Dickson, Tennessee Building Permit Guide

Dickson’s Planning and Zoning Department at City Hall issues building and plumbing permits and inspects construction inside the city, with fees set by Ordinance #1540.

Authority: City of Dickson Planning and Zoning DepartmentCode: 2024 I-Codes, 2017 NEC
Authority
City of Dickson Planning and Zoning DepartmentMunicipal building permits
Apply
Online permit applicationOr paper forms at City Hall
Building fee
ICC valuation scaleOrdinance #1540, 2023

Inside the City of Dickson, building permits, plumbing permits and construction inspections are handled by the Planning and Zoning Department at City Hall, 600 East Walnut Street (615-441-9508), where Andy Bowker is the Building Official. Applications can be filed through the City’s online permit form, and fees follow a valuation scale: a 2,000 sq ft house is valued at $355,260 and pays a building permit fee of $2,819. Electrical and mechanical permits are bought elsewhere.

What work requires a permit in Dickson?

The City publishes separate residential and commercial building permit applications. Its fee ordinance and forms show the work it permits:

Planning and Zoning permits

  • New homes, two-family homes and additions
  • Manufactured, modular and mobile home placements
  • Commercial buildings, alterations and changes of occupancy
  • Demolition
  • Plumbing, including sewer and water connections
  • Grading permits and signs

Approvals that come first

  • Driveway permit from Public Works, with culvert sizing approved
  • Erosion controls checked by the Stormwater Coordinator
  • Planning Commission site plan approval for new commercial construction
  • 911 address from the Dickson County E-911 Address Center (615-441-9502)

Who issues permits in Dickson?

The Planning and Zoning Department issues building permits, inspects construction and enforces the City’s health and safety codes. Jason Pilkinton is the Director and Andy Bowker the Building Official. The office is at City Hall, 600 East Walnut Street, Dickson, TN 37055 (615-441-9508).

The City permits only inside its limits. Unincorporated land around Dickson is permitted by Dickson County Planning and Zoning (615-789-6740), which the City’s contact sheet also lists for the county’s Adequate Facilities Tax. Other agencies involved in a Dickson job:

  • Greater Dickson Gas Authority, 605 E Walnut Street (615-441-2830): mechanical permits
  • Dickson Electric System (615-446-9051): sells state electrical permits
  • Water Authority of Dickson County (615-441-4188): backflow prevention and grease interceptors
  • Dickson Fire Department Fire Marshal (615-446-6331): fire and life safety review

Short on time to read all of this?

Get a free quote →

Dickson applications and online filing

The City’s online permit application runs on CitizenPortal, and permit fees can be paid online. The Planning and Zoning page also posts the paper forms:

  • Application for a Residential Building Permit (August 2026 edition): map, group and parcel, contractor and licence number, setbacks, utilities, square footage by area (heated, bonus, basement, garage, carport, porch), and whether the owner is building. Mobile and manufactured units need interior and exterior photos, and an on-site inspection may be required. A permit is void after 6 months if construction has not begun.
  • Application for Commercial Building Permit, with a code analysis sheet covering use group, construction type, fire ratings, sprinklers, occupant load, exits and plumbing fixtures.
  • Affidavit of Exemption, a notarized statement that the applicant is exempt from showing workers’ compensation insurance (sole proprietor with no employees, or an owner working on, or supervising work on, their own property in their county of residence).
  • 911 Address Application, Sign Permit Application and the Demolition Fee and Requirements sheet.

Dickson permit fees

Ordinance #1540, passed on October 2, 2023, adopts the ICC Appendix L fee scale and uses the latest ICC building valuation data to value a project. The residential application values heated living space and bonus rooms at $177.63 per sq ft, and unfinished basements, garages, carports and covered porches at $71.79 per sq ft.

Dickson building permit fees (Ordinance #1540, Appendix L)
ValuationBuilding permit fee
Up to $500$24
$501 to $2,000$24, plus $3 for each extra $100 or part
$2,001 to $40,000$69, plus $11 for each extra $1,000 or part
$40,001 to $100,000$487, plus $9 for each extra $1,000 or part
$100,001 to $500,000$1,027, plus $7 for each extra $1,000 or part
$500,001 to $1,000,000$3,827, plus $5 for each extra $1,000 or part
$1,000,001 to $5,000,000$6,327, plus $3 for each extra $1,000 or part
Over $5,000,000$18,327, plus $1 for each extra $1,000 or part

Not sure this scope needs a permit?

Get a free quote →

Example: 2,000 sq ft of heated space is valued at $355,260, which falls in the $100,001 to $500,000 band: $1,027 plus 256 × $7, a building permit fee of $2,819 before the plumbing permit.

Other Dickson construction fees
ItemFee
Plans review, fire marshal and life safety review10% of the permit fee; the residential form lists a plan review fee only for homes over 3,000 sq ft
Re-inspection after any failed inspection$50
Demolition: one- or two-family home or accessory structure$100
Demolition: any other structure$250
Grading permit2 cents per sq ft of developed area, capped at $5,000 residential, $8,000 commercial, $15,000 industrial
Change of occupancy or in-house floor plan approval$100
Design review; pre-planning or new development review$100 each
Temporary certificate of occupancy request$50
Planning Commission site plan approval$250
Development in a floodplain (extra review)$4,000
Plumbing permit$100 issue fee plus $10 per fixture, plus sewer and water connections

Starting work before the permit is issued costs a penalty equal to the permit fees, paid in full before the permit is released; each further day of work after notice counts as a separate violation. A penalty can be appealed in writing to the Office of Planning and Zoning within 10 business days. The older demolition sheet still lists a flat $100 fee; the 2023 ordinance charges $250 for anything other than a one- or two-family home or accessory building.

Rather talk it over?

Call 1-855-478-4290 →

Electrical, plumbing, mechanical and gas work in Dickson

  • Electrical: Dickson is in the State of Tennessee electrical program, so electrical permits are state permits. The City’s residential application sends applicants to Dickson Electric System (615-446-9051), a state permit issuing agent.
  • Mechanical and gas: mechanical permits are obtained through the Greater Dickson Gas Authority (615-441-2830), whatever the heating and cooling source.
  • Plumbing: a City permit from Planning and Zoning, priced at $100 plus $10 per fixture.
  • Fire: the Fire Marshal reviews plans for new site developments, new or altered commercial buildings and multi-family dwellings, and fire protection systems, and inspects new construction under the 2024 International Fire Code. Plans for that review are still submitted to Planning and Zoning at City Hall, on paper and electronically where possible.

Documents and site work before a Dickson permit

New home (before issuance)

  • Driveway permit application to Public Works; driveway flagged on site and culvert size approved
  • Construction entrance installed
  • Silt fence and other erosion controls placed where the Stormwater Coordinator specifies, then a site visit
  • Sketch and scope of any work in the City right-of-way, grading included
  • Portable restroom on site
  • First permit in a new subdivision: the development finaled by the City Engineer

Commercial

  • Three sets of drawings sealed by a Tennessee registered architect or engineer
  • Planning Commission site plan approval, with 15 folded 11 x 17 copies on a Class 1 boundary survey
  • Engineered SWPPP for 10,000 sq ft or more of developed area
  • Registered design professionals for assembly, educational and institutional buildings or anything over 5,000 sq ft
  • Fire, erosion control and any Board of Zoning Appeals approvals; geotechnical report and special inspections where needed

The Stormwater Residential Checklist adds inlet protection at drains, stabilization of ditches and slopes of 3:1 or steeper, and a concrete washout where needed.

Rather not deal with the building department?

Get a free quote →

How to apply for a Dickson building permit

1. Check the city limits and zoning

Use the City zoning map; land outside the limits goes to Dickson County.

2. Get the address and driveway approval

Apply to the E-911 Address Center for an address and to Public Works for the driveway permit.

3. Install erosion controls

Put in the construction entrance and silt fence, then ask Public Works for the Stormwater Coordinator’s site visit.

4. File the application

Submit online or on paper with the plans; commercial jobs first need Planning Commission site plan approval.

5. Pay and buy the trade permits

Pay the City fees (online payment is available), then get electrical permits from Dickson Electric System and mechanical permits from the Gas Authority.

6. Call for inspections

Planning and Zoning inspects the work; a failed inspection adds a $50 re-inspection fee.

Dickson construction inspections

Building and plumbing inspections are carried out by the Planning and Zoning Department’s Building Official and Building Inspector (department phone 615-441-9508). Electrical inspections are made by the State, the Fire Marshal inspects new construction for fire code compliance, and the Stormwater Coordinator checks erosion controls before a home permit is issued. Every failed inspection costs $50 to re-inspect, and a temporary certificate of occupancy can be requested for $50.

Local Dickson details

Code editions: the City’s 2026 list adopts the 2024 International Building, Residential, Fire, Plumbing, Mechanical, Fuel Gas, Existing Building, Property Maintenance and Energy codes (with 2009 energy tables), the 2017 National Electrical Code, NFPA 101 (2006) and the 2010 ADA standards. The commercial application form still cites the 2018 codes.

Demolition: structures must be razed and the ground stabilized within 30 days for minor residential jobs and 45 days for minor commercial ones; larger projects apply to the Board of Zoning Appeals for a time limit. TDEC approval is needed first where it applies, and one 10-day extension can be requested in writing.

Want this handled start to finish?

Get a free quote →

Zoning and design: the Zoning Ordinance was updated in March 2026, and the City also publishes a 2020 Design Review Manual; design review costs $100.

Floodplain: development in a floodplain carries a $4,000 additional review fee, and the residential application asks whether the lot is in a flood zone.

Tennessee statewide rules

Tennessee licenses contractors through the Board for Licensing Contractors for jobs of $25,000 or more; a Home Improvement licence applies below that only in the nine counties that opted in. Tennessee rules

Official Dickson permit resources

Inspections are where schedules slip.

Get a free quote →

Dickson building permit FAQs

Who issues building permits in Dickson, TN?

The City of Dickson Planning and Zoning Department at City Hall, 600 East Walnut Street, for property inside the city. Dickson County Planning and Zoning handles unincorporated land.

How much is a building permit for a new house in Dickson?

The City values heated space at $177.63 per sq ft and applies the Appendix L scale. A 2,000 sq ft house valued at $355,260 pays $2,819, plus the plumbing permit and any plan review fee.

Where do I get an electrical permit in Dickson?

Electrical permits are state permits; the City directs applicants to Dickson Electric System (615-446-9051).

Who issues mechanical permits in Dickson?

The Greater Dickson Gas Authority (615-441-2830), for both gas and electric heating and cooling systems.

What happens if I start work without a permit?

You pay a penalty equal to the permit fees on top of the fees themselves, and each extra day of work after notice is a separate violation.

How long is a Dickson residential permit good for?

It becomes void if construction has not begun within 6 months of issue.

Simplify Dickson permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Tennessee. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Dickson sooner?

Let Alliance prepare, file, and track your Dickson permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Dickson permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.