Skip to main content
Municipal GuideOhioSummit County · Barberton

Barberton, Ohio Building Permit Guide

To get a building permit in Barberton, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Barberton’s Building Department at 576 West Park Avenue issues zoning certificates, right-of-way permits and contractor registrations, and its forms now ask for Summit County Building Standards approvals after a 2026 ordinance authorizing an agreement with the county.

Authority: Barberton Building DepartmentCounty agreement: Ordinance 55-2026Phone: 330-848-6730
City office
Building Department576 West Park Avenue, Room 103
Zoning certificate
$50New homes, exterior work, fences
Contractors
$150 registrationGeneral, trade and sign contractors
Hours
Mon–Fri 8:00–4:30330-848-6730

Permits in Barberton start at the city’s Building Department in the Municipal Building at 576 West Park Avenue (330-848-6730), which issues $50 zoning certificates, right-of-way permits and contractor registrations and inspects housing and zoning. On May 26, 2026 City Council passed Ordinance 55-2026, authorizing an agreement with the County of Summit’s Division of Building Standards, and the city’s occupancy form now asks whether you have applied to Summit County Building Standards for the certificate of occupancy.

What requires a building permit in Barberton?

The city’s own summary is that most home repairs and alterations need a permit, and it names fences, roofs, sheds, decks and driveway replacements as examples. On top of the building permit, Barberton requires a $50 zoning certificate for a new house, for exterior improvements and for fences, and its residential exterior form lists the projects it covers:

  • Front porches and rear decks
  • Garages, sheds and additions
  • Pools and hot tubs
  • Re-roofing and siding
  • Water supply and sewer line work, which the city inspects for a $30 fee
  • Fences, on their own zoning certificate application with a site plan and survey

Commercial new construction and exterior improvements take a commercial zoning certificate, and a change of use or of owner in a commercial, industrial or residential building takes an occupancy compliance application. Any work in the street right-of-way needs a separate right-of-way permit.

What Barberton decides and what the state holds

The statewide codes govern construction; Barberton decides its zoning and land use through the new Barberton Development Code, adopted by Ordinance 8-2026 on February 2, 2026 after the Planning Commission recommended it on December 17, 2025. The city also sets its own contractor registration, right-of-way, rental registration and property maintenance rules. Off-street parking must be paved with asphalt or concrete, and a gravel driveway has to be brought up to code when any improvement is made.

Some new businesses face a moratorium. Resolution 143-2025, passed on September 22, 2025, amended the 2021 “Various Types of Business Moratorium” (Ordinance 124-2021) to allow dollar-store infills while keeping the moratorium on new construction and permitting in place; the resolution does not list the business types or an end date, so ask the Planning Department before planning a new commercial use.

Barberton building department: who handles permitting

The Building Inspections Division is headed by the Building Commissioner, who is appointed by the Mayor and reports to the Director of Public Service. Its main work is housing, zoning and property maintenance inspections, collecting fees for zoning certificates and right-of-way permits, and registering contractors and rental properties. The city’s Adopted Building Codes page still says Barberton is certified by the Ohio Board of Building Standards.

Short on time to read all of this?

Get a free quote →

For building plans, the picture changed in 2026. Ordinance 55-2026 authorizes the Mayor to enter into an agreement with Summit County’s Division of Building Standards, the city’s online portal marks its building permit section as permanently down, the occupancy compliance form asks whether you have applied to Summit County Building Standards for a certificate of occupancy, and the zoning forms require all city and county permits and fees to be paid before work starts. The ordinance itself does not spell out the agreement’s scope, so call the Building Department at 330-848-6730 to confirm where your building plans go; the Board of Building Standards look-up map also shows the department for an address.

Barberton permit contacts
OfficeDetails
Barberton Building Department576 West Park Avenue, Room 103, Barberton, OH 44203; 330-848-6730 (zoning certificate forms list 330-848-6724); fax 330-848-6654; Building@cityofbarberton.com
HoursMonday to Friday, 8:00 a.m. to 4:30 p.m.
Planning and Community Development (DPCD)Zoning sections of the Development Code, Planning Commission applications; 330-848-6729
Engineering (right-of-way)576 West Park Avenue, Room 103; 330-848-6724
Summit County Building Standards1030 East Tallmadge Avenue, Akron, OH 44310; 330-630-7280

Barberton permit types

Barberton’s permit forms sit in the Building Document Center and are returned to the Building Department in person or by email to Building@cityofbarberton.com. Each zoning certificate application asks whether the property is in a floodplain and reminds owners that the city does not check homeowners’ association rules, so HOA approval is the owner’s job.

Residential permits

  • New houses. The new residential zoning certificate needs a plot plan at 1 inch to 20 feet showing lot and building dimensions, setbacks, topographic lines, finished grades on every side and at walks and drives, easements, utilities, drives and drainage, plus building elevations, complete architectural or engineering plans, and a landscape and lighting plan where one applies.
  • Exterior improvements. Porches, decks, garages, additions, pools and hot tubs, re-roofing, siding and sheds use the residential exterior improvements form, with a site plan, elevations and construction drawings and a note if it is a corner lot.
  • Fences. The fence certificate needs a site plan and survey, and the city offers a fence neighbor consent letter form.
  • Pools. Submit a building permit application with a plot plan showing distances to property lines, the house and other structures. A homeowner installing the pool may pull the permit; a pool contractor must be registered with the city.
  • Rentals. Rental properties register through the city’s rental registration portal.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial new construction and exterior improvements need the commercial zoning certificate with the same scaled plot plan, elevations and complete plans. A property in the historic district also needs a Certificate of Appropriateness. A new use or new owner in an existing building files the occupancy compliance application with a labelled floor plan and survey, along with the county certificate of occupancy and the city’s zoning compliance letter. Vacant commercial, industrial, historic and residential buildings each have their own registration form.

What comes before the building permit

  • Zoning certificate. $50 from the Building Department for new houses, exterior work, fences and commercial work.
  • Planning Commission and Council. Conditional use permits, site plan review, subdivision plats and zoning map amendments go through DPCD; some are reviewed by the Planning Commission with final approval by City Council, and papers and payment are due by 10:00 a.m. on the filing date.
  • Board of Building and Zoning Appeals. Variances and appeals of orders are heard at 5:30 p.m. in Council Chambers on the third Tuesday of each month in 2026, with filing about four weeks earlier; the December 15, 2026 meeting has a November 18 filing date.
  • Erosion control and utility taps. Sediment and erosion controls shown on the plot plan must be in place or the city stops inspecting, and utility taps made without a city inspection bring fines and a stop work order.
  • Right-of-way. Sidewalks, drive approaches and any other work in the right-of-way need the right-of-way and road opening permit first.

Barberton permit costs and fees

The fees Barberton prints are on its application forms; building permit fees for work reviewed under the Summit County agreement follow the county’s schedule, and the city’s sign permit form adds a 3% line to the permit fee. Ask the Building Department for any fee not shown here.

Barberton fees printed on city forms
ItemFee
Zoning certificate: new residential construction$50
Zoning certificate: residential exterior improvements$50
Zoning certificate: commercial new construction and exterior improvements$50
Zoning certificate: fence$50
City inspection of water supply or sewer line work$30
Contractor registration (Ordinance 32-2011)$150, non-refundable
Appeal of an order to comply or administrative penalty$25 filing fee
Sign permitPermit fee plus 3% state assessment and any penalty, as shown on the form

Rather talk it over?

Call 1-855-478-4290 →

The DPCD charges its own fees for Planning Commission applications and takes cash or check only, in exact change because it holds no cash on site. The city also shares sidewalk replacement costs with homeowners 60/40 under its residential sidewalk program.

Trade permits and who may pull them

The Building Inspections Division registers the electrical, HVAC, plumbing and sewer tapping contractors who take out specialty permits in Barberton. Its pool handout shows how far that reaches: even for a pool in the neighboring City of Norton, which handles its own zoning, the electrical and plumbing permits come from the Barberton Building Department.

Contractor registration costs $150 under Ordinance 185-2005 and Ordinance 32-2011 and covers general, sign and excavator, water and sewer contractors, and state-licensed electrical, HVAC, plumbing and fire protection contractors. The application needs liability insurance of $300,000 for injury or death and $100,000 for property damage with the City of Barberton named as additional insured, and licensed trades attach their state license or certificate. Commercial electrical, HVAC, hydronics, plumbing and refrigeration contractors hold that license from the Ohio Construction Industry Licensing Board. Homeowners may pull their own pool permit; for other owner-performed work, ask the Building Department.

How to apply for a Barberton building permit

1. Confirm who reviews the plans

Call the Building Department at 330-848-6730 to confirm whether your building plans go to Summit County Building Standards under the 2026 agreement.

2. Get the zoning certificate

File the right $50 zoning certificate application with its plot plan, elevations and drawings.

3. Clear any board review

Book Planning Commission, Board of Building and Zoning Appeals or historic district review if the project needs it.

4. Register contractors

Each contractor files the $150 city registration with insurance and any state license.

5. File the building permit

Submit plans to the department confirmed in step 1, plus right-of-way and utility tap requests to the city.

6. Pay every city and county fee

No work may start until all city and county permits and fees are paid.

Rather not deal with the building department?

Get a free quote →

Review, corrections and what causes delay

The forms stress the plot plan, and the Building Department asks applicants to consult it on every plot plan requirement. Board cases wait for the monthly meeting after the filing date, and Planning Commission papers must be in by 10:00 a.m. on the filing date. Because the forms involve both the city and the county, allow for both offices’ reviews and keep copies of the city’s zoning approval for the county file.

Inspections and certificates in Barberton

City inspectors check zoning, housing and property maintenance, and the city inspects water supply and sewer line work for $30 and every utility tap; skipping a tap inspection brings fines and a stop work order. If sediment and erosion controls are not in place as shown on the approved plot plan, the city will make no further inspections.

For occupancy, the city’s occupancy compliance application asks for the Summit County Building Standards certificate of occupancy application and a City of Barberton zoning compliance letter, with a floor plan labelled with uses and dimensions. Summit County Building Standards issues certificates of occupancy after its own inspections, which it books through its GovWell portal.

Ohio building code in Barberton

Barberton’s Adopted Building Codes page says the city is certified by the Board of Building Standards, and Ordinance 55-2026 adds an agreement with the county’s certified department. FEMA’s Community Status Book lists the City of Barberton (community 390524) as participating in the National Flood Insurance Program, with a current flood map dated April 19, 2016, and every zoning certificate form asks whether the property is in a floodplain.

Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works

Barberton permit search and official resources

For city permit and zoning records, ask the Building Department or the city’s public records clerk in the Law Department, listed with the Clerk of Council in Room 106 (330-848-6662); building records the county holds can be requested from Summit County Building Standards.

Want this handled start to finish?

Get a free quote →

Inspections are where schedules slip.

Get a free quote →

Barberton building permit FAQs

Who reviews building plans in Barberton?

Council authorized an agreement with Summit County Building Standards in Ordinance 55-2026, and the city’s forms now point to the county; call 330-848-6730 to confirm for your project.

How much is a zoning certificate?

$50 for a new house, residential exterior work, a fence or commercial work.

Do I need a permit for a fence, roof or shed?

Yes. The city says most repairs and alterations need a permit, naming fences, roofs, sheds, decks and driveway replacements.

How much does contractor registration cost?

$150, with $300,000 injury and $100,000 property damage insurance naming the city.

Can a homeowner pull a pool permit?

Yes. A homeowner installing the pool may submit the paperwork and pull the permit.

When does the appeals board meet?

At 5:30 p.m. in Council Chambers on the third Tuesday of the month; check the 2026 filing dates on the board’s page.

Is there a building moratorium?

Resolution 143-2025 keeps a moratorium on new construction for certain business types while allowing dollar-store infills; ask the Planning Department which uses it covers.

Simplify Barberton permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Barberton sooner?

Let Alliance prepare, file, and track your Barberton permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Barberton permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.