Haltom City’s Building Inspection Division issues building and trade permits through the MyGov Online Action Center, under the 2024 International codes the City Council adopted in July 2025.

Authority: Haltom City Building Inspection DivisionCode: 2024 I-Codes, 2023 NEC (adopted July 17, 2025)Phone: 817-222-7730
Office
City Hall, 4801 Haltom Rd.Mon–Thu 7:30 a.m.–6:00 p.m.
Portal
MyGov Online Action Center1 printed + 1 digital set
New home
$0.75 per sq ftPlan review 65% of permit fee
Review time
7–10 business daysOnce the submittal is complete

Building permits inside Haltom City come from the Building Inspection Division of the Planning & Community Development Department at City Hall, 4801 Haltom Road (817-222-7730). Applications are uploaded to the City’s MyGov Online Action Center, and a complete submittal is generally processed in 7 to 10 business days. A new house is charged $0.75 per square foot, plus a plan review fee of 65% of the permit fee.

What requires a permit in Haltom City?

The City lists the permit types it issues: residential new construction, additions, remodels and repairs; commercial new buildings, additions, remodels and repairs; accessory buildings; demolition and moving; electrical, mechanical and plumbing work; fences; foundation repair; solar systems; and street contractor work on curbs, gutters, drive approaches and sidewalks. Roofing, irrigation, signs and certificates of occupancy have their own forms.

Permit needed

  • Accessory buildings over 200 sq ft
  • Foundation repair, with an engineer’s sealed letter
  • Concrete slabs larger than 10 by 10 feet (flatwork permit and site plan)
  • Drive approaches, built by a licensed, bonded right-of-way contractor
  • Residential fences at least 30 inches tall
  • Roof replacement, including a decking inspection
  • Any electrical service change-out, which also triggers hard-wired smoke detectors and GFCI outlets

No building permit

  • Accessory buildings of 200 sq ft or less
  • Flag poles
  • Painting, papering and similar finish work
  • Platforms, walks and decks no more than 6 inches above grade
  • Retaining walls up to 4 feet, unless they hold a surcharge or flammable liquids
  • Above-ground pools at houses, up to 5,000 gallons
  • Window awnings projecting no more than 54 inches on houses

Exempt items may still need separate electrical, plumbing or mechanical permits. A detached garage may cover no more than 50% of the rear yard and is limited to 30% of the main building’s floor area (never less than 600 sq ft), and one over 600 sq ft must meet the house’s masonry requirement.

Short on time to read all of this?

Get a free quote →

Haltom City building department: who handles permitting

The Planning & Community Development Department coordinates all development in the city. Its Building Inspection Division reviews plans, issues permits and inspects construction, renovation and occupancy, while the planning staff handle zoning, platting and the Planning and Zoning Commission and Zoning Board of Adjustments.

Haltom City permitting contact
DetailInformation
OfficePlanning & Community Development, City Hall, 4801 Haltom Rd., Haltom City, TX 76117
Inspections and permits817-222-7730
Administration and planning817-222-7757
HoursMonday to Thursday, 7:30 a.m. to 6:00 p.m.; closed Friday to Sunday
ApplyMyGov Online Action Center

Applying online and registering as a contractor

Permit applications are uploaded to the MyGov Online Action Center, which also lets you print the approved permit; it can be collected at the office instead. Fees are paid by check, money order or credit card.

  • Contractor registration: every contractor must register before the building application is submitted, uploading a driver licence and a certificate of insurance that names the City of Haltom City as certificate holder. Registration costs $100 and $50 a year to renew; master electricians register free.
  • Homeowners: owners working on their own home are exempt from registration if the property has a homestead exemption with the Tarrant County Appraisal District and their driver licence shows that address.
  • Forms: the City publishes building, demolition, electrical, mechanical-plumbing, residential roofing and residential irrigation permits, two certificate of occupancy forms (including a lights-on application), sign applications and contractor and street contractor registration.

Haltom City permit costs and fees

Fees come from the Fiscal Year 2026-27 Fee Schedule, approved by City Council in August 2026 and in effect from October 1, 2026. Inspection fees are included in the building permit fee.

Not sure this scope needs a permit?

Get a free quote →
Haltom City residential and general permit fees (FY2026-27)
ProjectFee
New house or addition$0.75 per sq ft
Carport$0.50 per sq ft
Remodel$300
Roof, siding or windows$175 each
Foundation repair$175
Accessory building or flatwork$125 each
Pool$500 in-ground; $100 above-ground
Fence (30 inches or taller)$75
Irrigation system$140
Demolition$100 per unit
Plan review65% of the permit fee
Certificate of occupancy (new business or change of use or owner)$100
Re-inspection$75
Driveway approach$75; later inspections $50 each

For example, a new 2,000 sq ft house has a $1,500 building permit fee and a $975 plan review fee, before trade permits.

Commercial building, sign, fence and paving permits are priced on valuation. Selected bands from the schedule:

Haltom City commercial building permit fees (FY2026-27)
ValuationFee
$2,001 to $25,000$73.30 plus $15.26 per $1,000 over the base
$25,001 to $50,000$424.28 plus $11.10 per $1,000 over the base
$50,001 to $100,000$701.78 plus $7.63 per $1,000 over the base
$100,001 to $500,000$1,083.28 plus $6.10 per $1,000 over the base
$500,001 to $1,000,000$3,523.28 plus $5.18 per $1,000 over the base
Over $1,000,000$6,118.46 plus $3.98 per $1,000 over the base

Rather talk it over?

Call 1-855-478-4290 →

Mechanical and plumbing permits start from a $27.50 base fee, and site plan review is free. Rezoning, platting and conditional use permit applications cost $300 each.

Contractors and trade permits in Haltom City

The Building Inspection Division issues electrical permits and combined mechanical-plumbing permits on their own forms. Trade work is checked against the 2023 National Electrical Code and the 2024 plumbing, mechanical and fuel gas codes.

  • Electrical: any service change-out requires hard-wired smoke detectors and GFCI outlets to be brought up to date.
  • Plumbing: the City’s minimum water service line is 1 inch and the minimum building sewer is 4 inches.
  • Mechanical: air conditioning units must be secured to their concrete pads, and duct blaster and door tests are required only on new construction.
  • Irrigation: residential systems use the City’s irrigation checklist-permit, and irrigators register for $100 ($50 to renew).

What to submit and how long review takes

Residential

  • Drawings on paper at least 11 by 17 inches, plus the digital copy uploaded to MyGov
  • How the building or addition will be built: roof, walls, foundation, and front and side elevations
  • Survey plat signed by a licensed surveyor, with building lines and easements
  • Drainage grading plan and a soil report for new homes and livable additions
  • Engineer-stamped foundation, framing and roof plans
  • REScheck energy calculations and mechanical, electrical and plumbing plans
  • Owner or contractor name and phone, and the job value

Commercial

  • One complete set of sealed plans with site and landscape plans, plus a digital copy
  • An extra set of electrical and mechanical plans showing fire protection
  • A certified copy of the recorded plat
  • COMcheck or energy code review sheet
  • A TDLR registration number for projects over $50,000
  • An asbestos survey or certification for renovation or demolition
  • Proof of Tarrant County Health Department submittal for food businesses

Rather not deal with the Haltom City building department?

Get a free quote →

Once everything is in, the City says the permit process takes 7 to 10 business days. Roof applications must list the shingle brand or year, the felt type and the sheathing thickness (at least 5/8 inch lumber or 7/16 inch OSB or plywood). A permit stays valid for 180 days.

Haltom City permit application: local workflow

1. Register the contractor

Upload the driver licence and insurance certificate for registration, unless you are a homestead owner doing your own work.

2. Check zoning and the flood map

Confirm setbacks, garage limits and whether the lot is in a FEMA floodplain or floodway; rezonings and variances go to the Planning and Zoning Commission or Zoning Board of Adjustments.

3. Prepare the plan set

Work through the City’s plan review checklist for a house or commercial building.

4. Upload to MyGov

Submit one digital set in the Online Action Center, plus one printed 11 by 17 inch set.

5. Pay and collect the permit

Pay the permit and 65% plan review fee, then print the approved permit from MyGov or pick it up.

6. Call in inspections through the final

Request each stage by phone, then get the certificate of occupancy before a commercial space is used.

Inspections in Haltom City

The contractor, or whoever is doing the work, is responsible for requesting each inspection when the work is ready. Some inspections are set up when the permit is issued; others are booked by calling 817-222-7730, where the permit technician needs the job address, the inspection type, a morning or afternoon preference, and a name and call-back number. A voicemail does not put you on the schedule, so speak to a City representative.

Want this handled start to finish?

Get a free quote →

A typical job is inspected in this order: form board survey, plumbing rough, foundation (after underground plumbing and electrical pass and the steel is in place), framing, insulation, electric or gas meter release, and the final once the trade finals have passed. Foundation repairs need the engineer’s final report before the final inspection. Work called for inspection that is not ready, or not corrected, is charged a $75 re-inspection fee. Commercial buildings, new or existing, need a certificate of occupancy at the final inspection before they are used.

Texas building code

Texas has no single statewide building code: state law makes the International Residential Code the base code for homes in cities and the International Building Code the base for commercial buildings, with each city choosing the edition and its own amendments, while the National Electrical Code and the energy code apply statewide. Outside city limits most counties issue no building permits for homes. Texas building code rules

Haltom City permit search and official resources

Inspections are where schedules slip.

Get a free quote →

Haltom City permit FAQ

How much is a building permit for a new house in Haltom City?

$0.75 per square foot, plus a plan review fee of 65% of the permit fee. A 2,000 sq ft house pays $1,500 plus $975.

Do I need a permit for a shed in Haltom City?

Not for an accessory building of 200 square feet or less. Larger ones need a $125 permit.

How long does a Haltom City building permit take?

The City says 7 to 10 business days once everything has been submitted, and the permit is valid for 180 days.

Can a homeowner pull a permit without registering?

Yes, for work on their own home if it has a Tarrant County Appraisal District homestead exemption and the driver licence matches the address.

Do I need a permit for a fence or a new roof?

Yes. Fences 30 inches or taller cost $75 and roofs $175, and roof jobs include a decking inspection.

How do I schedule an inspection?

Call 817-222-7730 with the address, inspection type, morning or afternoon preference and a call-back number, and speak to a staff member rather than leaving a message.

Simplify Haltom City permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Texas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Haltom City sooner?

Let Alliance prepare, file, and track your Haltom City permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Haltom City permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.