The City of Stow runs its own Building Department at 3760 Darrow Road (330-689-2729), which issues building, electrical, plumbing and mechanical permits for houses and commercial buildings and offers same-day inspections when they are requested before 9:00 a.m. Zoning permits come from the city’s Planning and Development Department, water and right-of-way permits from Engineering, and sanitary sewer permits from Summit County’s Department of Sanitary Services, not from the city.
What requires a building permit in Stow?
Stow’s building pages put it simply: virtually all new construction, fences, sheds, pools, decks and additions included, needs a zoning permit, and most projects also need a building permit. The city’s table for common projects sorts them like this:
| Project | Permits needed |
|---|---|
| New or replacement fence | Zoning permit |
| Deck under 30 inches high | Zoning permit |
| Deck over 30 inches high | Zoning and building permits |
| Patio | Zoning permit |
| Accessory structure under 200 sq ft | Zoning permit |
| Accessory structure over 200 sq ft, including a detached garage | Zoning and building permits |
| Above-ground or in-ground pool | Zoning permit and an electrical permit |
| Addition | Zoning and building permits |
| Signs and temporary signs | Zoning permit; building permit if taller than 8 feet |
| Temporary commercial sales | Zoning permit |
Building permits are also listed for new buildings, renovations, demolitions, temporary and prefabricated buildings, mobile homes, and electrical, plumbing and HVAC systems. The residential guide says routine maintenance usually needs no permit, giving replacing deck or porch boards, replacing windows or doors in the same openings, and painting as examples, and asks owners in doubt to call the Building Department.
What Stow decides and what the state holds
Stow enforces the Residential Code of Ohio and the Ohio Building Code but writes its own zoning code, engineering standards (site grading, driveway approaches, sidewalks, storm and water connections), contractor registration and fees. The guide also reminds owners that the city does not review, check or enforce deed restrictions or subdivision covenants, so those remain the owner’s to check.
Short on time to read all of this?
Get a free quote →Stow building department: who handles permitting
The Building and Engineering Departments issue permits and monitor construction within the city. The Building Department handles building, electrical, plumbing and mechanical permits, plan review distribution and inspections; Engineering handles water permits, house numbers, right-of-way permits and engineering inspections; and the Planning and Development Department reviews zoning first on every application.
| Office | Details |
|---|---|
| Building Department | 3760 Darrow Road, Stow, OH 44224; 330-689-2729; inspection requests 330-689-2728; fax 330-689-2705 |
| Hours | Monday to Friday, 8:00 a.m. to 4:30 p.m.; the residential guide says no permits are issued after 4:00 p.m. |
| Engineering Department | 330-689-2719; water permits, house numbers, right-of-way and engineering inspections |
| Planning and Development (zoning) | Second floor, south wing of City Hall; 330-689-2812; 8:00 a.m. to 4:30 p.m., closed noon to 1:00 p.m. |
| Sanitary sewer permits | Summit County Department of Sanitary Services, 1180 South Main Street, Akron, OH 44301; 330-926-2409 |
| Online portal | All forms, permits, inspection requests and contractor registrations (OpenGov) |
Stow permit types
The city issues building, mechanical, electrical, plumbing, engineering (right-of-way), water and zoning permits, and each needs its own application. The Building Department sends the documents and plans it receives to the other city departments for their reviews.
Residential permits
- New one-, two- and three-family dwellings. Submit the building permit application, two sets of construction drawings (foundation plan, floor plan, cross-section and exterior elevations), two sets of topographic survey and site plan, the house number slip and water permit from Engineering, the sanitary sewer permit from the county, energy conservation compliance calculations and a gas line pressure test. Ohio EPA, Engineering, Zoning, Landscaping and the Building Department all review it.
- Additions, accessory buildings, porches and decks. Provide a scaled site plan showing every structure and its distance to the lot lines, plus construction drawings; a deck plan needs the framing plan, cross-section, guard details, joist sizes, stair rise and run, and the deck-to-house connection.
- Energy compliance. The department wants residential energy conservation data with the plans, and the city points applicants to the U.S. Department of Energy’s ResCheck software.
- Gas lines. The city’s forms page carries a house fuel gas line pressure test form and a low pressure cut-off form.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Stow’s Commercial Permit Guide covers commercial and industrial work in seven chapters, from planning and zoning to public utilities. Under its planning chapter, every new commercial or industrial structure is reviewed by the Planning Department and the Planning Commission and approved by City Council: the application, with a site plan showing property lines, rights-of-way, building, parking and landscaping plus elevations of every side, is due 8 days before the Planning Commission meeting, whose recommendation then goes to Council’s Planning Committee and to Council for final action. The applicant or a representative must attend the commission and committee meetings. Plans must be prepared by someone knowledgeable in construction and codes, usually an architect or engineer, and plans by a registered design professional must carry the seal over an ink signature. Energy compliance data under chapter 13 of the Ohio Building Code goes in with the plans (ComCheck is one tool the city names), and the department distributes the documents to every city department that needs to see them.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning review. Planning and Development reviews each application first; the site plan must show distances from the structure to every property line, the area of all structures, distances between paved areas and structures, and known easements.
- Variances. The Building and Zoning Appeals Board, Stow residents appointed by the Mayor, hears variance requests from the city’s zoning and building codes where a requirement cannot be met because of a special hardship.
- Engineering site plan. A new house needs a topographic survey and site plan at no less than 1:20 scale with lot pins, setbacks, spot grades, utility connections, erosion control and a benchmark in U.S.G.S. format. The garage floor must sit at least 1.5 feet above the top of the curb, the recommended maximum driveway slope is 10%, and the ground must fall 6 inches within the first 10 feet from the building.
- Ohio EPA. Disturbing an acre or more needs an Ohio EPA NPDES Notice of Intent, and a lot in a platted subdivision covered by one needs its own individual-lot notice; the city wants a copy.
- Sewer and water. Get the sanitary sewer permit from the county first, then the water permit from Engineering (3 to 5 days); both must be in hand before a new home building permit is issued.
- Wells and septic. Where a well is needed, Summit County Public Health issues the permit to drill, and the Building Department may ask for an affidavit that drinkable water will be in place before occupancy; sewage treatment systems are also permitted by Summit County Public Health.
Rather talk it over?
Call 1-855-478-4290 →Stow permit costs and fees
Stow does not post a permit fee schedule on its building pages. Its guides explain how fees are built: residential permits range from fixed fees to fees based on estimated value or square footage, while commercial permit and plan review fees for new buildings, additions and site improvements are based on the valuation of construction. Ask the Building Department at 330-689-2729 for the figure for a specific job.
| Item | Rule |
|---|---|
| Residential permits | Fixed fees, or fees based on estimated value or square footage |
| Commercial permits and plan review | Based on the valuation of construction |
| Work started before the permit | The original permit fee plus an additional 300% |
| Card payments | A 2.5% charge is added (cash and checks also accepted) |
| State assessment | 3% on commercial and industrial permits; 1% on residential permits under state law |
| Right-of-way bond | May be required for work in the city right-of-way; refundable after the work is inspected and approved (bond forms for $5,000, $10,000 and $25,000) |
| Street tree fee | Charged per tree on the tree lawn of a new house on a curbed street, based on the length of street frontage |
| Re-inspection fee | May be charged if the same violation turns up on more than two later inspections |
Sanitary sewer permit fees are Summit County’s, and water permit fees and specifications come from Stow Engineering, 3760 Darrow Road, on weekdays from 8:00 a.m. to 4:30 p.m.
Trade permits and who may pull them
Electrical, plumbing and mechanical (HVAC) permits are separate city permits, inspected by the Building Department. Electrical and plumbing inspections are done on Monday, Wednesday and Thursday mornings, and mechanical and electrical rough inspections must pass before the framing inspection.
Every contractor must be registered with the City of Stow, using the building contractor registration application on the portal or at the counter. Electrical, plumbing and mechanical applicants also submit their current state credential; for commercial electrical, HVAC, hydronics, plumbing and refrigeration work that is the Ohio Construction Industry Licensing Board license. A property owner or occupant may take out a permit to do the work personally or to act as their own contractor; otherwise a registered general contractor or a registered electrical, plumbing or mechanical subcontractor must pull it, and the permit holder is legally responsible for the work.
Rather not deal with the building department?
Get a free quote →How to apply for a Stow building permit
Confirm on the city’s table whether the project needs a zoning permit, a building permit or both, and look up the zoning on the interactive zoning map.
For a new house, get the sanitary sewer permit from the county and then the water permit and house number from Stow Engineering.
Contractors register with the city before pulling permits; owners doing their own work apply in their own name.
Scaled site plan, construction drawings at 1/8 or 1/4 inch per foot, topographic survey for a new house, and energy data.
Upload each application on the city’s OpenGov portal; the Building Department routes it to zoning, engineering and landscaping.
Pay by cash, check or card; a 2.5% charge is added to card payments.
Review, corrections and what causes delay
Residential plan review generally takes 3 to 5 working days, and a new house application about 3 to 5 days once everything is in, with the water permit taking another 3 to 5 days. For commercial plans the city aims to finish an initial review within 14 days. If more information is needed, the department contacts the applicant, and you can check status by calling during business hours. Starting before the permit is issued adds 300% to the fee.
Inspections and certificates in Stow
Request inspections online at any time through the portal or by phone on 330-689-2728. Calls made before 9:00 a.m. get a same-day inspection; later calls are inspected the next day. Have the permit number, address, phone number, contractor or homeowner name and inspection type ready.
The residential guide’s general sequence is zoning, footer, foundation, rough plumbing, electrical, mechanical and framing, driveway approach and city walk, underground electrical, electrical service, insulation, and finals for heat, electric, building, engineering, plumbing and the water meter set. Every dwelling unit must pass its final inspection before occupancy is issued.
Engineering inspections need 24 hours’ notice on 330-689-2719 and cover the driveway approach, new water connection, city sidewalk, storm sewer tie-ins and erosion controls. The engineering final and bond release require backfilled and graded foundations, inspected downspout connections, a finished sidewalk and approach, culverts and yard drains in place, swales, house numbers installed and property pins set. Zoning inspections follow for new structures, fences, accessory buildings, pools and additions.
Want this handled start to finish?
Get a free quote →Ohio building code in Stow
Stow’s Building Department enforces the Residential Code of Ohio for houses and the Ohio Building Code for commercial and industrial buildings. FEMA’s Community Status Book lists the City of Stow (community 390532) as participating in the National Flood Insurance Program, with a current flood map dated April 19, 2016.
Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Stow permit search and official resources
Permit status can be checked on the portal or by calling the Building Department during business hours. The department publishes a records retention schedule that sets how long its permit files are kept; ask the department for older records.
- Stow Building and Engineering
- Stow online permit portal (OpenGov)
- Building code and permits, with the permit table
- Residential Permit Guide
- Commercial Permit Guide
- Building forms
- Permits, forms and engineering drawings
- Building Department records retention schedule
- Summit County Public Health sewage treatment systems
- Summit County Public Health private water systems
- BBS building department look-up
- Ohio Construction Industry Licensing Board
Inspections are where schedules slip.
Get a free quote →Stow building permit FAQs
Do I need a permit for a fence in Stow?
A zoning permit, yes; the city’s table lists no building permit for a new or replacement fence.
Does a deck need a building permit?
Only if it is more than 30 inches high; every deck needs a zoning permit.
How much is a permit in Stow?
The city does not post a schedule; residential fees are fixed or based on value or square footage, so ask the Building Department for a quote, and expect a 300% penalty if work starts first.
Who issues sanitary sewer permits in Stow?
Summit County’s Department of Sanitary Services at 1180 South Main Street, Akron (330-926-2409), not the city.
Can a homeowner pull a permit?
Yes. An owner or occupant doing the work, or acting as their own contractor, may take out the permit.
How fast are inspections?
Same day if requested before 9:00 a.m.; electrical and plumbing inspections run on Monday, Wednesday and Thursday mornings.
Do contractors register in Stow?
Yes. All contractors register with the city, and trade contractors add their state credential.
Does a new commercial building need Council approval?
Yes. The commercial guide says every new commercial or industrial structure goes through the Planning Department and Planning Commission and is approved by City Council.
Simplify Stow permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Stow sooner?
Let Alliance prepare, file, and track your Stow permits while your crew stays on the job.
More Ohio permitting guides
Summit County
Read guide →Twinsburg
Read guide →Akron
Read guide →Streetsboro Building Permit Guide
Read guide →Strongsville Building Permit Guide
Read guide →Toledo Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Stow permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.