Municipal Guide Texas Irving · Dallas County

Irving Building Permit Guide

How to get a building permit in Irving, TX — the MGO portal, the homestead exemption rule, what needs a permit, and inspections. 2026 guide.

Authority: Building and PermittingCode: I-Codes with Irving and regional amendmentsPortal: MGO (My Government Online)
Authority
Building and Permitting(972) 721-2600
Apply Online
MGOMy Government Online
Homeowner work
Homestead exemptionFiled with DCAD — except roofs
County
DallasDFW Airport partly in city

Irving issues building permits through Building and Permitting, running applications on MGO — My Government Online. Building permits are required to erect, enlarge, alter, move, demolish or repair a structure in the city, and the city publishes Online Portal Tips covering account creation and platform use.

Irving has a homeowner rule with a specific carve-out worth knowing. If the homeowner plans to do the work themselves, they must have a homestead exemption filed with the Dallas Central Appraisal District before applying for a residential permit — except for roof permits.

The exemptions are clearly stated as well: permits are not required for cosmetic work such as painting, carpeting, and cabinetry, nor for replacing fixtures or appliances at existing connections — except water heaters. That water heater exception catches people who assume a like-for-like swap is exempt.

Applies inside Irving city limits in Dallas County. Grand Prairie, Dallas, Coppell, Farmers Branch, and Euless permit independently, and DFW International Airport property — part of which sits within Irving — runs under its own arrangements. Confirm the parcel before filing.

📍

Water heaters need a permit; most fixture swaps do not. Irving exempts replacing fixtures or appliances at existing connections, but explicitly carves out water heaters. And a homeowner doing their own work needs a homestead exemption on file with the Dallas Central Appraisal District first — except on roof permits.

What requires a permit in Irving?

Irving requires a building permit to erect, enlarge, alter, move, demolish, or repair a structure. For most permits a plan showing the proposed changes is required, and the city publishes a residential brochure covering the detail.

The homeowner route is narrower than it first appears. It turns on a homestead exemption actually being filed with the Dallas Central Appraisal District before application — not simply on the property being the applicant’s residence.

Permit required

  • Erect, enlarge, alter, move, demolish, or repair a structure
  • New residential and commercial construction, additions
  • Structural and load-bearing alterations
  • Interior remodels and commercial finish-out
  • Reroofing and exterior envelope work
  • Water heater replacement — explicitly not exempt
  • Electrical, plumbing, and mechanical work
  • Change of occupancy or use

Not required

  • Cosmetic work such as painting, carpeting, and cabinetry
  • Replacing fixtures or appliances at existing connections — except water heaters
  • Routine maintenance not affecting structure or systems
  • Note: a plan showing proposed changes is required for most permits that do apply
⚠️ A homeowner intending to perform their own work must have a homestead exemption filed with the Dallas Central Appraisal District before applying for a residential permit, except on roof permits. That is a documentation state, not a self-declaration — confirm the exemption is on file before planning to self-perform.

Irving building department: who handles permitting

Building and Permitting handles plan review, permit issuance, and construction inspections inside Irving city limits, with the MGO portal carrying applications and the city publishing Online Portal Tips for account setup and use.

Irving publishes a residential brochure covering plan requirements for residential permits, which is the right reference before assembling a package on a home project.

City of Irving Building and Permitting contact
DetailInformation
AuthorityCity of Irving Building and Permitting
Phone(972) 721-2600
Online portalMGO — My Government Online
Portal guidanceOnline Portal Tips page covers account creation and platform use
Homeowner ruleHomestead exemption filed with Dallas Central Appraisal District required, except roof permits
Exempt workCosmetic work; fixture and appliance replacement at existing connections, except water heaters
Plan requirementA plan showing proposed changes is required for most permits
ReferenceResidential brochure published by the city
💻

Read the Online Portal Tips page before creating an MGO account. Irving publishes instructions specifically for account creation and platform use, and working through them first avoids the most common first-filing problems.

Irving permits: record types and what each covers

A building permit is one record among many. Building and Permitting issues work under separate record types inside MGO, and filing under the wrong one is a rejection rather than a correction. Irving states both its trigger and its exemptions clearly — which makes the classification question unusually answerable, provided you read the carve-outs.

Residential permit types

Residential permit types in Irving
Permit typeWhat triggers itReview pathFee basis
New constructionNew dwellings, additions, and accessory structures over the exempt thresholdFull plan review (structural, energy, zoning)Valuation-based
Renovation / alterationStructural or load-bearing changes, layout changes, substantial repairPlan review scaled to scopeValuation-based
ReroofRoof covering replacement and most major roof repairProduct approval review; dry-in and nail-off inspectionsValuation or squares
Solar photovoltaicRooftop or ground-mount PV installation or replacementStructural plus electrical reviewFlat or system-size based
Solar thermalPassive water heating or pool heating systemsPlumbing and structural reviewFlat or per-permit minimum
ElectricalService changes, panel upgrades, new circuits, most wiring alterationsTrade review; filed against the building permitPer-permit minimum or per-device
PlumbingNew piping, repipes, water heaters, fixtures, gas pipingTrade review; filed against the building permitPer-permit minimum or per-fixture
Mechanical / HVACChangeouts that are not like-for-like, ductwork, refrigerationTrade review; filed against the building permitPer-permit minimum or per-unit
Windows and doorsReplacement units and opening protectionProduct approval review for wind-borne debrisValuation or per-opening
Pool and spaIn-ground and above-ground pools, spas, barrier and enclosure workPlan review plus barrier and electrical bondingValuation-based
Fence and accessoryFences, sheds, decks, and carports over the exempt thresholdZoning plus structural where applicableFlat or valuation-based
DemolitionFull or partial demolition of a structureUtility disconnect verification requiredFlat

Commercial permit types

Commercial permit types in Irving
Permit typeWhat triggers itReview pathFee basis
New constructionGround-up commercial, industrial, and multifamilyFull multi-discipline plan reviewValuation-based
Tenant improvementInterior build-outs and suite fit-upsPlan review across affected disciplinesValuation-based
Renovation / alterationStructural, envelope, or system changes to an existing buildingPlan review scaled to scopeValuation-based
Change of useConverting a building from one occupancy classification to anotherZoning, life-safety, and accessibility reviewValuation or flat
ReroofCommercial roof covering replacementProduct approval review plus fire review where applicableValuation or squares
Solar photovoltaicCommercial rooftop, carport, and ground-mount PVStructural, electrical, and often fire reviewValuation or system-size based
ElectricalService, distribution, and branch circuit workTrade reviewValuation or per-device
PlumbingSupply, waste, vent, and gas systemsTrade reviewValuation or per-fixture
Mechanical / HVACRooftop units, ductwork, exhaust, and refrigerationTrade reviewValuation or per-unit
Fire protectionSprinkler, standpipe, alarm, and suppression systemsFire prevention plan reviewValuation or per-device
SignWall, monument, and illuminated signageZoning plus electrical where illuminatedFlat or per-sign
DemolitionFull or partial commercial demolitionUtility disconnect and environmental clearanceFlat or valuation-based

Residential

  • Single-discipline review in most cases
  • Master permit with trades filed against it
  • Owner-builder route exists but carries statutory affidavits
  • Product approval drives roofing and opening protection

Commercial — multi-discipline

  • Concurrent review across building, fire, and zoning
  • Signed and sealed plans across every affected discipline
  • Accessibility and life-safety review attach to change of use
  • Impact and concurrency fees can apply on top of permit fees

Solar permits in Irving

Solar is permitted as its own record type in most Texas jurisdictions rather than rolled into a general building permit, and residential and commercial photovoltaic are usually separate records with different document sets. Solar thermal — passive water and pool heating — is a third, distinct record.

A photovoltaic submittal is reviewed on two tracks at once: structural (roof load path, attachment spacing, uplift) and electrical (conductor sizing, rapid shutdown, point of interconnection). A single-line diagram and a signed and sealed structural attachment detail are the two attachments most often missing on a first submittal.

Texas HOA law is narrower than most installers assume. Under Tex. Prop. Code §202.010 a property owners' association cannot prohibit a solar energy device outright, and any dedicatory provision that does is void — but the statute expressly preserves the association's right to require prior architectural approval and to impose placement and appearance conditions. Approval cannot be unreasonably withheld, and conditions that cut estimated production materially are not enforceable. Practically: get the HOA submittal moving in parallel with the permit rather than treating it as optional.

Texas SB 1202 changed this materially on September 1, 2025. Codified at Tex. Local Gov't Code §247.0025, it lets authorized third parties — licensed engineers, electrical inspectors, and Texas master electricians — perform the plan review and inspections for a home backup power installation instead of the jurisdiction. The definition covers generators, energy storage systems, and associated equipment serving a one- or two-family dwelling at 600 volts or less. Construction may begin on submission of the notice, the third party has 15 days to report results, and the regulatory authority must issue the approval on a short statutory clock. Jurisdictions that process work this way do not review or inspect it, and responsibility for code compliance sits with the third-party reviewer and the contractor of record. Note the boundary: it is a backup-power provision, so a straight grid-tied photovoltaic array with no storage is not automatically inside it, and separate electrical or plumbing permits are still generally required for service release. Confirm how Irving is administering SB 1202 before assuming either path.

Utility interconnection runs parallel to the building permit, not inside it. Permission to Operate is issued by the utility after the final electrical inspection clears, and in deregulated territory the interconnecting utility is the wires company rather than the retail provider.

Roofing permits in Irving

A roof covering replacement requires a permit in most Texas municipalities. Repairs below the local threshold may not, but the threshold is scope-specific and set locally — confirming it with the building department before tear-off is cheaper than an after-the-fact permit.

Texas has no statewide product approval system, so there is no central listing to check a roofing product against. Compliance runs against the code edition the jurisdiction has actually adopted and the local amendments layered on top of it. Those amendments are where the binding requirements live, and they change from city to city inside the same county.

Texas Department of Insurance windstorm certification — the WPI-8 process — applies only in the designated seaward counties along the Gulf. Irving is not a seaward county, so WPI-8 certification does not attach here and roofing contractors licensed for inland work do not need TDI appointment for this jurisdiction.

Hail is the governing weather risk across most of inland Texas, not wind. Impact-resistant Class 3 and Class 4 shingles carry insurance premium credits from most carriers, and under Tex. Prop. Code §202.011 a property owners' association cannot prohibit shingles that are wind or hail resistant, or that improve energy efficiency, provided they otherwise match the roof's appearance requirements.

Reroof inspections are typically sequenced by the jurisdiction, commonly a decking or nail-off inspection before the covering goes down and a final afterward. Covering the deck before the required intermediate inspection means tearing it back open.

Texas has no statewide building code and no statewide general contractor license. The code edition and the amendments that bind your submittal are adopted locally, and contractor registration with the jurisdiction is frequently the gate that has to clear before a record type can even be filed. On commercial work, projects over the statutory threshold also register separately with TDLR for Texas Accessibility Standards review, which runs outside the building permit entirely.

Irving sits in Dallas County in the North Texas hail belt, roughly 105 mph ultimate design wind speed under the adopted code and far outside any coastal windstorm requirement. Hail drives reroof volume. Note that roof permits are the one homeowner category Irving does not gate behind a homestead exemption.

Record types, document sets, and fee structures are set by Irving Building and Permitting and change without notice. Texas has no statewide building code, so the adopted editions and amendments are Irving’s own, layered with North Texas regional amendments. Grand Prairie, Dallas, Coppell, and Farmers Branch permit independently. Confirm the record type before filing.

Irving permit cost and fees

Irving permit fees follow the city fee schedule and scale with the type and valuation of work, with separate trade permit fees and separate records for demolition and specialty work.

On a homeowner project, factor the homestead exemption status early. If the exemption is not on file with the Dallas Central Appraisal District, self-performing is not available and a registered contractor becomes a cost line that was not in the original plan.

How Irving fees are structured
Fee componentHow it works
Building permitScales with type and valuation of work
Trade permits (E / P / M)Separate fee per trade, filed by the licensed contractor
Water heater replacementPermitted — not covered by the fixture replacement exemption
Roof permitHomeowner may self-perform without a homestead exemption on file
Re-inspectionCharged when a checkpoint fails and is re-requested
Certificate of occupancyRequired for new commercial occupancy or change of use
🧮

Want a precise number for a specific Irving project? Send us the scope and valuation and we’ll return a fee estimate alongside a filing timeline.

Irving trade permits

Electrical, plumbing, and mechanical work each need their own permit pulled by the state-licensed contractor for that trade, unless the homeowner qualifies under the homestead exemption route.

Electrical

Service and panel work, new circuits, solar PV, EV charging, and backup power — performed by a TDLR-licensed electrician.

Plumbing

New plumbing, repipes, fixtures, and gas piping — performed by a TSBPE-licensed plumber. Water heater replacement is permitted work.

Mechanical / HVAC

Installations, non-like-for-like changeouts, ductwork, and venting, reviewed against the mechanical and energy codes as adopted.

Homeowner work

Available where a homestead exemption is filed with the Dallas Central Appraisal District, except roof permits which do not require it.

🧢 The water heater carve-out is the one to remember. Irving exempts fixture and appliance replacement at existing connections but not water heaters, so a swap that would go unpermitted elsewhere needs a permit and a licensed plumber here.

Irving permit application: how to apply step by step

1. Confirm the scope needs a permit

Irving requires permits to erect, enlarge, alter, move, demolish, or repair a structure, and exempts cosmetic work and most fixture replacement — but not water heaters.

2. Check the homeowner route if self-performing

A homestead exemption must be filed with the Dallas Central Appraisal District before applying for a residential permit, except on roof permits.

3. Create an MGO account

Use the city’s Online Portal Tips page for instructions on account creation and platform use.

4. Prepare the plan

For most permits a plan showing the proposed changes is required. See the residential brochure for detail on home projects.

5. Submit, clear review, and take issuance

File through MGO, respond to review comments, pay fees, and take the permit. Post it on site before work begins.

6. Inspect through close-out

Schedule inspections as phases complete and clear the final, plus a certificate of occupancy where the scope requires one.

Inspections in Irving

Building and Permitting performs construction inspections against the adopted codes, running the standard sequence with checkpoints set by the permit record — foundation, framing, rough-in across the trades, insulation, and final.

Confirm inspection request methods and cutoff times through MGO or with the department at (972) 721-2600. These vary across adjoining Dallas County cities and are a common source of lost days.

Keep the permit posted and approved plans on site, and address correction notices before requesting a re-inspection.

Irving permit search and official resources

Frequently asked questions

Who issues building permits in Irving?

City of Irving Building and Permitting issues building permits for everything inside Irving city limits, handling plan review, permit issuance, and construction inspections. Work outside the city limits falls to Dallas County, and Texas counties have sharply limited building authority in unincorporated areas.

How do I get a permit in Irving?

Confirm the scope triggers a permit and that zoning allows it, prepare the plan set and site plan, file through MGO (My Government Online) with contractor licensure in place, respond to plan review comments, pay fees and take issuance, then run the inspection sequence through final. Contractor credentialing is the step most often missed and it blocks everything downstream.

What codes apply in Irving?

Texas has no mandatory statewide building code. Municipalities adopt and amend model codes themselves, so Irving enforces I-Codes with Irving and regional amendments. The local amendments are where the binding requirements live, and they differ from neighboring cities working off the same model code. Confirm the current adopted editions with the department before designing to a specific one.

Can I pull my own permit in Irving as a homeowner?

Only with a homestead exemption on file. If the homeowner is planning to do the work themselves, they must have a homestead exemption filed with the Dallas Central Appraisal District before applying for a residential permit — with one exception: roof permits. That makes the homeowner route narrower than it appears, because it turns on a documented exemption rather than simply owning and occupying the property.

Does replacing a water heater need a permit in Irving?

Yes. Irving does not require permits for cosmetic work such as painting, carpeting, and cabinetry, nor for replacing fixtures or appliances at existing connections — but water heaters are explicitly excepted from that exemption. A like-for-like water heater swap that would go unpermitted in some jurisdictions is permitted work here, and needs a TSBPE-licensed plumber unless the homeowner route applies.

Which portal does Irving use?

MGO — My Government Online. Building permits are applied for through the city’s online permit portal, and Irving publishes an Online Portal Tips page with instructions on creating an account and using the platform. For most permits a plan showing the proposed changes is required, and the city publishes a residential brochure covering what home projects need. Building and Permitting can be reached at (972) 721-2600.

Do I need a permit to install solar panels in Irving?

Yes. Photovoltaic installations in Irving are permitted under a dedicated solar record type reviewed on both a structural and an electrical track. Solar thermal — passive water and pool heating — is a separate record. Under Tex. Prop. Code §202.010 a homeowners' association cannot ban a solar energy device outright, but it may still require prior architectural approval and impose reasonable placement conditions, so run the HOA submittal alongside the permit. Since September 1, 2025, Tex. Local Gov't Code §247.0025 (SB 1202) also permits third-party plan review and inspection of home backup power installations — generators and energy storage for one- and two-family dwellings at 600 volts or less — in place of jurisdiction review. Utility interconnection and Permission to Operate still run in parallel.

Does a roof replacement require a permit in Irving?

Yes, in most cases. A roof covering replacement requires a permit in most Texas municipalities including Irving, though minor repairs can fall below the local threshold. Texas has no statewide product approval system and no central product listing, so compliance runs against the locally adopted code edition and its local amendments. Hail rather than wind is the governing risk inland, and Tex. Prop. Code §202.011 bars an HOA from prohibiting wind or hail resistant shingles.

What is the difference between a residential and a commercial permit in Irving?

Residential work is generally a single-discipline review filed as a master permit with trades filed against it. Commercial work in Irving runs concurrent review across building, fire, and zoning, requires signed and sealed plans for every affected discipline, and can carry impact and concurrency fees on top of permit fees. Change of use adds accessibility and life-safety review.

Do trade permits need to be pulled separately in Irving?

Yes in most cases. Electrical, plumbing, and mechanical work is permitted separately by the licensed contractor for each trade and filed against the master building permit. Each trade permit carries its own fee and its own inspection sequence.

What happens if I file under the wrong permit type in Irving?

The application is rejected rather than corrected. Irving Permits and Licensing closes the record, the filing is resubmitted under the correct record type, and the review clock restarts from zero. Confirming the record type before filing is the cheapest step in the entire process.

Can I apply for all Irving permit types online?

Yes. Irving handles permit applications through MGO, its online permit portal, and publishes Online Portal Tips covering account creation and platform use. For most permits a plan showing the proposed changes is required. Confirm inspection request methods and any contractor registration requirements with Building and Permitting at (972) 721-2600 before assembling a package.

Simplify Irving permitting with Alliance Permitting

A clearly stated permit trigger, a homeowner route that turns on an appraisal district filing, and a water heater carve-out that catches almost everyone — Irving is well documented and specific about its edges. Alliance Permitting is a permit expediter for Irving: we file in MGO and get the scope classification right the first time.

250K+Permits approved
All 50States covered
AI + HumanExpert filing
Done-for-youWe file, you build

Trusted by leading builders and brands — including Dream Finders Homes, Tesla, Verizon, Hyatt, and Sunnova.

Contractors and builders choose Alliance for Irving because we deliver:

  • Local expertise — we know the MGO workflow, the homestead exemption rule, and where Irving’s exemptions actually stop.
  • Complete oversight — track every permit and inspection across all your jobs in one place.
  • Error-free submissions — AI pre-checks plus expert review catch issues before they become correction cycles.

Alliance Permitting is a permit documentation and submission company: we prepare your paperwork, file it correctly, and coordinate with the authority having jurisdiction through issuance. We are not a contractor and do not perform licensed plan review or inspections; that work stays with your team and the jurisdiction.

Ready to break ground in Irving sooner?

Let Alliance prepare, file, and track your Irving permits while you stay focused on building. Get a free, no-obligation quote today.

This guide is provided by Alliance Permitting for general informational purposes and reflects publicly available information believed accurate as of July 2026. Permit requirements, fees, and processes change; always confirm current details with City of Irving Building and Permitting before filing. This is not legal advice.

Expedite Your Permits Today!

Free Quote1-855-478-4290