Municipal Guide Tennessee Blount County

Blount County Building Permit — Filed & Tracked For You

Everything contractors, builders, and developers need to pull a Blount County building permit — the Department of Development Services in Maryville that takes all construction permits in one office, the state electrical inspector who handles the wiring, the Planning Department development-plan approval that comes before a building permit, and the TVA and Army Corps review that can attach to a dock on Tellico or Fort Loudoun.

Authority: Blount County Development ServicesCodes: Verify current editions with the code officeDistinctive: TVA and Army Corps review for lake docks
Authority
Development ServicesBlount County Development Services, Maryville
Codes
Verify currentThe county directs you to confirm the edition
Planning step
Development planStamped Planning approval before a permit
Shoreline
TVA + Army CorpsDocks on Tellico or Fort Loudoun

The Blount County Department of Development Services, at 1221 McArthur Road in Maryville, is a one-stop building authority for unincorporated Blount County. It directs applicants to verify the current adopted code editions with the code office, requires a stamped Planning development-plan approval before a building permit, and routes electrical to the state electrical inspector.

Two Blount steps sit outside the building counter. The Planning Department reviews all new developments for site matters and issues a stamped, approved development plan that is a prerequisite to the building permit. And because the county fronts Tellico and Fort Loudoun lakes, a boat dock or marina may require review by the Tennessee Valley Authority and the US Army Corps of Engineers on top of the county permit.

Scope: unincorporated Blount County through Development Services. Maryville, Alcoa, Townsend and others permit their own work — Maryville runs its own electrical inspection.

📍

Planning approval and the right code edition come before the permit. The Planning Department's stamped, approved development plan is a prerequisite to the building permit, and the county directs applicants to verify the current adopted code editions with the code office rather than assuming a fixed year. On a lakeside parcel, a dock or marina may add TVA and Army Corps review with their own timelines.

What requires a permit in Blount County?

The Blount County Department of Development Services, at 1221 McArthur Road in Maryville, is the building authority for unincorporated Blount County — the gateway to the Great Smoky Mountains on the south side of Knoxville. It is a one-stop office: it accepts applications for all construction permits, collects fees, issues permits, schedules inspections, maintains the permit record and issues occupancy certificates. Maryville, Alcoa, Townsend, Louisville, Rockford and Friendsville run their own permitting.

On code editions, follow the county's own instruction rather than a fixed year. The county's permitting reference manual lists the 2012 editions of the International Building and Fire Codes and the 2010 ADA standard adopted by resolution in 2014, and then states plainly that amendments and newer editions may have been adopted since and directs applicants to verify the current editions with the code office. So the reliable step is to confirm the adopted set with Development Services before you design. An exempt jurisdiction cannot let its code go stale indefinitely. Under T.C.A. § 68-120-101(b)(5)(A) the adopted edition must stay within seven years of the most current published edition unless the State Fire Marshal approves otherwise. That seven-year band, rather than a single statewide changeover date, is why two Tennessee cities an hour apart can be on different code years and both be compliant.

A Blount County project has a Planning step before the building permit. The Planning Department reviews plans for all new developments — mostly for site matters such as landscaping, signage, traffic patterns and the height, area and location of the building — and a stamped, approved development plan from Planning is required before Development Services issues. And because Blount County fronts Tellico Lake and Fort Loudoun Lake, projects such as boat docks or marinas may require review by the Tennessee Valley Authority and the United States Army Corps of Engineers. Tennessee does not have one permitting model, it has three, and which one applies decides who your building official actually is. A jurisdiction that has adopted codes meeting the state minimum and enforces them is an exempt jurisdiction: it runs its own plan review, permits and inspections, and the state stays out except for state buildings, schools and a handful of licensed occupancies. A jurisdiction that has not is non-exempt, and the State Fire Marshal's Office is the building official there, working through contracted deputy building inspectors who cover several counties each. And a jurisdiction that has passed a two-thirds resolution under T.C.A. § 68-120-101(b)(1)(B) is an opt-out or non-code jurisdiction, where one- and two-family dwellings sit outside the statewide standards altogether.

No political subdivision of Tennessee may adopt or enforce standards of fire prevention, fire protection or building construction that are less stringent than the state minimum. Local amendments can add to the code; they cannot subtract from it.

Permit required

  • New residential and commercial construction, and additions
  • Structural alterations, repairs, and changes of occupancy
  • Accessory structures above the county threshold
  • Swimming pools and their required barriers
  • Decks, and exterior structural work
  • Plumbing, mechanical, and gas work
  • Electrical work — inspected by the state electrical inspector
  • Shoreline docks or marinas — possible TVA and Army Corps review

Typically exempt

  • Painting, flooring, and cosmetic finishes
  • Routine maintenance not altering structure or a regulated system
  • Work inside Maryville, Alcoa, Townsend, or another city
  • Minor work below the county's published thresholds
⚠️ Verify the current code edition, and get the Planning approval first. The county's permitting manual lists 2012-edition codes adopted in 2014 but directs applicants to verify the current editions with the code office, so confirm the adopted set with Development Services before designing. A stamped, approved development plan from the Planning Department is required before a building permit issues, and a lakeside dock may need TVA and Army Corps review.

Blount County building department: who handles permitting

Development Services being a one-stop office is a genuine convenience: one counter takes the application, collects the fee, issues the permit, schedules the inspection, holds the record and issues the certificate of occupancy. Two appeals boards meet to consider variance requests, and a commercial occupancy carries a non-refundable variance fee at application. Lot numbers or the address must be clearly posted at the street entrance or on site, or an inspection can be rejected automatically.

The Planning Department step is the one most likely to be missed by someone used to counties where building and planning are the same queue. Planning reviews every new development for site suitability — landscaping, signage, traffic and the building's height, area and location — and its stamped, approved development plan is a prerequisite to the building permit. Bring that approval to Development Services rather than expecting the building counter to generate it.

The shoreline review is specific to Blount County's geography. With Tellico Lake and Fort Loudoun Lake on its borders, a boat dock, marina or other shoreline structure can fall under the Tennessee Valley Authority's land-use review and the United States Army Corps of Engineers, in addition to the county permit. Those federal and TVA approvals run on their own timelines, so identify them early on any waterfront project.

Blount County permitting contact
DetailInformation
AuthorityBlount County Department of Development Services
CoversUnincorporated Blount County
Cities running their ownMaryville, Alcoa, Townsend, Louisville, Rockford, Friendsville
Office1221 McArthur Road, Maryville, TN 37804
CodesVerify current editions with the code office (manual lists 2012 IBC/IFC, 2010 ADA)
Planning prerequisiteStamped, approved development plan required before a building permit
ElectricalInspected by the state electrical inspector
ShorelineDocks or marinas may require TVA and US Army Corps review
Address postingLot number or address posted at the entrance, or automatic reject
💻

Planning approval and the right code edition come first. A stamped, approved development plan from the Planning Department is a prerequisite to the building permit, and the county directs applicants to verify the current code editions with the code office rather than assuming a fixed year. On a lakeside parcel, a dock or marina may add TVA and Army Corps review.

Confirm from the parcel whether the site is unincorporated Blount County or inside Maryville, Alcoa, Townsend or another city, because the permitting office changes at the city line — and Maryville in particular runs its own electrical inspection, unlike the unincorporated county where electrical is the state's.

Blount County permits: record types and what each covers

Blount County's Development Services runs residential and commercial building records in one office. These are the records you are likely to file:

Residential permit types

Residential permit types in Blount County
Permit typeWhat triggers itReview pathFee basis
New constructionNew dwellings, additions, and accessory structures above the local size thresholdPlan review against the adopted residential code, plus zoning; the state floor is the 2018 IRC with Appendix QValuation-based
AdditionAdded interior space, including additions of thirty square feet or moreStructural and energy review; the thirty square foot interior trigger is smaller than most applicants expectValuation-based
Renovation / alterationStructural changes, layout changes, or added plumbing, mechanical, or electricalPlan review scaled to scope; renovations of existing one- and two-family dwellings sit outside the state minimum standardsValuation-based
ReroofRoof covering replacement, recover, and structural deck repairDeck and dry-in inspection; plan review rarely requiredValuation or squares
Solar photovoltaicRooftop or ground-mount arrays, with or without battery storageStructural review of the attachment locally, with the electrical scope usually permitted and inspected by the stateFlat or system-size based
Battery energy storageWall or floor-mounted storage added to a dwellingElectrical review plus fire separation and location checkFlat or per-permit minimum
ElectricalService changes, panel upgrades, new circuits, EV chargers, and rewiringIn most of Tennessee a state record bought through CORE and inspected by a contracted Deputy Electrical Inspector, not a local onePer-permit or per-device
PlumbingNew piping, repipes, fixtures, gas piping, and water heater replacementTrade review; performed by a licensed plumber or a Limited Licensed Plumber below the contractor thresholdPer-permit minimum or per-fixture
Mechanical / HVACChangeouts, new ductwork, and refrigerationTrade review; the contractor licence attaches once the trade portion reaches the statutory thresholdPer-permit minimum or per-unit
Deck and porchNew decks, screened porches, and structural rebuildsStructural review of footings, ledger attachment, and guardsValuation or flat
Swimming poolIn-ground and above-ground poolsBarrier, bonding, and electrical review; the bonding scope generally follows the state electrical recordValuation or flat
Manufactured home set-upPlacing or re-siting a manufactured homeZoning, floodplain, and anchoring review; manufactured homes sit outside the state minimum building standards but not outside local zoningFlat or per-unit
DemolitionFull or partial demolition of a dwelling or accessory structureUtility disconnect confirmation and site restoration checkFlat
New single-family dwellingBuilding a new home in the unincorporated countyPlanning development plan, then building review; state electricalFee by scope
Lakeside dock or shoreline structureA dock or marina on Tellico or Fort LoudounCounty permit plus possible TVA and Army Corps reviewFee by scope plus federal review

Commercial permit types

Commercial permit types in Blount County
Permit typeWhat triggers itReview pathFee basis
New commercial constructionGround-up commercial, industrial, and institutional buildingsConcurrent review against the adopted building code, fire, and zoning; the state floor is the 2021 IBC with Tennessee amendmentsValuation-based
Tenant improvement / upfitInterior fit-out of an existing tenant spaceBuilding, trade, and life-safety review; accessibility attaches on change of useValuation-based
Change of occupancyConverting a building or space to a different use groupOccupancy classification, egress, and accessibility reviewValuation or flat
Commercial electricalService, distribution, and branch circuit workState record in most jurisdictions unless the municipality is one of the roughly thirty-five authorised to inspect its own electricalPer-permit or valuation
Commercial plumbingProcess piping, fixtures, backflow, and grease wasteTrade review; backflow and grease interceptor sign-off where applicablePer-fixture or valuation
Commercial mechanicalRooftop units, kitchen exhaust and hood systems, and refrigerationTrade review; hood and suppression systems draw fire review alongside mechanicalPer-unit or valuation
Commercial reroofRoof covering replacement on a commercial structureDeck, dry-in, and attachment inspectionValuation or squares
SignageWall, ground, and illuminated signsZoning review for size and placement, plus electrical where illuminatedFlat or per-sign
Land disturbanceClearing, grading, and stormwater-triggering site workErosion and sediment control review, separate from the building permitAcreage-based
Commercial demolitionFull or partial demolition of a commercial structureUtility disconnect, asbestos notification, and site restorationFlat or valuation
State Fire Marshal plans reviewOccupancies requiring State Fire Marshal approval, including schools and certain licensed facilitiesFiled with the state through the plans submittal portal, in addition to and not instead of the local recordState fee schedule
Commercial new constructionA new commercial building in the countyPlanning development plan, then full building reviewFee by scope; commercial variance fee
Variance requestA code variance on a commercial occupancyBoard of Construction Appeals reviewNon-refundable variance fee

Residential

  • Single-discipline review in most cases
  • The electrical record is usually a separate state permit, not a line on the building permit
  • Contractor licence attaches at the statutory threshold; a Home Improvement licence may apply below it in nine counties only
  • Septic properties need TDEC approval before ground is broken

Commercial — multi-discipline

  • Concurrent review across building, trades, fire, and zoning
  • Signed and sealed plans across every affected discipline
  • The licensee's monetary limit caps the job value, separately from the permit
  • Accessibility and life-safety review attach to any change of occupancy

Records you will actually see in Blount County

Blount County record catalog
RecordWhat it covers
Residential building permitNew homes, additions, alterations, and repairs
Commercial building permitCommercial construction and tenant work
Accessory structureAbove the county threshold
Swimming poolWith barrier and bonding review
Plumbing / mechanical / gasTrade permits under the adopted codes
State electrical permitInspected by the state electrical inspector
Shoreline structureDock or marina, with possible TVA and Army Corps review
Demolition permitFull or partial demolition

Solar permits in Blount County

Solar is reviewed on two tracks at once in Tennessee, and in most of the state those two tracks belong to two different governments. The structural side — attachment detail, rail spacing, and whether the existing framing carries the added dead load — is a local building review. The electrical side — conductors, overcurrent protection, rapid shutdown, labelling, and the service or supply-side connection — usually runs on a state electrical record instead, against the National Electrical Code edition the state programme enforces.

A residential solar installation in unincorporated Blount County is a county building permit for the structural attachment plus a state electrical permit for the wiring, since electrical in the unincorporated county is inspected by the state electrical inspector rather than the county. Maryville, by contrast, runs its own electrical inspection, so confirm which authority applies from the parcel. The local power company sets the meter release on an approved electrical inspection, so confirm the interconnection path early.

That split is the most common cause of a stalled Tennessee solar job. An installer who files the building record locally and assumes the electrical inspection comes with it will sit waiting for an inspector who was never booked. Confirm at the outset whether your jurisdiction is one of the roughly thirty-five municipalities authorised to run its own electrical inspections, or whether the electrical permit has to be bought from the state.

Interconnection runs on a third clock. Tennessee is served by the Tennessee Valley Authority through local power companies — municipal electric systems and rural electric cooperatives — and each sets its own application, meter and witness-test sequence. Permission to operate is not something the building department controls, so plan for the tracks to finish at different times.

Roofing permits in Blount County

A roof covering replacement needs a permit in most Tennessee jurisdictions that enforce their own codes. The permit is usually quick, but it is not optional, and the inspection that matters happens before the covering goes on rather than after.

Tennessee has no statewide product-approval database, so there is no approval number to search for or cite on the application. The assembly has to comply with the adopted code and the manufacturer's listed installation instructions, and that pairing is what the inspector checks — which makes the manufacturer's instructions a document worth having on site.

A re-roof in unincorporated Blount County is a county building permit handled through Development Services. A like-for-like replacement is straightforward; adding load or altering the roof structure draws closer review. Post the lot number or address at the street entrance for the inspection, since a missing address can cause an automatic reject, and confirm the current adopted code edition with the code office before you design the assembly.

Sequencing is where reroofs go wrong. The deck and dry-in condition has to be visible when the inspector arrives, so covering it first means opening it back up. Where a previous layer has been torn off, expect attention to deck fastening and to any sheathing replaced along the eaves. Note also that a roofing subcontractor is licensed on the value of the roofing portion alone once that portion reaches the statutory threshold.

Record types, document sets, and fee structures are set by local ordinance and change without notice. Confirm the current catalog against the official portal before you file.

Blount County permit cost

Blount County building permit fees are set by Development Services against the submitted scope, with a non-refundable variance fee charged at application for commercial occupancies. Because electrical is inspected by the state electrical inspector, the electrical cost is a state fee rather than a county line item.

Confirm the current fee basis and the adopted code editions with Development Services before budgeting. On a waterfront project, allow for the separate TVA and Army Corps processes, which carry their own requirements and timelines beyond the county permit.

How Blount County fees are structured
Fee componentHow it works
Building permitSet by Development Services against the submitted scope
Commercial varianceNon-refundable variance fee at application for commercial occupancies
ElectricalState fee via the state electrical inspector, not a county line item
Planning approvalStamped development plan required before the building permit
ShorelineSeparate TVA and Army Corps processes on waterfront parcels
Septic propertiesTDEC approval required before ground is broken
ConfirmFee basis and current code editions with Development Services
🧮

Want a precise number for a specific Blount County project? Send us the scope and we will price the permit path before you file.

Blount County trade permits

Electrical is inspected by the state electrical inspector. Four Blount specifics decide whether your application moves:

Verify the current code edition with the office

The county's permitting manual lists 2012-edition codes adopted in 2014 but directs applicants to verify current editions with the code office, since newer editions or amendments may have been adopted. Confirm the adopted set with Development Services before you design.

Get the Planning development-plan approval first

The Planning Department reviews all new developments for site suitability, and its stamped, approved development plan is required before Development Services issues the building permit. Bring that approval to the building counter rather than expecting it to be generated there.

Electrical is the state's here

In unincorporated Blount County, electrical work is inspected by the state electrical inspector, so the electrical permit is a state record rather than a county one. Maryville, by contrast, runs its own electrical inspection, so confirm which applies from the parcel.

Waterfront docks may need federal review

Because Blount County fronts Tellico and Fort Loudoun lakes, a boat dock or marina may require review by the Tennessee Valley Authority and the US Army Corps of Engineers in addition to the county permit. Identify those approvals early on a waterfront project.

🧢 Tennessee licenses contractors through the Board for Licensing Contractors at the Department of Commerce and Insurance. A licence is required to bid, negotiate or perform construction work where the total contract value including labour and materials is twenty-five thousand dollars or more, under T.C.A. § 62-6-102. The threshold reaches subcontractors on their own portion: electrical, mechanical, plumbing, HVAC and roofing subcontractors need the licence once their share hits the same figure, while masonry subcontractors are licensed at one hundred thousand dollars and above under T.C.A. § 62-6-111(d). One licensing rule that does not apply here is worth stating plainly, because contractors moving across the state assume it does. Tennessee's Home Improvement licence, which covers residential improvement work from three thousand dollars to just under twenty-five thousand, exists only in the nine counties that opted in: Bradley, Davidson, Hamilton, Haywood, Knox, Marion, Robertson, Rutherford and Shelby. This jurisdiction is not among them, so below the twenty-five thousand dollar contractor threshold there is no separate state home improvement credential — though local registration and the trade licences still apply. The trade credentials sit apart from the contractor licence. Electrical work at or above the threshold runs under the contractor licence carrying the CE classification, which covers all electrical categories for residential, commercial and industrial work and is accepted statewide. Below it, Tennessee issues the Limited Licensed Electrician and Limited Licensed Plumber credentials, and local governments may run their own journeyman or master licences for work under twenty-five thousand dollars. Check the local requirement as well as the state one before you bid.

Blount County permit application: how to apply step by step

Here is how to get a building permit in Blount County, from confirming the requirement through to close-out. Each step below corresponds to a real decision point where projects commonly stall.

1. Confirm the parcel is unincorporated Blount County

Maryville, Alcoa, Townsend, Louisville, Rockford and Friendsville permit their own work. Settle jurisdiction from the parcel before you start, and note Maryville runs its own electrical inspection.

2. Verify the current code editions with Development Services

The county directs applicants to confirm the current adopted editions with the code office rather than relying on the dated permitting manual. Do that before you design.

3. Get the Planning development-plan approval

Obtain the Planning Department's stamped, approved development plan, which reviews site matters such as landscaping, signage, traffic and the building's height, area and location, before applying for the building permit.

4. Clear the prerequisites and prepare documents

On a septic property, obtain the TDEC approval first. On a waterfront parcel, identify any TVA and Army Corps review for a dock or marina. Prepare plans and post the lot number or address at the entrance.

5. Apply, clear review, and pay

File with Development Services, clear building review, and pay the fee — including any commercial variance fee. Electrical is inspected by the state electrical inspector on its own track.

6. Schedule inspections and close out

Book county inspections, run the state electrical inspection separately, and carry the project through to the certificate of occupancy before legal use.

Inspections in Blount County

County inspections are scheduled against the issued permit through Development Services, with typical checkpoints running footing and foundation, framing, trade rough-ins, insulation and final. The lot number or address must be posted at the street entrance or on site, or an inspection can be rejected automatically, and Blount County will perform a pressure test on gas work.

Electrical inspections are performed by the state electrical inspector rather than the county, so the electrical final runs on the state's track. The county final and the state electrical final are separate approvals, so confirm both are cleared before expecting an occupancy certificate.

On a waterfront project, the TVA and Army Corps reviews sit outside the county's inspection sequence entirely, with their own approvals. On an existing building, confirm what was previously permitted against what is standing before a change of occupancy, using the Development Services record.

Post the lot number or address at the entrance, or an inspection can be rejected automatically. The electrical final is the state inspector's, separate from the county final — clear both before expecting a certificate of occupancy.

Blount County permit search and official resources

Blount County publishes its Development Services information, code documents and permitting manual online, with the state and federal resources that sit alongside them.

Frequently asked questions

Who issues building permits in Blount County, TN?

The Blount County Department of Development Services, at 1221 McArthur Road in Maryville, for unincorporated Blount County. It is a one-stop office for all construction permits, fees, inspections and occupancy certificates. Maryville, Alcoa, Townsend and the other cities run their own permitting.

Which building code does Blount County enforce?

The county's permitting reference manual lists the 2012 editions of the International Building and Fire Codes and the 2010 ADA standard adopted in 2014, but the county directs applicants to verify the current editions with the code office, since amendments and newer editions may have been adopted. Confirm the adopted set with Development Services before you design.

Do I need Planning approval before a building permit in Blount County?

Yes. The Planning Department reviews all new developments for site matters such as landscaping, signage, traffic and the building's height, area and location, and a stamped, approved development plan from Planning is required before Development Services issues the building permit.

Does Blount County issue electrical permits?

In the unincorporated county, electrical work is inspected by the state electrical inspector, so the electrical permit is a state record rather than a county one. Maryville, by contrast, runs its own electrical inspection, so confirm which applies from the parcel.

Do I need a permit for a boat dock in Blount County?

Possibly more than one. Because Blount County fronts Tellico and Fort Loudoun lakes, a boat dock or marina may require review by the Tennessee Valley Authority and the US Army Corps of Engineers in addition to the county permit. Identify those approvals early, as they run on their own timelines.

Is Blount County a one-stop permitting office?

Largely, yes. The Department of Development Services accepts all construction permit applications, collects fees, issues permits, schedules inspections, maintains the record and issues occupancy certificates. The main separate step is the Planning Department's development-plan approval, which comes first.

Do I need a contractor licence in Blount County?

A Tennessee contractor licence is required to bid or perform work valued at twenty-five thousand dollars or more, including labour and materials, and the same threshold reaches trade subcontractors on their own portion.

Do I need a Home Improvement licence in Blount County?

No. Blount is not one of the nine Tennessee counties that require the Home Improvement licence. Below the twenty-five thousand dollar contractor threshold there is no separate state home improvement credential here, though local registration and trade licences still apply.

Do I need a septic approval before a building permit in Blount County?

On a parcel without public sewer, yes. The state's TDEC subsurface sewage disposal program issues the septic permit, and it must be in hand before the county can issue the building permit. The system is sized to bedroom count.

What happens if the address is not posted at inspection in Blount County?

The lot number or address must be clearly posted at the street entrance or on site. If it is not posted, an inspection can be rejected automatically, so confirm the posting before scheduling to avoid a wasted trip.

Does Blount County check my HOA covenants?

No. Deed restrictions, covenants and subdivision regulations are private matters between the owner and the subdivision. A permit that clears the county can still breach a covenant, and the county will not have checked.

Does Maryville use the same permitting office as Blount County?

No. Maryville, Alcoa, Townsend, Louisville, Rockford and Friendsville run their own permitting inside their limits, and Maryville has its own electrical inspection. Confirm the parcel is in unincorporated Blount County before filing with Development Services.

Simplify Blount County permitting with Alliance Permitting

Blount County's one-stop Development Services, its verify-current-editions instruction, its Planning development-plan prerequisite and its lakeside TVA and Army Corps review reward applicants who confirm the code year, clear Planning first, and identify any shoreline approvals early.

250K+Permits approved
All 50States covered
21 YearsJurisdictional depth
Done-for-youWe file, you build

Trusted by leading builders, developers, and national contractors — 21 years of filing in the jurisdictions we write about.

Contractors and builders choose Alliance for Blount County because the work is done by people who have stood at the counter:

  • Right authority — unincorporated county or one of the Blount cities, resolved from the parcel, with Maryville's own electrical noted.
  • Current editions confirmed — the adopted code set verified with the code office rather than assumed from the dated manual.
  • Planning cleared first — the stamped, approved development plan in hand before the building permit.
  • Shoreline handled — any TVA and Army Corps review for a dock or marina identified and sequenced early.

Alliance Permitting is a permit documentation and expediting service in Tennessee. We are not a law firm and do not provide legal advice, and we are not the permitting authority.

Ready to break ground in Blount County sooner?

Let Alliance prepare, file, and track your Blount County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Blount County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.