Inside Canyon city limits, the City’s Planning & Development Department at 301 16th Street issues building, electrical, plumbing, mechanical and gas permits, and every application and plan set is filed online in MyGov. A new house is charged $0.30 per square foot ($120 minimum) plus $60 for each trade permit and a $15 technology fee, and commercial plans are reviewed in about 10–15 business days.
What requires a permit in Canyon?
The City requires a permit from the building official to build, enlarge, alter, repair, move or demolish a building or change its occupancy, and to install, alter, replace or remove mechanical and plumbing systems. Its permit FAQ adds re-roofing, water heaters and electrical, plumbing and HVAC repairs.
Permit needed
- New homes, additions and remodels
- Storage buildings over 200 sq ft
- Re-roofing
- Water heater installation
- Electrical, plumbing, gas and HVAC work
- Fences over 8 feet tall
- Swimming pools, except small above-ground pools
- Solar panels
- Demolition and moving a building
- Driveways and work in the right-of-way, signs and water wells
Exempt
- One-story tool or storage sheds of 200 sq ft or less
- Fences up to 8 feet
- Retaining walls up to 4 feet that hold back no surcharge
- Painting, papering, tiling, carpet, cabinets, countertops and similar finish work
- Above-ground prefabricated pools under 24 inches deep and 5,000 gallons
- Window awnings projecting no more than 54 inches
- Replacing lamps, stopping leaks and clearing drain stoppages
Homeowners may make their own electrical, plumbing, heating and air repairs on their homestead; otherwise a contractor must do the work.
Canyon building department: who handles permitting
| Detail | Information |
|---|---|
| Department | City of Canyon Planning & Development |
| Main phone | 806-655-5014 |
| Permit & Inspections | 806-655-5034 |
| Office | 301 16th Street, Canyon, TX 79015 |
| Apply | MyGov public portal |
Short on time to read all of this?
Get a free quote →Planning & Development issues every City permit, including the Fire Department’s construction and operational permits. Commercial plans are also reviewed by Public Works, Water Distribution and Wastewater Collection, the Fire Department and the City of Amarillo Environmental Health. City permits apply inside Canyon’s limits, and land beyond them is in Randall County. The City’s fee schedule includes a $500 fee for a petition to release land from Canyon’s extraterritorial jurisdiction (ETJ).
Canyon permits, MyGov and contractor registration
Applications start in the MyGov public portal: choose the project template, complete the electronic application in full and upload the plans; incomplete applications are returned, and no separate paper application is needed. Contractors register in MyGov before they can pull permits.
- Contractor registration: $90 a year plus the $15 technology fee. Remodel and demolition contractors post a $20,000 surety bond and house movers a $10,000 bond. Electrical contractors provide their Texas master electrician and electrical contractor licences and liability insurance naming the City of Canyon as certificate holder.
- Pre-construction meeting: for commercial projects, call 806-655-5014 (option 6) before submitting so the contractor, designer and City staff can settle design, utility and access issues early.
- Demolition: $90 plus the technology fee; an asbestos survey is required for commercial buildings, and a plumber must cap the sewer line within 5 feet of the property line for inspection before it is covered.
- Solar: plans stamped by a Texas engineer, uploaded as separate PDF pages; the City allows a two-week review.
Canyon permit cost
Fees come from the 2026–2027 Master Schedule of Charges and Fees, adopted June 2, 2026. A $15 technology fee is added to every permit.
Not sure this scope needs a permit?
Get a free quote →| Project | Fee |
|---|---|
| New home | $0.30 per sq ft, $120 minimum, plus $60 for each electrical, plumbing and HVAC permit |
| Residential remodel, addition or accessory building | $0.30 per sq ft, $60 minimum, plus $60 per trade permit |
| Commercial new construction | 0.4% of value ($0.004 × value), $120 minimum, plus $60 per trade permit |
| Commercial remodel, addition or accessory building | 0.4% of value, $60 minimum |
| Commercial plan review | 0.1% of value, credited to the building fee at issuance |
| Re-roof | $60 residential; $70 commercial |
| Pool | $250 residential; $350 commercial |
| Manufactured home installation | $180, including electrical and plumbing |
| Demolition or moving | $90 |
| Fence over 8 feet | $40 |
| Certificate of Occupancy without a building permit | $120 |
| Floodplain development permit | $200 |
For example, a 2,000 sq ft house carries a $600 building fee, plus $180 for the three trade permits and the technology fee. Working without a permit costs twice the permit fee ($250 minimum) the first time and three times ($500 minimum) after that, and skipping a required inspection costs $250, then $500.
Canyon trade permits
On new construction and additions, electrical, plumbing and HVAC are $60 add-ons to the building permit. Work on existing buildings uses these rates, each with a $60 minimum and the $15 technology fee:
Rather talk it over?
Call 1-855-478-4290 →| Permit | Fee |
|---|---|
| Electrical service | $0.003 per amp, $60 minimum |
| Service entrance alteration | $60 |
| Generator, sign or other listed device | $10 each, $60 minimum |
| Construction tap | $20 |
| HVAC equipment change-out | $60 for the first 5 tons, $10 per additional 5 tons |
| Ductwork or piping | $0.02 per sq ft of floor area, $60 minimum |
| Plumbing fixtures | $6 each, $60 minimum |
| Water heater; water, gas or sewer line; lawn sprinkler | $60 each |
| Fire Department construction permit | $80 |
What to submit in MyGov
New home
- Cover sheet with the front elevation
- Site plan matching the plat, with setbacks, easements and finished floor elevation
- Floor plan for each floor with a square footage legend
- Detail sheet with wall sections, insulation values and the applicable table from the 2017 Panhandle Residential Foundation Manual
- Foundation plan following that manual
- Electrical plan, plumbing details and irrigation layout with backflow device
- Roof plan, braced wall plan and the other three elevations
- Manual J and Manual D (or equivalent) HVAC calculations
Commercial
- Completed permit application
- Proof of TDLR accessibility registration for projects of $50,000 or more
- Asbestos survey for existing buildings other than one- and two-family homes and apartments of up to 4 units
- Site, civil, foundation, floor, framing, elevation and MEP plans
- Energy compliance (prescriptive or COMcheck) and landscape plans
- Plans sealed by a Texas architect or engineer where the law requires
Rather not deal with the building department?
Get a free quote →Commercial review takes about 10–15 business days for new buildings and additions or alterations, and 2–10 business days for minor alterations.
Canyon permit application: how to apply step by step
The site plan must match the recorded plat; zoning changes, specific use permits and variances cost $200 each.
Contractors complete MyGov registration, with the bond or licences their trade requires, before applying.
Commercial projects meet City staff first through 806-655-5014, option 6.
Pick the project template, fill in every field and upload the plan set from the residential or commercial checklist.
Planning & Development routes the plans to other departments and returns comments or requests for more information.
Pay the permit fees, then request inspections through Permit & Inspections (806-655-5034).
Inspections in Canyon
Permit & Inspections is at 806-655-5034. A same-day inspection costs $75, inspections after hours or not otherwise listed cost $100, and each re-inspection costs $60. On the City’s solar handout, inspections are done the day after they are scheduled.
- Before the footing inspection: submit a nuclear compaction test data sheet for the building pad, covering every lift down to undisturbed earth, with no lift deeper than 12 inches and the plasticity index listed; web soil surveys are not accepted.
- Before the energy inspection: provide the ICC-ES report for any spray foam insulation.
- Demolition: the capped sewer line is inspected before it is covered, and backfill deeper than 12 inches must be compacted in tested lifts to 95% of maximum density.
Local Canyon details that matter
Design loads: the City gives 115 mph sustained wind and 20 lbs per sq ft of snow as the design loads for the area.
Want this handled start to finish?
Get a free quote →Foundations: residential foundations follow the Panhandle Residential Foundation Manual, which the City posts on its Building Codes page.
Adopted codes: the 2021 International Building, Residential, Mechanical, Plumbing, Fuel Gas, Existing Building and Fire Codes, the 2015 International Energy Conservation Code and the 2023 National Electrical Code.
Solar: Xcel Energy installs the solar meter; if a panel upgrade is part of the job, Xcel must be told it is a solar installation (800-628-2121), otherwise it fits the meter within 10 days of the inspection.
Texas building code
Texas has no single statewide building code: state law makes the International Residential Code the base code for homes in cities and the International Building Code the base for commercial buildings, with each city choosing the edition and its own amendments, while the National Electrical Code and the energy code apply statewide. Outside city limits most counties issue no building permits for homes. Texas building code rules
Canyon official resources
- Canyon Planning & Development permits
- MyGov permit portal and contractor registration
- 2026–2027 Master Fee Schedule
- Adopted building codes
- Work exempt from building permits
- Residential plan submittal checklist
- Commercial plan submittal and review process
- Demolition requirements
- Solar panel installation requirements
Inspections are where schedules slip.
Get a free quote →Canyon permit FAQs
How much is a building permit for a new house in Canyon?
$0.30 per square foot with a $120 minimum, plus $60 for each electrical, plumbing and HVAC permit and a $15 technology fee. A 2,000 sq ft house comes to $600 plus $180 in trade permits.
Do I need a permit for a fence or shed in Canyon?
Not for a fence up to 8 feet tall or a one-story shed of 200 sq ft or less. Taller fences need a $40 permit, and bigger storage buildings need a building permit.
Do I need a permit to re-roof?
Yes. A residential roof permit is $60 and a commercial one $70.
Can I do my own electrical or plumbing repairs?
Yes, on your own homestead, with the permit. Anywhere else, the work must be done by a contractor.
How long does commercial plan review take?
About 10–15 business days for new buildings and most additions, and 2–10 business days for minor alterations.
How do I schedule an inspection?
Contact Permit & Inspections at 806-655-5034. A same-day inspection is available for $75.
Simplify Canyon permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Texas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Canyon sooner?
Let Alliance prepare, file, and track your Canyon permits while your crew stays on the job.
More Texas permitting guides
This guide is provided by Alliance Permitting for general information about Canyon permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.