Duplin County Building Inspections in Kenansville issues building, electrical, plumbing, mechanical and gas permits across the county, while each town handles zoning inside its limits and ETJ. Rural Duplin has no county zoning, and plans must be sealed for larger or costlier buildings.

Authority: Building InspectionsCode: 2018 NC State Building CodePhone: 910-296-2124
Authority
Building Inspections
New home permit
$275 base up to 1,800 sq ft
Office
117 Beasley Street, Kenansville

Building permits in Duplin County come from County Building Inspections in the Hardison Building, 117 Beasley Street, Kenansville (910-296-2124, inspections@duplinnc.gov). A new home starts at $275 for up to 1,800 sq ft, each trade permit is about $80 for a house, and inspections booked before 5:00 p.m. are normally done the next workday.

What requires a permit in Duplin County?

The County’s application forms and fee schedule cover these permits:

Building

  • New homes, additions and renovations
  • Commercial and multi-family buildings
  • Manufactured and modular home set-ups
  • Relocated structures
  • Decks, porches and small storage buildings
  • Swimming pools, spas and hot tubs
  • Signs and insulation

Trades and power

  • Electrical, including service poles, service changes and upgrades
  • Plumbing, with backflow prevention test reports
  • Mechanical work and HVAC change-outs
  • Fuel gas piping
  • Temporary power during construction
  • Reconnection of power
  • Electrical service to poultry and swine houses and bulk barns

Farm buildings can be exempted from the building permit using the County’s Farm Building Exemption form. Fire-code plan reviews, inspections and permits are handled separately by the Fire Marshal Division.

Short on time to read all of this?

Get a free quote →

Who handles permitting in Duplin County?

Duplin County permit offices
OfficeRole and contact
Building InspectionsBuilding and trade permits and inspections. Hardison Building, 117 Beasley Street, Kenansville, NC 28349 (mail PO Box 950); 910-296-2124, fax 910-296-2166; 8:00 a.m.–5:00 p.m. weekdays. Chief Inspector: David Houston.
PlanningUnified Development Ordinance, subdivisions, flood hazard permits and site plan review; 910-296-2102, same building. Director of Planning & Inspections: Christopher Hatcher.
Environmental HealthSeptic systems, soil evaluations and well permits; 340 Seminary Street, Kenansville; 910-296-2126.
Fire Marshal DivisionFire code plan review, inspections and permits; 209 Seminary Street; 910-296-2160.
Addressing911 addresses; 910-296-2169.

Towns. Duplin has no countywide zoning; the unincorporated county is unzoned, and the County Planning Department does not keep any town’s zoning information. Each municipality zones its own town limits and ETJ. The County’s building and manufactured-home applications ask for the town’s zoning approval when a site is in or next to a town’s limits or ETJ, then the permit itself is issued by County Building Inspections. That applies in Beulaville, Calypso, Greenevers, Kenansville, Magnolia, Rose Hill, Teachey, Wallace and Warsaw, and in the Duplin parts of Faison, Harrells and Mount Olive.

  • Warsaw: the Town’s Code Enforcement/Planning Officer reviews zoning and site plans (910-293-7814, ext. 100).
  • Wallace: the Town’s Planning, Zoning and Community Development Department keeps its zoning ordinance and map, at 120 Municipal Drive.
  • Rose Hill: Town Hall issues the zoning permit after a $25 application is reviewed, and the County will not issue the building permit until that is done (910-289-3159).
  • Kenansville: the zoning application goes to Town Hall with a site plan, proof of ownership or lease and a $50 fee, paid in cash or by check (910-296-0369).
  • Magnolia: the Town posts a zoning application and allows 5 business days for a reply (910-289-3205).
  • Other towns: the published sources do not list a separate zoning office; ask the town hall.

Permit fees and trade permits

Fees come from the County’s fee schedule effective July 1, 2026, posted as Inspection Fees on the Building Inspections page.

Not sure this scope needs a permit?

Get a free quote →
Duplin County building inspection fees
PermitFee
New home up to 1,800 sq ft$275 base
Larger new home$0.28 per sq ft in addition to the base fee
Residential addition or renovation$0.20 per sq ft
New commercial or multi-family$0.20 per sq ft
Manufactured or modular home / relocated structure$150 each
Deck, porch or small storage building$50
Swimming pool / pool bonding$100 / $60
Insulation$50
Residential electrical, plumbing or mechanical permit$80 each
HVAC change-out$80
Service pole, service change or upgrade$60
Fuel gas piping$75
Commercial electrical$100 up to 200 amps, rising to $175 over 600 amps
Commercial plumbing / mechanical$100 base, plus $5 per fixture / $25
Sign$100

Re-inspections are $50 per trip. Trade permits must be bought by the licensed contractor doing the work. An owner may do their own electrical, plumbing or mechanical work on a manufactured home only with a permit and must then live in the home for at least a year. The County takes card payments on a Credit Card Authorization Form and asks that card or bank details never be sent by email.

Related charges on the same schedule: Environmental Health site evaluation $250, septic improvements permit $150 (480 gallons per day or less), existing system or permit transfer $100, private well permit $300; Planning flood hazard permit $25; fire prevention inspection $75 for buildings under 25,000 sq ft.

Rather talk it over?

Call 1-855-478-4290 →

What the building permit application needs

  • Plans showing foundation type, floor framing, load-bearing walls and roof framing (truss documents or stick-built sizes and spacing). Plans must be sealed when the job costs over $90,000, the building exceeds 2,500 sq ft or it is part of a prefabricated package.
  • The completed application with the licensing affidavit and workers’ compensation form, and a copy of the general contractor’s licence.
  • Town zoning approval for sites in or next to a town’s limits or ETJ; elsewhere the County Planner reviews the site plan.
  • An elevation certificate in a floodplain, and a no-rise certification in a non-encroachment area.
  • A copy of any subdivision restrictive covenants.
  • The approved septic plan and the 911 address.
  • Lien agent details for projects of $40,000 or more, unless the work is on the applicant’s own existing home.

The County may ask for a deed, survey map or new survey to check setbacks and rights-of-way. An owner may act as general contractor only if they will occupy the building, not sell or lease it, for at least a year after completion. Manufactured homes also need the dealer’s typed bill of sale or a tax moving permit.

Rather not deal with the Duplin County building department?

Get a free quote →

How to apply for a Duplin County building permit

1. Check town limits on the GIS map

Turn on the City Limits and ETJ layers; inside a shaded area, get the town’s zoning approval first.

2. Get the 911 address

Addressing (910-296-2169) assigns it, and the County requires proof of it.

3. Get septic and well approval

Environmental Health on Seminary Street handles soil evaluations, septic improvements permits and well permits.

4. Prepare plans and paperwork

Seal the plans if the cost, size or prefabricated package requires it, and add the elevation certificate, covenants and lien agent details where they apply.

5. File with Building Inspections

Submit the Building Permit Application, or the Accessory Building and Trade application for smaller jobs, at 117 Beasley Street; the County Planner reviews the site plan.

6. Send commercial plans to the Fire Marshal

Fire code plan reviews are emailed to Fire and Emergency Management and take up to 7 days after the invoice is paid.

Inspections in Duplin County

Call Building Inspections at 910-296-2124 to book. The County’s homeowner guide says inspections scheduled before 5:00 p.m. are normally done the next workday. Each repeat trip costs $50.

Manufactured homes are set up following the manufacturer’s manual (or the state manufactured home regulations for a used home without one), and the manual must be on site for the inspector. A footing inspection is required before concrete for piers, masonry skirting, perimeter foundations and any added porch, deck or garage.

Temporary power is granted for up to 90 days and is cut off the day after it expires unless a certificate of occupancy has been issued; the owner and the electrical, mechanical and plumbing contractors all sign the request, and the building may not be occupied on temporary power.

Local Duplin County rules

No county zoning: outside the towns the land is unzoned, but the County’s Unified Development Ordinance still applies, including its solar farm, mobile home park and subdivision rules.

Airport height zones: within a mile of Duplin County Airport (260 Airport Road, Kenansville) or Henderson Field (250 Skydive Lane, Wallace), height-restriction zoning may apply that does not show on GIS; ask Planning.

Flood buyout land: parcels bought out after Hurricanes Floyd, Matthew and Florence can only be leased for farming, grazing, open space or recreation.

Want this handled start to finish?

Get a free quote →

North Carolina building code

The 2018 North Carolina State Building Code family applies statewide, with the 2020 North Carolina Electrical Code; one- and two-family homes and townhouses still use the 2017 edition. The 2024 code has been delayed and cannot take effect before late 2027. The NC State Building Code and the delayed 2024 edition

Duplin County permit resources

Duplin County permit FAQ

Inspections are where schedules slip.

Get a free quote →

Who issues building permits in Wallace, Warsaw and the other Duplin towns?

Duplin County Building Inspections. The towns handle zoning in their limits and ETJs, and the County asks for the town’s zoning approval with the application.

How much is a building permit for a new house in Duplin County?

$275 for up to 1,800 sq ft, with $0.28 per sq ft added to the base fee for larger homes, plus about $80 for each electrical, plumbing and mechanical permit.

Do I need sealed plans?

Yes if the job costs over $90,000, the building is over 2,500 sq ft or it is part of a prefabricated package.

Is there zoning in rural Duplin County?

No. There is no countywide zoning, although the Unified Development Ordinance and airport height zones still apply.

How fast are inspections?

Requests made before 5:00 p.m. are normally inspected the next workday.

Can I do my own wiring on a mobile home?

Yes, with a permit, if you will live in the home for at least a year; hired electricians must be licensed and buy the permit themselves.

Simplify Duplin County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in North Carolina. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Duplin County sooner?

Let Alliance prepare, file, and track your Duplin County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Duplin County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.