Inside Ravenna, permits come from the city’s own Building Department at 530 North Freedom Street (330-296-5666), which covers new construction, repairs, upgrades and additions, including the electrical, plumbing and heating work that goes with them. Fees are flat amounts under Ordinance 2020-006: a new house under 2,000 square feet is $300, and every contractor on the job registers with the city for $100.
What requires a building permit in Ravenna?
The Building Department’s permit page lists the work it most often sees and asks owners to call when they are unsure. Working without a needed permit can bring a stop-work order, delays or fines.
Permit required (city examples)
- New homes, garages and commercial buildings
- Additions to houses and commercial buildings
- New decks and porches
- New roofs and new siding
- Major electrical repairs or updates
- Major heating and air-conditioning repairs or updates
- Demolition, signs, fences, pools and driveways or curb cuts (each has a fee in the schedule)
Exempt list the city posts
- Small one-story detached sheds and playhouses within the code’s area limit
- Fences not over six feet high
- Retaining walls up to four feet that hold back no surcharge
- Decks of 200 square feet or less, no more than 30 inches above grade, not attached and not serving the required exit door
- Painting, papering, tiling, carpeting, cabinets and counter tops
- Playground equipment and small window awnings
Even where the building code exempts a job, Ravenna’s fee schedule still lists separate permits for fences, siding, sheds and driveways, and its newer fence code applies, so call the department before ordering materials. Work in the public right-of-way needs a right-of-way work permit.
What Ravenna decides and what the state holds
Ohio sets the building standards. Ravenna decides its permit fees (Ordinance 2020-006, codified in Sections 1422.01 to 1422.13), registers contractors, runs its zoning code and Board of Zoning Appeals, reviews work in its historic district, inspects rental housing and sets water, sewer and engineering charges. The department also employs a property maintenance official who enforces the city’s maintenance rules after construction.
Ravenna building department: who handles permitting
The Building Department shares its office and staff with the city’s Engineering Department at 530 North Freedom Street. Residential permits are approved by the city’s residential building official. Commercial projects are filed on an application for a certificate of plan approval that passes through City Engineer approval and then to a plan examiner.
Short on time to read all of this?
Get a free quote →| Item | Detail |
|---|---|
| Office | Building Department, 530 North Freedom Street, P.O. Box 1215, Ravenna, OH 44266 |
| Phone / fax | 330-296-5666 (forms also list 330-296-5607) / 330-296-1280 |
| Hours | Monday to Friday, 7:30 a.m. to 4:00 p.m.; closed noon to 1 p.m. and on major holidays |
| Official zoning code copy | Office of the City Engineer, same address |
| Clerk of Council (ordinances) | 210 Park Way; 330-297-2155 |
| Plumbing | City Building Department (not the county health district) |
The Portage County Combined General Health District says plumbing information and inspections in Ravenna, as in Aurora, Kent and Streetsboro, come from the city rather than the county program.
Ravenna permit types
Ravenna works from printable applications posted on its permits page; each trade has its own form showing the fee from Ordinance 2020-006 and the state surcharge.
Residential permits
- Residential building application for new homes, additions, alterations, repairs, siding, moving and demolition. It asks for floor area, foundation, setbacks to property lines and the street right-of-way, and whether the house connects to sewer or septic. The permit must be posted on the street side of the site and is valid for 365 days.
- Re-roof application: tear-off is required where there are already two or more layers or the roof is water-soaked, and ice guard must run to 24 inches inside the exterior wall line.
- Electrical, HVAC and plumbing applications are filed by the contractor for each trade.
- Sample sheets for decks, pole barns, house additions, pool wiring and site plans show what drawings the department expects.
- Rental housing: the Building Department monitors and inspects all rental properties in the city using its rental housing application and inspection checklist.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial, industrial and multi-family projects use the commercial building application, one per building, with plans prepared by an Ohio-registered architect or engineer. The form asks for the existing and new use groups, construction class, floor areas by story, exits, travel distance, sprinkler coverage, parking and accessibility. Fees combine a base amount with a square-foot charge, plus plan examination at $100 and $75 an hour.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning: the zoning code is posted through American Legal, and the official copy is kept at the Office of the City Engineer. Development is also subject to the city’s riparian and wetland setback map.
- Planning and Zoning Commission: $100 fee and ten copies of a preliminary plan (an eleventh if more than one acre will be disturbed). It usually meets at 6:00 p.m. on the last Tuesday of the month in City Hall Council Chambers; file at least ten days before the meeting, and expect the proposal to be held under advisement for a month before a vote.
- Board of Zoning Appeals: $100 variance application under Section 1264; the board meets at the call of its chairperson (agendas posted for January 27, March 31 and May 26, 2026).
- Historic district: the district runs about a mile along Main Street. A Design Review Application needs the building official’s approval of the plans, two color photos of each wall, material and color samples, and Shade Tree Commission approval for landscaping.
- Utilities: water, sanitary and storm taps are made by licensed tappers with a $10,000 performance bond.
Ravenna permit costs and fees
Building, trade and miscellaneous permit fees are set by Ordinance 2020-006, Exhibit A, which the Building Department posts as its current fee schedule. Each trade form adds the state surcharge: 1% on residential permits and 3% on commercial permits.
| Work | Fee |
|---|---|
| New home under 2,000 / 3,000 / 4,000 sq ft | $300 / $350 / $450 |
| Multifamily up to three units | $300, plus $100 per additional unit |
| Garage / shed | $75 plus zoning costs / $50 |
| Residential addition, alteration or repair | $75, plus $75 plan review for additions and garages |
| New commercial structure | $250 + $0.06 per sq ft; plan exam $100 + $75 per hour |
| Commercial addition, alteration or repair | $200 + $0.05 per sq ft; plan exam $100 + $75 per hour |
| Electrical: new home / remodel or new service | $125 / $60 |
| Electrical: commercial | $225 base + $0.05 per sq ft for new construction |
| Plumbing: residential / commercial | $60 + $10 per fixture / $150 base |
| HVAC: new home / remodel / commercial | $100 / $80 + $0.05 per sq ft / $175 + $0.05 per sq ft |
| Demolition: house / garage / commercial | $50 / $15 / $200 |
| Driveway / curb cut | $50 for the first 1,000 sq ft + $15 each extra 1,000 / $50 |
| Fence / siding / reroof / deck or porch without roof | $35 / $35 / $50 / $70 |
| Pool | $35, plus $25 plumbing and $30 electric |
| Re-inspection (after two) / permit extension | $50 / $125 |
| Contractor registration | $100 |
Rather talk it over?
Call 1-855-478-4290 →Worked example from the schedule: a 2,400-square-foot new house falls in the “under 3,000” band, so the building permit is $350; add $125 for electrical, $100 for HVAC and $60 plus $10 a fixture for plumbing (10 fixtures make $160). The $735 subtotal plus the 1% state surcharge comes to $742.35. The re-roof form shows the surcharge built in: $50.50 for a house and $206 for a commercial roof.
Engineering charges are separate: a sanitary sewer tap-in is $2,000 per equivalent single-family home, a storm tap-in $100 per address, residential site plan review $100 (1% of site improvements for commercial and industrial work), and a 5/8-inch water meter $499.29 inside the city in 2026. Sewer and water inspections are $100 for the first two hours, with the city’s rate after that. A roadway work permit for anything in the public right-of-way carries no charge at present, though the city may ask for a bond and inspection costs, and a geothermal well costs $125 plus $25 a year.
Trade permits and who may pull them
Electrical, plumbing and heating and air-conditioning permits are issued by the Building Department on separate forms, each signed by the contractor doing that work. Plumbing is a city permit in Ravenna, not a county health district permit.
- Contractor registration costs $100 per application year (new or renewal) and covers electricians, fire suppression, HVAC, plumbers, utility tappers and general contractors. It needs liability insurance of at least $100,000 per person, $300,000 per occurrence for bodily injury and $100,000 for property damage, with the city named as additional insured and certificate holder, plus proof of state registration for the trade and work references.
- Utility tappers also file the water, sanitary and storm tappers application and a $10,000 performance bond; the tapping license is $100 a year.
- Plumbing: underground piping must be left uncovered and water-tested before you call for the inspection, and all tests must be in place at the inspection.
- State licenses: commercial electrical, HVAC, hydronics, plumbing and refrigeration contractors need the Ohio Construction Industry Licensing Board license; Ohio licenses no general or residential contractors.
Rather not deal with the building department?
Get a free quote →How to apply for a Ravenna building permit
Look up the zoning, riparian setback and historic district maps, or ask the City Engineer’s office.
Each contractor files the $100 registration with insurance and state proof before work starts.
Use the city’s construction-document and site plan sheets; commercial plans need an Ohio architect or engineer.
Bring or mail the building application and each trade form to 530 North Freedom Street during office hours.
Fees follow Ordinance 2020-006 plus the 1% or 3% state surcharge.
Display it on the street side of the site and book inspections as work progresses.
Review, corrections and what causes delay
Commercial plans go first to the City Engineer and then to a plan examiner, with extra plan examination billed at $75 an hour, so incomplete use-group or construction-class information slows the review. Projects needing the Planning and Zoning Commission wait at least a month after they are heard, because the commission takes proposals under advisement before voting. Historic district work needs design review before the building permit. A residential permit is valid for 365 days, and an extension costs $125.
Inspections and certificates in Ravenna
Call the Building Department to arrange inspections; the plumbing form gives 330-296-5607 for inspection requests. Under the fee schedule, re-inspections after the first two cost $50 each. Keep the permit posted where it can be seen from the street and do not cover work that has not passed.
Rental properties are inspected by the same department against its rental housing checklist, and the property maintenance official handles complaints about existing buildings. A new building may not be occupied until the department has signed off and issued the certificate of occupancy or completion the code requires.
Ohio building code in Ravenna
Ravenna enforces the statewide residential and commercial codes through its own Building Department, and posts the residential code’s exempt-work list and deck rules on its permits page. FEMA’s Community Status Book lists the City of Ravenna (community 390458) as participating in the National Flood Insurance Program; its current map is dated August 18, 2009 and is marked as one with no base flood elevations determined.
Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Ravenna permit search and official resources
To see a past permit or inspection record, ask the Building Department directly: Ravenna directs public records inquiries to the department that holds the record, and they can be inspected or copied during business hours. The first 25 photocopies are free; after that each sheet costs five cents.
Want this handled start to finish?
Get a free quote →- Ravenna Building Department
- Building permits and applications
- Permit fee schedule, Ordinance 2020-006
- Residential building application
- Commercial building application
- Contractor registration application
- Electrical permit application
- Plumbing permit application
- Re-roof permit application
- Work exempt from permit
- Zoning, setback and historic district maps
- Planning and Zoning Commission application
- Zoning variance application
- Historic district and design review
- Rental properties
- Engineering, tap and meter fees
- Public records
- Codified ordinances
- Portage County health district plumbing (cities handle their own)
- FEMA Community Status Book, Ohio
Inspections are where schedules slip.
Get a free quote →Ravenna building permit FAQs
How much is a building permit for a new house in Ravenna?
$300 under 2,000 square feet, $350 under 3,000 and $450 under 4,000, plus separate electrical, HVAC and plumbing permits and the 1% state surcharge.
Do I need a permit for a new roof?
Yes. The re-roof permit is $50.50 for a house and $206 for a commercial building, and two or more existing layers must be torn off.
Does a contractor have to register with the city?
Yes. Registration is $100 and needs liability insurance naming the city, proof of state registration and work references.
Who handles plumbing permits in Ravenna?
The city Building Department, at $60 plus $10 per fixture for a home or a $150 base fee for commercial work.
Do I need a permit for a fence or deck?
A fence permit is $35 and a deck or porch without a roof $70 in the fee schedule; the posted code list exempts fences up to six feet and small low decks from building approval, so ask the department which applies.
How long is a permit valid?
The residential application says 365 days; the fee schedule lists a permit extension (“per OBC”) at $125.
When does the Planning and Zoning Commission meet?
Usually at 6:00 p.m. on the last Tuesday of the month; applications cost $100 and are due ten days before the meeting.
Simplify Ravenna permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Ravenna sooner?
Let Alliance prepare, file, and track your Ravenna permits while your crew stays on the job.
More Ohio permitting guides
Portage County
Read guide →Streetsboro
Read guide →Aurora
Read guide →Reading Building Permit Guide
Read guide →Reynoldsburg Building Permit Guide
Read guide →Richland County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Ravenna permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.