Kleberg County does not issue building permits or enforce a building code outside city limits. In the unincorporated county the approvals that apply are a septic (OSSF) permit, issued for the county by the City of Kingsville Health Department for $235, a rural 911 address from the county, and the county’s floodplain sign-off. Inside Kingsville, the City’s Building Services Division issues all building and trade permits.
What approvals apply in unincorporated Kleberg County?
The county’s 2024 Hazard Mitigation Action Plan states that the county defers to the State of Texas on building codes and has no code enforcement in place, so there is no county plan review, building permit or building inspection for a house or barn outside the cities. What a rural owner does need:
County approvals
- A septic (on-site sewage facility) permit for any new or replaced system, through the Kingsville Health Department as the county’s designated representative
- A rural 911 address from the county Addressing Coordinator
- A floodplain building permit, which the rural address form says is required when you build on the property
- Subdivision approval inside Kingsville’s extraterritorial jurisdiction (see below)
No county permit
- Building, framing or structural review
- Electrical, plumbing or mechanical permits
- Building inspections or certificates of occupancy
Short on time to read all of this?
Get a free quote →The county takes part in the National Flood Insurance Program, but the same plan notes that it has not yet adopted a flood damage prevention ordinance and lists actions to address that. The plan counts three repetitive flood-loss homes in the unincorporated county.
Who issues permits in Kleberg County?
The Census lists two cities in Kleberg County. Each issues its own building permits; the county issues none.
| Area or permit | Issued by | Contact |
|---|---|---|
| Kingsville (pop. 24,687) | City of Kingsville Planning & Development Services, Building Services Division: building, electrical, plumbing, mechanical and gas permits and inspections | 410 W. King, Kingsville; 361-595-8019 |
| Corpus Christi (the small part of the city that lies in Kleberg County) | City of Corpus Christi Development Services, through its online Dynamic Portal | Online Dynamic Portal (address search shows whether a parcel is in city limits) |
| Septic systems, whole county including the cities | City of Kingsville Health Department, acting as Kleberg County’s designated representative | 3421 N. FM 1355 (mail: P.O. Box 1458), Kingsville; 361-592-3324 |
| Floodplain questions | Kleberg County Flood Plain Management Coordinator | 361-595-8527 |
| Rural addresses | Kleberg County 911 Addressing Coordinator | 700 E. Kleberg Ave., Kingsville, TX 78363; 361-595-8593 |
| County Judge | Kleberg County Commissioners Court | 361-595-8585 |
Kingsville’s subdivision regulations apply up to 2 miles beyond its city limits, in its extraterritorial jurisdiction (ETJ). Dividing land there means platting under the City’s rules, and the City’s drainage design guide applies, with the stricter of its criteria and those of Kleberg County Drainage District No. 1 or TxDOT governing. The City’s building code itself applies within its corporate limits.
Not sure this scope needs a permit?
Get a free quote →Septic permits for rural Kleberg County
The City of Kingsville Health Department reviews septic applications for Kleberg County under rules adopted by the Commissioners Court; TCEQ lists the county as the authorized agent for the entire county, Kingsville included, with the program run by the City’s Environmental Health staff. Its permit sheet sets one fee, $235, for every on-site sewage facility.
- A professional engineer or registered site evaluator does the required soil and site evaluation.
- Planning materials are prepared by an appropriate designer; proprietary and non-standard systems need a registered sanitarian or professional engineer, and TCEQ staff in Austin may review non-standard plans.
- The application goes in the property owner’s name with the planning materials, the site and soil evaluation, the signed form and directions to the site.
- Once approved, an Authorization to Construct is issued, valid for one year.
- The installation must be inspected before it is covered. The permit sheet asks for at least 5 working days’ notice; the Health Department’s web page says 48 working hours.
- After a passed inspection the permit is mailed to the owner.
Electrical, plumbing and mechanical work outside the cities has no county permit; inside Kingsville, each licensed trade contractor buys a separate City permit.
Rather talk it over?
Call 1-855-478-4290 →Building on rural land in Kleberg County: the steps
Check whether the parcel is inside Kingsville, inside Corpus Christi’s limits, or in the unincorporated county, and whether it lies within 2 miles of Kingsville’s limits.
In Kingsville’s ETJ, follow the City’s subdivision and drainage rules before lots are sold or built on.
Call the Flood Plain Management Coordinator at 361-595-8527 about the flood zone and the floodplain building permit.
Hire a site evaluator or engineer, then apply to the Kingsville Health Department with the $235 fee.
File the Rural Address Application with the legal description from your tax bill and directions to the site.
Call the Health Department before covering the system; the permit is mailed once it passes.
Inspections in the unincorporated county
With no county building code, the only county-side inspection is the septic installation check by the Health Department’s designated representative before the system is covered. Inside Kingsville, the City’s Building Services Division inspects footings, framing, trades and finals, and bills each inspection separately.
For the rural address, the form asks which side of the road (north, south, east or west) the address will be on, whether the driveway is shared and with which address, and the distance to the nearest addresses and roads.
Rather not deal with the Kleberg County building department?
Get a free quote →Texas building code
Texas has no single statewide building code: state law makes the International Residential Code the base code for homes in cities and the International Building Code the base for commercial buildings, with each city choosing the edition and its own amendments, while the National Electrical Code and the energy code apply statewide. Outside city limits most counties issue no building permits for homes. Texas building code rules
Kleberg County official permit resources
- Kleberg County Officials Directory
- Kleberg County Emergency Management / 9-1-1 Addressing
- Kleberg County Rural Address Application Form
- Kleberg County 2024 Hazard Mitigation Action Plan Update
- City of Kingsville Health Department: On-Site Sewage Facilities
- How to obtain an OSSF permit (Kingsville Health Department / Kleberg County)
- City of Kingsville Planning & Development Services
- City of Kingsville subdivision regulations (ETJ)
- City of Corpus Christi Development Services
- TCEQ: Getting a Septic Permit
Want this handled start to finish?
Get a free quote →Kleberg County permit FAQ
Do I need a building permit to build a house in unincorporated Kleberg County?
No county building permit exists; the county enforces no building code. You still need a septic permit, a rural address and the floodplain building permit the county’s address form refers to.
Who issues septic permits in Kleberg County?
The City of Kingsville Health Department, as Kleberg County’s designated representative. The fee is $235 for any on-site sewage facility; call 361-592-3324.
How long is a septic Authorization to Construct good for?
One year from the date it is issued.
How do I get a rural address in Kleberg County?
Send the Rural Address Application to the 911 Addressing Coordinator at the courthouse, 700 E. Kleberg Ave. (361-595-8593), with the legal description and directions to the site.
Inspections are where schedules slip.
Get a free quote →Who issues building permits in Kingsville?
The City of Kingsville’s Building Services Division at 410 W. King (361-595-8019), for all work inside city limits.
Does Kingsville regulate land outside its city limits?
Its subdivision and drainage rules reach 2 miles beyond the city limits, so land divided there is platted under City rules, while the City’s building code applies inside its corporate limits.
Simplify Kleberg County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Texas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Kleberg County sooner?
Let Alliance prepare, file, and track your Kleberg County permits while your crew stays on the job.
More Texas permitting guides
This guide is provided by Alliance Permitting for general information about Kleberg County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.