University Heights runs its own Building Department, which issues building, electrical, plumbing and HVAC permits from 3962 Silsby Road next to City Hall (216-932-7800); Bill Bartley is the Chief Building Official. The city contracts its building official, inspection and plan review services to SAFEbuilt Ohio, and fees follow Chapter 1424 as rewritten by Ordinance 2024-02: a new house costs $350 plus 15 cents per square foot, plus 1%.
What requires a building permit in University Heights?
The city requires a permit before any construction, alteration, addition or demolition of a building or accessory structure, and its Building Department FAQ lists 28 everyday jobs that need one. The list reaches small jobs too, such as replacing a door, a driveway apron, a garage floor or a hot water heater.
Exterior and site work
- Roofing, siding, doors and window replacement
- Decks, patios, sheds, detached garages and new structures
- Fences, including replacement fences
- Driveways, aprons, service walks and public sidewalks
- Waterproofing and storm or sewer laterals
Inside the house
- Additions and remodeling of any part of the structure
- Furnace, boiler and air conditioner replacement
- Hot water heaters and plumbing alterations
- Electrical service, panel upgrades, rewiring and added switches, outlets or fixtures
- Underground or overhead wiring to a garage
The FAQ adds that other jobs may also need a permit and asks owners to check before starting. Homeowners are also told to confirm that a contractor has both the permit and a city registration before letting work begin.
What University Heights decides and what the state holds
The construction codes are Ohio’s. University Heights decides its permit list, the fees in Chapter 1424, contractor registration, fence and zoning rules (Chapter 1448 for fences), architectural review, and its housing programs, including point-of-sale inspections. A draft rewrite of the zoning code was presented at a public zoning meeting on November 4, 2026; it is a proposal, so the current code still governs. The Board of Building Standards look-up map shows the certified department for an address.
University Heights building department: who handles permitting
Permits come from the city’s Building Department, but much of the work is done under contract. Ordinance 2024-02 describes SafeBuilt as the city’s third-party vendor providing Building Commissioner and Chief Building Official services, and on April 7, 2025 Council unanimously approved Resolution 2025-14, a new professional services agreement with SAFEbuilt Ohio, LLC for building official, inspection, plan review, code enforcement, permit technician and related services after the earlier agreement ran out on March 31, 2025. The agreement in the council packet runs five years. The city now employs its housing inspector directly.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Counter | Building Department, 3962 Silsby Road, next to the City Hall parking lot |
| Mailing address | Building Department, 2300 Warrensville Center Road, University Heights, OH 44118 |
| Phone | 216-932-7800; Chief Building Official ext. 226; permit technician ext. 228 |
| Hours | Monday to Friday, 8:30 a.m. to 4:30 p.m. (the fence handout gives 8 a.m. to 4:30 p.m.) |
| Chief Building Official | Bill Bartley |
| Payment | Cash or check; credit and debit cards in person only |
| Online | Citizenserve, including contractor registration |
The county’s Division of Building Standards, started in 2025, has not said which communities it will serve, and nothing on the city’s pages points University Heights permits there; see the Cuyahoga County guide.
University Heights permit types
The Forms & Information page holds separate applications for residential and commercial work, a general permit form, HVAC, dumpsters and signs, plus specification sheets for decks, railings, concrete aprons and drives, drywall, garages, solar and EV charging. Sample kitchen and bathroom sketches show the level of drawing expected for a remodel. A dumpster placed for a job needs its own dumpster permit, political and for-sale signs have a separate sign form, and a permit holder who needs more time files the city’s extension request form.
Residential permits
- New structure, addition or alteration: one application, ticked as a homeowner or contractor permit, with plans; plan review is charged separately for new houses and for additions, decks and garages.
- Homeowner permits: an owner who lives in the house as a primary residence and does the work personally signs a notarized Homeowner Affidavit, takes responsibility for inspections, and must have the permit voided if a contractor is later hired.
- Fences: a permit is needed even to replace a fence, with a legal survey; fences may be 6 feet high but not forward of the rear foundation line, gates no higher than 5 feet, and driveway gates must be ornamental iron or wood.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial jobs use the New Structure, Addition, Alteration or Change of Use application. Plan review is priced by discipline (structural, mechanical, electrical, plumbing, fire suppression and fire alarm), each with a $200 base fee plus a square-foot charge, and re-review is billed hourly. A new commercial structure also carries a $2,000 engineering deposit and a $500 sewer service line deposit.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Architectural Review Board: new buildings and additions to existing ones go to the ARB, which meets on the second Thursday of the month at Wiley Middle School, 2181 Miramar Boulevard. File two weeks ahead with seven sets of color drawings, the building permit application and a $100 fee; later changes to window placement, roof line or detail need a new ARB review.
- Board of Zoning Appeals: you need a denied permit application first. File three weeks ahead; the variance fee is $50 and a special permit costs $150 in residential districts or $300 elsewhere. The board meets at 8 a.m. on the second Wednesday at Wiley Middle School, and no permit can issue until 10 days after the hearing.
- Right-of-way and new homes: a new house carries an $800 engineering deposit, a $2,000 right-of-way deposit and a $500 park fee.
University Heights permit costs and fees
Fees are set by Chapter 1424 of the Codified Ordinances, rewritten by Ordinance 2024-02 (passed January 16, 2024) on the recommendation of SafeBuilt. Ordinance 2024-08 (passed March 4, 2024, effective back to January 16) corrected the commercial valuation fee from 5% to 2% of project value. Residential totals add the 1% Board of Building Standards fee; commercial totals add 3%.
| Permit | Fee |
|---|---|
| Residential new construction | $350 + $0.15 per sq ft |
| Residential addition or alteration | $250 + $0.15 per sq ft |
| Foundation only / house demolition / interior demolition | $200 / $250 / $75 |
| Garage, accessory building or deck | $200 + $0.09 per sq ft |
| Roofing or siding / window or door replacement | $100 / $50 |
| Fence / retaining wall / driveway / apron | $50 / $75 / $75 / $50 |
| Residential plan review, new house | $100 structural; $50 each for mechanical, electrical, plumbing, fire suppression, fire alarm |
| Residential plan review, additions, decks, garages | $50 structural; $35 for each other discipline |
| Pool / hot tub / waterproofing / grading | $250 / $100 / $125 / $60 (residential) |
| Fire alarm / fire suppression, residential | $125 + $1.50 per device or per head |
| Lawn sprinkler / temporary structure / tent (residential) | $50 / $150 / $75 |
| Occupancy, new dwelling / addition over 750 sq ft | $150 / $75 |
| Commercial new construction / addition / alteration | $450 / $250 / $175 + 2% of project value |
| Commercial plan review | $200 base per discipline + $0.08 per sq ft structural or $0.05 for other disciplines; re-review $105 per hour |
| Commercial signs | $75 under 24 sq ft; $100 from 24 to 48 sq ft; $150 over 48 sq ft |
| Commercial deposits | Demolition $1,000; site work only $1,000; right-of-way $2,000; park fee $500 |
| Re-inspection | $75 residential; $100 commercial |
| Work started without a permit | Double the permit fee |
Rather talk it over?
Call 1-855-478-4290 →Worked examples using the ordinance’s rates: a 400-square-foot house addition is $250 plus 400 × $0.15 ($60), or $310, plus 1% ($3.10), for $313.10 before plan review and trade permits. A commercial alteration valued at $100,000 is $175 plus 2% ($2,000), or $2,175, plus 3% ($65.25), for $2,240.25.
Trade permits and who may pull them
Trade permits follow the same Chapter 1424 tables. Electricians, plumbers and HVAC, refrigeration, fire protection and hydronics contractors must show their Ohio license to register with the city, and the state licenses those trades for commercial work through the OCILB.
| Permit | Fee |
|---|---|
| Electrical, new house | $150 + $0.08 per sq ft |
| Electrical, addition or alteration | $100 + $0.08 per sq ft; panels $75 each; generator $200; solar $150 |
| Plumbing, new house | $150 + $0.06 per sq ft, plus $25 per fixture |
| Plumbing items | Water heater $75; each water, sanitary or storm connection or lateral $100; gas line $50 |
| HVAC, new house | $150 + $0.06 per sq ft, plus $100 per heating or air-conditioning unit |
| HVAC, alteration or replacement | $100 + $0.06 per sq ft; solar or geothermal $150 |
Contractor registration. The application fee is $150, plus $150 for each extra trade. Contractors file a signed contractor agreement under Section 1321.01(a), an original $10,000 surety bond with power of attorney, and a liability certificate naming the city as certificate holder. Registration can start on Citizenserve, but the city does not issue it until the original bond arrives. Commercial trade work is charged on the commercial tables: for example, $250 plus $0.10 per square foot for new electrical, plumbing or HVAC systems.
Rather not deal with the building department?
Get a free quote →How to apply for a University Heights building permit
Use the FAQ list and fence or garage handouts; ask the department about corner lots and setbacks.
Contractors register with an original bond; an owner doing the work signs the notarized Homeowner Affidavit.
New buildings and additions go to the ARB; a denied permit can be taken to the BZA.
Use the residential or commercial form with plans and a survey or site drawing, at Silsby Road or through Citizenserve.
Permit, plan review and any deposits, by cash or check, or card at the counter.
Call the department to arrange each inspection; the fence handout asks for at least 24 hours’ notice.
Review, corrections and what causes delay
The city does not publish review times. Board calendars set the pace for exterior work: ARB packets are due by the last Thursday of the month, and a BZA case adds a 10-day waiting period after the hearing before any permit. Starting work before the permit doubles the fee, and a false statement on the homeowner affidavit is a first-degree misdemeanor.
Inspections and certificates in University Heights
The Building Department arranges inspections of work and materials. The fence handout gives the pattern: a post-hole inspection with at least 24 hours’ notice, then a final once the fence is up, with posts set in concrete at least 30 inches deep and facing inward toward the owner’s lot. Re-inspections cost $75 on residential work and $100 on commercial work.
A new house needs an occupancy permit ($150), and an addition over 750 square feet needs its own ($75); commercial occupancy and use is $150. The Housing Department, in the same Silsby Road building, separately runs point-of-sale inspections, rental and vacant building registration and the exterior maintenance program, with fees payable by card only at the counter. Short-term rentals have their own ordinance (2024-42) and an application the Housing Department updated in August 2026.
Ohio building code in University Heights
FEMA’s Community Status Book lists University Heights (community 390133) as a participating National Flood Insurance Program community and shows no special flood hazard area mapped within the city.
Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
University Heights permit search and official resources
Applications filed online can be followed in Citizenserve. For older permits, inspection records and plans, file the city’s information request form, and check the registered contractor list (updated May 5, 2026) before hiring.
Want this handled start to finish?
Get a free quote →- University Heights Building Department
- Building forms and information
- Building Department FAQ: projects that need a permit
- Ordinance 2024-02, Chapter 1424 permits and fees
- Ordinance 2024-08, commercial valuation fee correction
- Residential permit fee schedule
- Commercial permit fee schedule
- Contractor registration packet
- Registered contractors, updated May 5, 2026
- Homeowner affidavit
- Fence information and permit application
- Board of Zoning Appeals application
- Architectural Review Board application
- Public records information request form
- Council minutes, April 7, 2025 (SAFEbuilt agreement)
- Housing Department
- Ohio BBS building department look-up
- Ohio Board of Building Standards
- FEMA Community Status Book, Ohio
Inspections are where schedules slip.
Get a free quote →University Heights building permit FAQs
Do I need a permit to replace a water heater or furnace in University Heights?
Yes. Hot water heaters, furnaces, boilers and air conditioners are all on the city’s permit list, as are doors, windows, roofs and siding.
Who runs the Building Department?
The city issues the permits; its building official, inspection and plan review services are provided by SAFEbuilt Ohio under an agreement Council approved on April 7, 2025.
How much does a building permit for an addition cost?
$250 plus $0.15 per square foot, plus 1%; a 400-square-foot addition comes to $313.10 before plan review and trade permits.
Can a homeowner pull a permit?
Yes, for work the owner personally does on the house they live in as a primary residence, by signing the notarized Homeowner Affidavit.
How high can a fence be?
Up to 6 feet, kept behind the rear foundation line of the house, with gates no higher than 5 feet; even a replacement fence needs a permit.
What does contractor registration cost?
$150, plus $150 for each added trade, with an original $10,000 bond and insurance naming the city as certificate holder.
When does the Board of Zoning Appeals meet?
At 8 a.m. on the second Wednesday of the month at Wiley Middle School; applications are due three weeks before, and permits wait 10 days after approval.
Simplify University Heights permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in University Heights sooner?
Let Alliance prepare, file, and track your University Heights permits while your crew stays on the job.
More Ohio permitting guides
Cuyahoga County
Read guide →Warrensville Heights
Read guide →Westlake
Read guide →Upper Arlington Building Permit Guide
Read guide →Van Wert Building Permit Guide
Read guide →Van Wert County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about University Heights permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.