Inside Cedar Hill city limits, permits come from the City’s Building Inspections division at the Government Center, 285 Uptown Boulevard, and contractors must apply online through EnerGov Customer Self Service. A new home costs $0.80 per square foot under roof plus a $150 plan review fee, and that permit already includes the electrical, plumbing and HVAC permits.
What requires a permit in Cedar Hill?
The City’s permit-process page sets a broad rule: a permit is needed for any construction, change of use or occupancy, alteration or repair of a structure, and for roofing, exterior doors and windows and building systems, including plumbing, electrical, mechanical and irrigation.
Homes
- New one- and two-family dwellings, additions and alterations
- Re-roofs, and window or exterior door replacement
- Fences, accessory buildings, generators and pools, each on its own permit
- Retaining walls of any height
- Solar panels
- Driveways, approaches, sidewalks and patios
- Electrical, plumbing, mechanical and lawn sprinkler work
- Tree removal or moving soil before a new home is built
Commercial
- New buildings, additions, alterations and tenant finish-outs
- Multi-family and industrial work
- Certificate of Occupancy for every business
- Wall, monument, pole and temporary event signs
- Fire permits
- Construction trailers and demolition
- Grease and grit interceptors, and health permits for food businesses
Cedar Hill building department: who handles permitting
Building Inspections reviews plans, registers contractors, issues permits and carries out inspections for property inside Cedar Hill. The Fire Marshal inspects commercial premises before a Certificate of Occupancy is issued, and the Planning Department handles zoning, site plans and tree preservation. Most of the city lies in Dallas County, with a small part in Ellis County.
| Detail | Information |
|---|---|
| Department | City of Cedar Hill Building Inspections |
| Phone | 972-291-5100 ext. 1090 (fax 972-291-7250) |
| citypermits@cedarhilltx.com | |
| Office | Government Center, 285 Uptown Boulevard, Cedar Hill, TX 75104 |
| Inspection requests | 972-291-5100 ext. 1093 or cityinspections@cedarhilltx.com |
| Fire Marshal | 972-291-1011 |
| Planning (trees, site plans) | 972-291-5100 ext. 1081 |
Short on time to read all of this?
Get a free quote →EnerGov filing, applications and contractor registration
EnerGov Customer Self Service has been the City’s permit system since September 2018. After registering an account you can apply for any building permit, upload plans, pay fees, track review, book inspections, read results and file planning cases. Contractors must apply through the portal; a homeowner can email the paper Building Permit Application to citypermits@cedarhilltx.com instead.
Every general contractor and every subcontractor must be registered with the City when the permit is submitted, and each subcontractor registers on its own. Registration runs from January 1 to December 31 and is renewed each year:
- General contractor: $100 a year, on the Contractor Registration Form.
- Electrical, plumbing, mechanical and irrigation contractors: no fee, but proof of the state licence and the Trade Contractor Registration form are required.
- Subcontractor Validation: a validation form for each of the three trades goes in with a new-home application. The general contractor can turn these in.
The City also publishes separate forms for signs, special event signs, fire permits, Certificates of Occupancy, health permits, donation containers, grease and grit interceptors and small cell sites.
Cedar Hill permit costs and fee structure
Ordinance No. 2023-794, in effect since October 10, 2023, sets the building permit rates. Square footage for a dwelling counts everything under roof, including the garage, porches, storage and breezeways.
| Project | Fee |
|---|---|
| New one- or two-family dwelling (trade permits included) | $0.80 per sq ft under roof |
| Single-family plan review | $150 per dwelling unit |
| Residential addition | $0.80 per sq ft, $75 minimum |
| Residential alteration | $0.60 per sq ft, $75 minimum |
| Commercial, multi-family, tenant finish-out, retaining wall | Valuation table (below) |
| Commercial plan review | 65% of the building permit fee, paid when you apply |
| Re-roof, or window and door replacement (residential) | $100 each |
| Residential solar panels | $200 |
| In-ground pool / above-ground pool or spa | $250 / $150 |
| Accessory building up to 100 sq ft / 101–239 sq ft | $75 / $100 |
| Residential fence | $50 |
| Residential electrical, mechanical or plumbing repair | $75 each |
| Lawn sprinkler / on-site sewer system | $150 each |
| Demolition / construction trailer | $75 / $150 |
| Certificate of Occupancy | $100 |
| Re-inspection | $50 |
Not sure this scope needs a permit?
Get a free quote →Commercial work, accessory buildings of 240 sq ft or more, residential concrete and monument or pole signs use the valuation table: $75 up to $500 of value; $99 for the first $2,000 plus $12 per extra $1,000; $375 for the first $25,000 plus $11 per $1,000; $650 for the first $50,000 plus $10; $1,150 for the first $100,000 plus $8; $4,350 for the first $500,000 plus $5; and $6,850 for the first $1,000,000 plus $4 per extra $1,000.
For example, a 2,500 sq ft house (living area, garage and porch together) pays $2,000 for the permit and $150 for plan review. Since August 1, 2024, card payments carry a 3% surcharge.
Contractors and trade permits in Cedar Hill
For a new one- or two-family home, the electrical, plumbing and HVAC permits are included in the $0.80 per sq ft building permit, so the trade contractors are listed on the application and validated rather than paying again. On existing homes, an electrical, mechanical or plumbing repair or alteration is a $75 permit, and a lawn sprinkler system is $150.
Trade permits are filed online with one set of plans for the work; irrigation needs two sets. Each trade contractor must hold a current City registration backed by its state licence before the permit can be issued. Landscape irrigation must meet the state irrigation rules the City has adopted by reference.
Rather talk it over?
Call 1-855-478-4290 →Plans and documents to upload
New home
- Application listing all subcontractors, with the three trade validation forms
- HOA approval letter, where there is an HOA
- Plot plan: house on lot, setbacks, driveway and sidewalks, building lines and easements, floodplain, street and building elevations above sea level
- Floor plan, exterior elevations, door and window sizes
- Engineered foundation plan and a soils report with PVR (potential vertical rise) data
- Framing details and a wall bracing plan that matches the foundation anchors
- Energy report (IC3, Energy Star or HERS)
- Electrical and plumbing plans, and an engineered drainage plan
Commercial
- Site plan with setbacks, parking, sidewalks, fire lanes, landscaping and easements
- Site utility plan
- Floor plans, exterior and interior elevations, wall and building sections
- Stairs, handrails and guardrails, toilet plans
- Door and window schedules and details
- Structural plans and foundation details
- Plumbing, electrical and mechanical plans and a COMcheck energy review
- The plan review fee (65% of the permit fee)
A new commercial building cannot be permitted until the Planning and Zoning Commission and City Council have approved its site plan. Pools need building plans, a site plan with a utility company release, an equipment list and a depth profile, plus a fence permit if the yard has no fence. Signs need dimensions, specifications and an engineer-sealed structural design.
Cedar Hill permit application: local workflow
Make sure the address is inside Cedar Hill. Commercial sites need an approved site plan, and unplatted lots or lots platted after July 10, 2007 fall under the tree preservation ordinance, so call Planning before any tree comes down.
The general contractor and each trade subcontractor register for the calendar year by email to citypermits@cedarhilltx.com or in person.
Follow the City’s EnerGov registration instructions; once logged in, every permit tied to the account is visible.
Enter the areas under roof, the masonry percentage and the value of work, and upload the full plan set for the project type.
Pay the fees in the portal (3% extra by card), including the 65% plan review fee up front on commercial jobs.
Request each inspection by 4:00 p.m. the day before. Businesses then book the Building Inspector and the Fire Marshal for the Certificate of Occupancy.
Rather not deal with the building department?
Get a free quote →Inspections in Cedar Hill
Request inspections in EnerGov, by email to cityinspections@cedarhilltx.com or at 972-291-5100 ext. 1093 before 4:00 p.m. on the day before you want the visit. Approved plans must be on site for every inspection, and a failed inspection costs $50 to repeat.
A new home moves through these inspections in order:
- Temporary electric pole
- Pier inspection, where piers are used, and plumbing rough-in, each with a form board survey already filed
- Foundation, before the pour, with the termite treatment report in the office
- Second inspection: framing, plumbing top-out, electrical rough, duct rough, brick ties and poly-seal
- Insulation, with energy compliance from a third-party inspector
- Firebox for a site-built masonry fireplace
- Sidewalk, driveway and approach
- Building final for building, plumbing, electrical, HVAC, landscaping and final survey
Before the final, file the termite treatment certificate, the plumber’s SIC form, the final energy report and a final grade survey. Electric and gas meters are not released until the building final passes. In wet weather, concrete, plumbing rough and underground inspections are not done; call ext. 1090 between 8:00 and 9:00 a.m. to find out whether yours is cancelled, and rebook it yourself.
Local Cedar Hill rules builders run into
Site setup before inspections: a silt fence must surround the whole disturbed area and run across the front of the lot (a 20 ft gap is allowed for vehicles), with a gravel construction entrance, a dumpster, trash trailer or bin, and a portable toilet. No inspections are done until these are in place.
Lake Ridge and the Eagle Ford Shale: in the Lake Ridge subdivision, homes need a sealed lot grading and drainage plan, a foundation designed for the Eagle Ford Shale soils with an engineer’s letter before the City’s foundation inspection, and building pads at least 2 ft above street level. A separate escarpment development plan may also be required.
Want this handled start to finish?
Get a free quote →City amendments to the residential code: tank water heaters may not go in the attic and must sit at least 18 inches above a garage floor, every new home needs gutters, a retaining wall needs a permit at any height, and walls over 10 ft must be designed by an engineer.
Landscaping: new homes on single-family lots of 10,000 sq ft or less must be landscaped, including at least 5 caliper inches of trees, before they are occupied.
Codes: the City adopted the 2021 International Codes and the 2020 National Electrical Code, with local amendments, in a 2025 set of ordinances that also covers residential fences.
Texas building code
Texas has no single statewide building code: state law makes the International Residential Code the base code for homes in cities and the International Building Code the base for commercial buildings, with each city choosing the edition and its own amendments, while the National Electrical Code and the energy code apply statewide. Outside city limits most counties issue no building permits for homes. Texas building code rules
Cedar Hill permit search and official resources
- Cedar Hill Building Inspections
- Permit process and submittal lists
- EnerGov Customer Self Service portal
- Building permit fee ordinance No. 2023-794
- Residential Builder Packet (Rev. 1/2024)
- Inspections required
- Certificate of Occupancy
- Contractor registration
- Applications and documents
- Adopted codes and local amendments
Inspections are where schedules slip.
Get a free quote →Frequently asked questions
How much is a building permit for a new house in Cedar Hill?
$0.80 per square foot of total area under roof, garage and porches included, plus a $150 plan review fee. The electrical, plumbing and HVAC permits are included in that fee.
Do I need a permit to replace my roof or windows in Cedar Hill?
Yes. Roofing and exterior doors and windows are on the City’s permit list, and each residential re-roof or window and door permit is $100.
Does a fence or shed need a permit?
Yes. A residential fence permit is $50; an accessory building is $75 up to 100 sq ft and $100 up to 239 sq ft, with larger ones priced on the valuation table.
Can a homeowner apply without the portal?
Yes. Contractors must apply in EnerGov, but a homeowner may email the Building Permit Application to citypermits@cedarhilltx.com.
When must an inspection be requested?
By 4:00 p.m. the day before, through EnerGov, by email to City Inspections or at 972-291-5100 ext. 1093.
Do contractors have to register with Cedar Hill?
Yes, every calendar year. General contractors pay $100; licensed electrical, plumbing, mechanical and irrigation contractors register free with proof of licence.
What does a business need before it opens?
A $100 Certificate of Occupancy, issued after Planning approval, a Building Inspector visit and a Fire Marshal inspection booked 48 hours before opening.
Simplify Cedar Hill permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Texas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Cedar Hill sooner?
Let Alliance prepare, file, and track your Cedar Hill permits while your crew stays on the job.
More Texas permitting guides
This guide is provided by Alliance Permitting for general information about Cedar Hill permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.