty
Retaining walls above the applicable height, pools with barrier requirements, fences, and accessory buildings each run their own path.
Midland permit application: how to apply step by step
Determine whether the property is within the Extraterritorial Jurisdiction or the city limits, and confirm zoning allows the proposed use.
A residential permit requires the property to be platted and zoned for residential use.
To obtain a permit you must be a licensed and bonded contractor registered with the City of Midland. Only the owner or the owner’s licensed contractor can pull the permit.
2018 IBC, IRC, IMC, and IPC; 2015 IECC and IFC; 2023 NEC. The electrical edition is newer than the rest.
Create the account and file the application with the plan set and supporting documents.
Schedule inspections through PermitMidland or on 432-685-7390, and clear the sequence to final.
Inspections in Midland
Development Services performs construction inspections against the adopted codes, with inspections scheduled through the PermitMidland portal or on 432-685-7390 once the permit is issued and work reaches an inspection milestone.
Because Midland enforces a mixed set of edition years, confirm which edition governs a given inspection checkpoint — electrical runs under the 2023 NEC while the building, mechanical, and plumbing codes are 2018 and the energy code is 2015.
Keep the permit posted and approved plans on site, and address correction notices before requesting a re-inspection.
Midland permit search and official resources
- City of Midland — building permits
- Midland — permitting and inspections
- Midland — residential permitting
- Texas Department of Licensing and Regulation
- Texas State Board of Plumbing Examiners
Frequently asked questions
Who issues building permits in Midland?
City of Midland Development Services Department issues building permits for everything inside Midland city limits, handling plan review, permit issuance, and construction inspections. Work outside the city limits falls to Midland County, and Texas counties have sharply limited building authority in unincorporated areas.
How do I get a permit in Midland?
Confirm the scope triggers a permit and that zoning allows it, prepare the plan set and site plan, file through PermitMidland with contractor licensure in place, respond to plan review comments, pay fees and take issuance, then run the inspection sequence through final. Contractor credentialing is the step most often missed and it blocks everything downstream.
What codes apply in Midland?
Texas has no mandatory statewide building code. Municipalities adopt and amend model codes themselves, so Midland enforces 2018 IBC/IRC/IMC/IPC, 2015 IECC and IFC, 2023 NEC. The local amendments are where the binding requirements live, and they differ from neighboring cities working off the same model code. Confirm the current adopted editions with the department before designing to a specific one.
What does Midland require of contractors?
More than most Texas cities. To obtain a permit you must be a licensed and bonded contractor registered with the City of Midland — licensure, bonding, and city registration together. Most construction projects require one, and only the property owner or the owner’s licensed contractor can obtain a building permit. Arrange the bond and registration before bidding rather than after winning the work.
Which codes does Midland enforce?
A mixed set of edition years: the 2018 International Building, Residential, Mechanical, and Plumbing Codes, the 2015 International Energy Conservation Code and International Fire Code, and the 2023 National Electrical Code. The electrical edition is substantially newer than the rest, which catches designers who assume one edition year applies across the whole set. Confirm the current adopted editions with Development Services before drawing.
Is my Midland property in the city limits or the ETJ?
The city asks you to check this explicitly before applying — confirm the jurisdiction and zoning to determine whether the property is located within the Extraterritorial Jurisdiction or the city limits. The answer affects which requirements apply and whether a city permit is the right instrument at all. Separately, unincorporated Midland County administers its own permitting through Public Works, which is a different process again.
Do I need a permit to install solar panels in Midland?
Yes. Photovoltaic installations in Midland are permitted under a dedicated solar record type reviewed on both a structural and an electrical track. Solar thermal — passive water and pool heating — is a separate record. Under Tex. Prop. Code §202.010 a homeowners' association cannot ban a solar energy device outright, but it may still require prior architectural approval and impose reasonable placement conditions, so run the HOA submittal alongside the permit. Since September 1, 2025, Tex. Local Gov't Code §247.0025 (SB 1202) also permits third-party plan review and inspection of home backup power installations — generators and energy storage for one- and two-family dwellings at 600 volts or less — in place of jurisdiction review. Utility interconnection and Permission to Operate still run in parallel.
Does a roof replacement require a permit in Midland?
Yes, in most cases. A roof covering replacement requires a permit in most Texas municipalities including Midland, though minor repairs can fall below the local threshold. Texas has no statewide product approval system and no central product listing, so compliance runs against the locally adopted code edition and its local amendments. Hail rather than wind is the governing risk inland, and Tex. Prop. Code §202.011 bars an HOA from prohibiting wind or hail resistant shingles.
What is the difference between a residential and a commercial permit in Midland?
Residential work is generally a single-discipline review filed as a master permit with trades filed against it. Commercial work in Midland runs concurrent review across building, fire, and zoning, requires signed and sealed plans for every affected discipline, and can carry impact and concurrency fees on top of permit fees. Change of use adds accessibility and life-safety review.
Do trade permits need to be pulled separately in Midland?
Yes in most cases. Electrical, plumbing, and mechanical work is permitted separately by the licensed contractor for each trade and filed against the master building permit. Each trade permit carries its own fee and its own inspection sequence.
What happens if I file under the wrong permit type in Midland?
The application is rejected rather than corrected. Midland Permits and Licensing closes the record, the filing is resubmitted under the correct record type, and the review clock restarts from zero. Confirming the record type before filing is the cheapest step in the entire process.
Can I apply for all Midland permit types online?
Yes. PermitMidland handles permit applications and inspection scheduling, and inspections can also be scheduled on 432-685-7390. Create the account before you need it, and note that the licensed and bonded contractor registration must be in place before a permit can be obtained — the portal does not substitute for that credentialing step.
Simplify Midland permitting with Alliance Permitting
A licensed-and-bonded-and-registered contractor requirement, a platting and zoning prerequisite on residential work, an ETJ question the city flags itself, and adopted editions spanning 2015 to 2023 — Midland front loads more than most Texas cities. Alliance Permitting is a permit expediter for Midland: we clear the credentialing and zoning gates before the application moves.
Trusted by leading builders and brands — including Dream Finders Homes, Tesla, Verizon, Hyatt, and Sunnova.
Contractors and builders choose Alliance for Midland because we deliver:
- Local expertise — we know Midland’s bonding requirement, the mixed adopted editions, and the ETJ check the city asks for.
- Complete oversight — track every permit and inspection across all your jobs in one place.
- Error-free submissions — AI pre-checks plus expert review catch issues before they become correction cycles.
Alliance Permitting is a permit documentation and submission company: we prepare your paperwork, file it correctly, and coordinate with the authority having jurisdiction through issuance. We are not a contractor and do not perform licensed plan review or inspections; that work stays with your team and the jurisdiction.
Ready to break ground in Midland sooner?
Let Alliance prepare, file, and track your Midland permits while you stay focused on building. Get a free, no-obligation quote today.
More Texas permitting guides
This guide is provided by Alliance Permitting for general informational purposes and reflects publicly available information believed accurate as of July 2026. Permit requirements, fees, and processes change; always confirm current details with City of Midland Development Services Department before filing. This is not legal advice.