Wadsworth no longer runs its own residential building department. Since January 1, 2025, the Medina County Building Department, 791 West Smith Road, Medina (330-722-9220), has issued the building, electrical and HVAC permits, plan reviews and inspections for one-, two- and three-family homes in the city, and it already handled Wadsworth’s commercial, industrial and multi-family work. The City of Wadsworth’s Planning & Zoning Department at City Hall, 120 Maple Street, still issues zoning permits, and the county will not issue a building permit until it sees the city’s zoning approval. Plumbing permits come from the Medina County Health Department.
What requires a building permit in Wadsworth?
The city’s Building & Planning page sorts common residential projects by the permits they need. Its lists are examples, not complete, and many projects need both a county building permit and a city zoning permit.
County building permit and city zoning permit
- New dwellings
- Building additions, including decks and porches
- Accessory structures larger than 200 square feet
- Commercial, industrial and multi-family buildings, with Planning Commission approval first in most cases
City zoning permit only
- Fences
- Swimming pools
- Accessory structures under 200 square feet
- Patios and driveway expansions
- Signs and window graphics
Inside the county’s own rules, a permit is needed to build, enlarge, alter, repair, move or change the occupancy of a building, or to install or replace regulated electrical, gas, mechanical or plumbing systems, and the county lists building, electrical, mechanical, fire protection, special inspection and change-of-occupancy permits. No structure may go in a recorded easement without the easement holder’s consent: the city says permits will not be issued for work that would sit in one.
What Wadsworth decides and what the state holds
The state writes the building codes and certifies the departments that enforce them. In Wadsworth the county department enforces them under the Medina County Building Regulations (Resolution 25-0906, effective January 1, 2026), and county commissioners set the building fees. The city decides zoning, site plans, design review for signs, home occupations, easement encroachments, right-of-way work, lot grading and its own water and sewer connections, and adopted its engineering permit fees in Ordinances 24-172 and 25-210.
Wadsworth building department: who handles permitting
Two offices share every project. The Medina County Building Department reviews plans, issues the building, electrical, HVAC and fire protection permits and makes the inspections; the city’s Planning & Zoning Department reviews zoning, and the Planning Commission and Board of Zoning Appeals hear larger or contested cases. The county’s Chief Building Official post is listed as vacant on its page.
Short on time to read all of this?
Get a free quote →| Office | Details |
|---|---|
| Medina County Building Department | Medina County Permit Center, behind the Engineering Center, 791 West Smith Road, Medina, OH 44256; 330-722-9220; fax 330-764-8204; weekdays 8:00 a.m. to 4:30 p.m., no permits issued after 4 p.m. |
| City Planning & Zoning | City Hall, 120 Maple Street, Wadsworth, OH 44281; Planning and Zoning Director Jeff Kaiser, 330-335-2752; permit processing 330-335-2753 |
| City Engineering | 2nd floor, City Hall; engineering@wadsworthcity.org; 330-335-2751 |
| Plumbing permits | Medina County Health Department plumbing program, 330-723-9523 |
| City Hall hours | Monday to Friday, 7:30 a.m. to 4:30 p.m.; main line 330-335-1521 |
The same Permit Center also houses the county Sanitary Engineers and Highway Engineer permit desks, but Wadsworth runs its own water and sanitary system, so city connections go through city Engineering. A new home just outside the city in the township can still need city Engineering’s sanitary approval through its Township Sanitary Connection Application, while city water there requires annexation first.
Wadsworth permit types
County applications are entirely digital: the county takes every permit through its PCS Permit Portal, where applicants submit, pay, track progress and search permit data. City zoning, planning and engineering applications go to City Hall by email or mail, with an email address for the reply.
Residential permits
- County building permit: new homes, additions, modifications and accessory structures over 200 square feet, with the county’s residential plan review requirements and its guides for new homes, additions, decks and post-frame buildings.
- County electrical and HVAC permits: separate permits on their own fee scales; replacement furnaces or air conditioners are charged per unit.
- City zoning permit: the 2025 zoning permit application, with a site plan or aerial photo showing property lines, existing structures, the new work, setbacks and height.
- City lot grading: a new home in the city needs an Individual Residential City Lot Grading Application with a lot improvement plan prepared by an Ohio-licensed professional engineer.
- Home occupations: a conditional zoning application under Section 154.546(B)(17), heard by the Planning Commission if staff cannot approve it.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial, industrial and multi-family projects of four or more units need City Planning Commission approval before construction; the city reviews zoning and the site plan, and the county issues the commercial building permit and inspects. The city’s Commercial Development Guide sets out the steps. New projects may need a wastewater pre-treatment questionnaire, food service uses must install fats, oils and grease interceptors to the county Sanitary Engineers’ standards, and new signs need design review approval and a zoning certificate. A change of use needs a zoning determination from the Planning Director, then county building and city fire inspections.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- City zoning approval. The county will not issue the building permit without evidence of it.
- Planning Commission. Most commercial projects need its approval before a zoning certificate.
- Easements and right-of-way. An easement encroachment permit is needed to build in an easement with consent, and any work in the city right-of-way needs a permit, a scaled plan and usually a $5,000 project bond or a $50,000 annual bond.
- County conditions. The county regulations require proof that the project meets county stormwater and flood damage reduction rules, Health Department rules and parcel records before a building permit issues.
Wadsworth permit costs and fees
Building, electrical and HVAC permits in Wadsworth are charged on the Medina County fee schedule, Appendix I of the county building regulations in effect since January 1, 2026. A residential permit carries a 1% state fee and a commercial permit 3%, and a $10 technology fee is added to every plan review and permit.
| Work | Fee |
|---|---|
| Residential plan review: new dwelling / all others | $55 / $30, plus 1% and $10 ($65.55 / $40.30) |
| Residential building: new, addition or alteration | $80 plus $0.11 per sq ft |
| Residential electrical: new, addition or alteration | $80 plus $0.09 per sq ft |
| Residential mechanical: new, addition or alteration | $80 plus $0.06 per sq ft |
| Replacement furnace or air conditioner, fuel gas piping | $80, plus $19.50 for each additional unit |
| Pool electrical | $80 above ground; $125 in ground |
| Commercial plan review | $113 up to 500 sq ft, rising by size and use to $1,040 or $3,100 above 200,000 sq ft (state and technology fees included) |
| Commercial building / electrical / mechanical | $180 plus $0.13 / $0.10 / $0.06 per sq ft |
| Re-inspection / specialty inspection / after hours | $50 / $90 / $300 |
| Extension of an expiring approval | $100 |
Rather talk it over?
Call 1-855-478-4290 →A worked example from the county schedule: a 2,000-square-foot new house pays $80 plus 2,000 × $0.11, or $300, for the building permit; with the 1% state fee and the $10 technology fee that is $313, and the new-dwelling plan review adds $65.55, for $378.55 before the electrical and mechanical permits. Work started without a permit can bring an administrative fee of up to double the permit fee. City charges are separate. The 2026 Planning & Zoning Fee Schedule (Ordinance 25-210, for fees paid on or after January 1, 2026) charges $35 for a residential zoning certificate, new dwelling or miscellaneous; $60 for a new non-residential building or a building addition; $35 for a use change; $75, $150 or $250 for a sign by size; $125 for a variance or an appeal; and $125 plus $5 per 100 square feet of floor area for a new-construction development permit. Water and sewer connections follow the city’s schedule revised January 21, 2026 (a $257 residential meter, and $500 for a 1-inch or $800 for a 1½-inch tap only when city crews make it), plus water and sanitary sewer impact fees that treat lots created on or before June 30, 2025 as vested development.
Trade permits and who may pull them
Electrical and HVAC permits come from the county with the building work. Since January 1, 2025, HVAC and electrical contractors no longer register with the city, and the county no longer registers contractors either; instead, HVAC and electrical contractors show their state license when they apply.
- State licenses: under the county regulations, electrical, mechanical, hydronic and refrigeration contractors must hold an Ohio Construction Industry Licensing Board license before a permit issues or work starts.
- Homeowners: the owner and occupant of a single-family home may get permits without a license for work they do personally, by signing an affidavit witnessed by the county department or notarized; they may not hire someone else under it.
- Limits on owners: only licensed contractors may take permits for swimming pool and fountain wiring, and owners may get a service upgrade permit only if they arrange for the utility to cut the power and never work on a live service.
- Plumbing: plumbing permits and inspections come from the Medina County Health Department, which registers plumbing contractors annually; homeowners may get permits for their own plumbing.
Rather not deal with the building department?
Get a free quote →How to apply for a building permit in Wadsworth
Find any recorded easements and the setbacks before drawing the project.
Email or mail the zoning permit application with a site plan to City Hall; commercial projects go to the Planning Commission.
A new home needs the lot grading application; street work needs a right-of-way permit.
Submit the building permit in the county’s PCS Permit Portal with the plans and the city’s zoning approval.
Electrical and HVAC go through the county portal; plumbing through the Medina County Health Department.
Pay the county fees in the portal, then book inspections as each stage is ready.
Review, corrections and what causes delay
The most common hold-up is the hand-off between offices: the county cannot issue the building permit until the city’s zoning approval is on file, and most commercial projects need Planning Commission approval before the zoning certificate. City applications sent by mail need an email address so receipts and permits can be returned. The county issues no permits after 4 p.m. Anyone who disagrees with a county building official’s decision can appeal to the Medina County Board of Building Appeals, which must act within 30 days unless both sides agree to more time; the appeal fee is $100. Approvals expire if work has not started within 12 months or stops for more than six months, and the county charges $100 for each extension.
Inspections in Wadsworth
Residential permit inspections are scheduled with the Medina County Building Department, not the city. Under the county regulations, the permit holder must give notice no later than 3:00 p.m. on the business day before the inspection, and the county’s page repeats that no next-day inspection can be requested after 3 p.m.
- Required inspections: the county publishes required-inspection lists for houses and pools, a cold-weather concrete guide and an inspection quick-start guide for its portal.
- Plumbing: inspected by the Medina County Health Department under its own permit.
- Use changes: a commercial change of use needs a county special or use-change inspection and a city fire safety inspection, and ends with two occupancy certificates, one from the county for building, fire and health codes and one from the city for zoning.
- Re-inspections: $50 each, and an inspection outside normal hours costs $300.
Ohio building code in Wadsworth
The Medina County Building Department enforces the statewide Ohio codes in Wadsworth for residential and commercial work. FEMA’s Community Status Book lists the City of Wadsworth (community 390386) as participating in the National Flood Insurance Program, with flood maps dated August 4, 2008, and the county regulations require proof of compliance with flood damage reduction rules before a building permit issues.
Want this handled start to finish?
Get a free quote →Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Wadsworth permit search and official resources
Permits issued since January 1, 2025 can be searched in the Medina County PCS Permit Portal, which the county says lets anyone search permit data online; the county also posted Wadsworth’s permit report for the period before December 31, 2024. Zoning permits and city engineering files are kept at City Hall.
- Wadsworth Building & Planning
- Permits: how to get them
- Zoning permit application (2025)
- City planning and zoning fees
- Commercial and industrial projects
- City engineering permits
- Water and sanitary fee schedule, revised January 21, 2026
- Electrical and HVAC registration notice
- Planning Commission
- Board of Zoning Appeals
- Medina County Building Department and PCS Permit Portal
- Medina County building fee schedule, 2026
- Medina County Building Regulations, Resolution 25-0906
- Medina County Health Department plumbing program
- Ohio Board of Building Standards building department look-up
- FEMA Community Status Book, Ohio
Inspections are where schedules slip.
Get a free quote →Wadsworth building permit FAQs
Who issues building permits in Wadsworth now?
The Medina County Building Department, since January 1, 2025, for houses as well as commercial work; the city issues zoning permits.
Do I need a city zoning permit too?
Yes, for new homes, additions, decks, porches, accessory buildings, pools, fences, patios and driveway expansions; the county waits for it.
Does a shed need a building permit?
An accessory structure under 200 square feet needs only a city zoning permit; a larger one also needs a county building permit.
How much is a building permit for a new house?
On the county schedule, $80 plus $0.11 per square foot, plus 1% and a $10 technology fee; a 2,000-square-foot house is $313 plus $65.55 plan review.
Do electricians and HVAC contractors register with the city?
No, not since January 1, 2025; they show their state license when applying to the county.
Who handles plumbing permits?
The Medina County Health Department plumbing program, 330-723-9523.
How do I schedule an inspection?
Through the Medina County Building Department by 3 p.m. on the business day before; residential inspections are no longer booked with the city.
Simplify Wadsworth permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Wadsworth sooner?
Let Alliance prepare, file, and track your Wadsworth permits while your crew stays on the job.
More Ohio permitting guides
Medina County
Read guide →Brunswick
Read guide →Medina
Read guide →Warren Building Permit Guide
Read guide →Warren County Building Permit Guide
Read guide →Warrensville Heights Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Wadsworth permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.