In Warr Acres, the City Building Inspector’s office at City Hall, 4301 N. Ann Arbor Ave. (405-789-2892), reviews plans and issues building, electrical, mechanical and plumbing permits. On the fee sheet the City posted in May 2026 (the Council set fees by resolution on May 19 and re-adopted the schedule on August 18, 2026), a new house is charged $0.18 per square foot plus a $50 plan review fee paid when the plans are submitted.
What needs a permit in Warr Acres?
City Code Sec. 19.52.010 makes it a violation to build, alter, move or improve a building, or to change the use of land or a building, without a building permit or certificate of occupancy. Contractors also need a work permit for each plumbing, mechanical, electrical, fence, general building, pool or roofing job (Sec. 5.04.430). The City’s forms and fee sheet cover:
Homes
- New houses and additions
- Remodels, repairs and alterations
- Accessory buildings, portable buildings and carports
- Fences and driveways
- Pools and storm shelters
- Re-roofing
- Solar installations
Businesses
- New buildings, additions and remodels
- Accessory buildings and paving
- Signs and temporary signs
- Fire sprinkler and alarm work (reviewed by a third party)
- Certificate of occupancy for a change of use or after six months’ vacancy
Who issues permits in Warr Acres?
The City Inspector’s office reviews building plans, approves permits and inspects buildings for change of use and occupancy. Michael Zimmerman is the City Building Inspector. For new construction, changes of use and variances, the inspector works with the Planning Commission, and some projects go on to the City Council. The State Fire Marshal lists Warr Acres among the cities that do their own plan review, permitting and inspections, and Oklahoma County Planning has no role inside the city.
| Office | Contact |
|---|---|
| City Building Inspector | (405) 789-2892; fax (405) 787-5432; buildinginspector@warracres-ok.gov |
| City Hall | 4301 N. Ann Arbor Ave., Warr Acres, OK 73122; Monday to Friday, 8 a.m. to 5 p.m.; closed federal holidays |
| Floodplain administrator | (405) 470-7713 (state floodplain list) |
Short on time to read all of this?
Get a free quote →Forms and contractor registration
Permits are applied for at City Hall on the City’s forms, posted on its Construction Forms page: residential and commercial building permits, contractor registration and contractor permit applications, and separate roofing, fence, driveway paving, easement, sign, temporary sign and solar permits.
Electrical, mechanical and plumbing contractors register their state licences with the City before starting work, and concrete, roofing, sign, solar, fire alarm and fire sprinkler contractors must register as well. The registration form asks for copies of the state licence, a driver’s licence and insurance, plus a Warr Acres business licence number.
Plans may be drawn by the contractor or owner for homes up to two stories if they meet every requirement, though a home designer is preferred; commercial work usually needs an architect or engineer. A permit that is denied can be appealed to the Board of Adjustment within 30 days.
Warr Acres permit fees
The City Council set permit fees by resolution on May 19, 2026 and re-adopted the full schedule on August 18, 2026, removing the lower renewal fees for electrical, plumbing and mechanical registrations. The figures below are from the City’s posted fee sheet, dated May 2026.
| Project | Fee |
|---|---|
| New house or addition | $0.18 per sq ft, $40 minimum |
| Remodel, repair or alteration | $0.10 per sq ft, $40 minimum |
| Residential plan review | $50, due when plans are submitted |
| Accessory building | $0.10 per sq ft, $40 minimum, plus $30 plan review |
| Portable accessory building; fence; driveway | $40 each |
| Swimming pool | $70 plus $30 plan review |
| Re-roofing | $50 |
| Electrical / plumbing, new house | $0.15 per sq ft each, $40 minimum |
| Mechanical, new house | $0.07 per sq ft, $40 minimum |
| Development services technology fee | $15 |
| State and city (OUBCC) fee | $4.50 |
Not sure this scope needs a permit?
Get a free quote →For example, a 2,000 sq ft new house has a $360 building permit and a $50 plan review fee, before the trade permits and the per-permit charges. Commercial rates are higher: $0.25 per sq ft for new buildings, $0.15 for remodels and a $100 plan review fee. A sewer tap is $500; water taps are handled by Oklahoma City.
Working without a permit doubles the permit fee, and failing to call for a required inspection costs $100 a day until it is requested. Residents who cannot afford a fee can apply for a hardship permit, reviewed by the Mayor and the Building Official.
Trade permits and contractor licences
Trade permits are issued by the same office, and fire sprinkler and alarm permits and reviews are handled by a third party.
Homeowners: on August 18, 2026 the City Council amended City Code Sec. 5.04.420 so that a person who is exempt from state licensing, such as an owner working on the house he or she lives in, does not need a City licence for residential plumbing, heat and air or electrical work. The permit and inspections are still required, and the exemption does not cover rental houses or other people’s homes.
| Permit | Fee |
|---|---|
| Electrical remodel (residential) | $0.10 per sq ft, $40 minimum |
| Temporary pole; electrical service change | $40; $60 |
| Residential solar (plan review required) | $100 |
| Heat or air unit change-out | $60 per unit |
| Water heater change-out | $60 |
| Water, sewer or gas service replacement | $40 each |
| Electrical, plumbing or mechanical contractor registration | $150 a year (expires July 31) |
| General, fence, roofing, paving or pool contractor business licence | $60 a year |
Rather talk it over?
Call 1-855-478-4290 →What to submit for a house
- The residential building permit application, with each subcontractor’s state CIB licence number
- Two paper copies and one digital copy of scaled construction documents
- Plans showing all four elevations, the footing and foundation plan, floor, ceiling joist and rafter plans, and floor plans with mechanical, electrical and plumbing layouts
- A plot plan with lot dimensions and square footage, existing and new structures and front, side and rear setbacks
- A boundary survey by an Oklahoma licensed surveyor, when required
- A grading plan and site development plan (City Code Sec. 19.52.040)
Commercial applications add civil and fire protection plans, a footing and foundation plan sealed by an Oklahoma engineer, and a fire sign-off on the application. The City examines applications within 10 working days of receipt.
How to get a Warr Acres building permit
Call City Hall to find out whether the work needs a permit, an inspection or Planning Commission review.
Trade and specialty contractors register their licences with the City first.
Two paper sets and one digital set, with a plot plan, grading plan and any survey.
File the application at City Hall with the plan review fee.
Once approved, pay the permit and per-permit fees before work starts.
Start within six months and call for each inspection as the work reaches it.
Rather not deal with the building department?
Get a free quote →Inspections in Warr Acres
All contractor work must be inspected and approved by the City Building Inspector or another qualified inspector the Mayor appoints, and the City will not inspect work done without a permit. On August 18, 2026 the City Council authorized the Mayor to contract with Town Square Building Codes for building code inspection services, replacing the City’s earlier inspection contract. A re-inspection is $50, a second re-inspection of the same item $100, and an extra or partial inspection $40.
Permit time limits: a permit expires if work does not start within six months or stops for more than six months. City staff can grant one six-month extension if it is requested before the permit expires; a late request or a second extension goes to the Planning Commission. Jobs of 4,000 sq ft or less must be finished within 12 months. A temporary certificate of occupancy can be issued when only non-code finishing work, which can be completed within 30 days, remains.
Local Warr Acres details
Building codes: on May 19, 2026 the City Council adopted the most recent International Building, Existing Building, Residential, Fire, Mechanical, Plumbing and Property Maintenance Codes and the National Electrical Code, with the City’s own amendments adopted by resolution the same night (City Code Sec. 16.04.010).
Fences: in the FE, R-1 and R-2 districts, side and rear fences may be up to 8 ft tall; a fence in the front setback must be see-through and no taller than 4 ft, apart from one exception for side-yard fences on lots that back onto a neighbor’s rear lot line. No fence may sit in a street-corner sight triangle or on City right-of-way, and the permit needs a plot plan.
Roofing: roofers need City registration and a roof permit before starting, must replace damaged flashing, roof jacks and storm collars, and leave any damaged gas vent flues to a registered mechanical contractor.
Planning Commission: uses listed as “subject to review” in a zoning district need Planning Commission review before a permit for new construction, moving or structural alteration.
Want this handled start to finish?
Get a free quote →Oklahoma building code
Oklahoma sets statewide minimum codes (the 2024 editions since September 14, 2026) that cities enforce and may strengthen; most counties issue no building permits for unincorporated land, though a few do. Oklahoma rules
Official Warr Acres permit resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
- Warr Acres contractor and building permits
- Warr Acres construction forms
- Warr Acres 2026 permit fees and licences
- Warr Acres residential building permit application
- Warr Acres commercial building permit application
- Warr Acres City Council minutes, May 19, 2026
- Warr Acres Code, Title 16: Buildings and Construction
- Warr Acres Code, Chapter 19.52: Building Permits and Certificates of Occupancy
- Warr Acres Code, Sec. 5.04.430: contractor work permits
- Oklahoma Water Resources Board floodplain administrators
Inspections are where schedules slip.
Get a free quote →Warr Acres permit FAQs
How much is a building permit for a new house in Warr Acres?
$0.18 per square foot with a $40 minimum, plus a $50 plan review fee due at submission, on the City’s May 2026 fee sheet. A 2,000 sq ft house is $360 plus $50 before trade permits.
How long does the City take to review an application?
City Code Sec. 19.52.030 has the City examine an application within 10 working days; projects that need Planning Commission review take longer.
Can a homeowner draw the plans?
Yes for a home of up to two stories, as long as the plans meet every requirement; the City prefers a home designer.
Do I need a permit for a fence in Warr Acres?
Yes for a new fence, or when 25% or more of a front, side or rear fence is replaced within 12 months. A residential fence permit is $40, and the application needs a plot plan; side and rear fences in the FE, R-1 and R-2 districts may be up to 8 ft tall.
Can I do my own electrical, plumbing or mechanical work?
Yes on the house you live in, where state law exempts you from a licence (City Code Sec. 5.04.420 as amended on August 18, 2026); you still need the permit and the inspections.
What happens if I start without a permit?
The permit fee is doubled and a fine may follow.
Who do I call about a permit?
The City Building Inspector at (405) 789-2892, or email buildinginspector@warracres-ok.gov.
Simplify Warr Acres permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Oklahoma. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Warr Acres sooner?
Let Alliance prepare, file, and track your Warr Acres permits while your crew stays on the job.