Everything contractors, builders, and developers need to pull a Craven County building permit — Planning & Inspections in New Bern, the new self-service portal, the routed central permitting process, CAMA and flood requirements, the Wind Zone II rule, fees, and inspections.

Authority: Craven County Planning & InspectionsCode: 2018 NC State Building CodeCoastal: CAMA — Areas of Environmental Concern
Authority
Planning & Inspections2828 Neuse Blvd, New Bern
Apply Online
Self-service portalRecently launched
Wind Zone
Zone IIThe state's middle designation
Coastal
CAMA countyAEC triggers a separate permit

Craven County building permits come from Planning & Inspections on Neuse Boulevard in New Bern, through a genuinely routed Central Permitting process: Land Use Review, then Environmental Health where septic or a well is involved, back to Central Permitting, then Building Inspections for plan review.

Two overlays sit on top of that. Craven is a CAMA county, so coastal clearance runs on its own clock; and it is a documented Wind Zone II county for manufactured housing, a designation built into the home at the factory that cannot be changed afterwards except by a licensed NC engineer.

Applies to Craven County's permitting jurisdiction. The City of New Bern runs its own Development Services inspections division, and MCAS Cherry Point is federal property.

No elevation certificate, no power. On a site in an identified FEMA flood zone, a final flood elevation certificate is required before power can be turned on to the structure. Put the surveyor in the construction schedule, not the punch list.

What requires a permit in Craven County?

A Craven County building permit is required before most construction, alteration, repair, demolition, or change of occupancy in the county's jurisdiction. Craven is a coastal-plain county at the confluence of the Neuse and Trent rivers, anchored by New Bern and Marine Corps Air Station Cherry Point, and it sits inside both the CAMA programme and the state's middle manufactured-housing wind zone.

The enforced edition is the 2018 NC State Building Code family (2018 Residential Code, 2020 NC Electrical Code). The 2024 NC State Building Code was originally slated for January 1, 2025, but S.L. 2024-57 and then S.L. 2025-2 (the Disaster Recovery Act of 2025, passed after Hurricane Helene) pushed its effective date to 12 months after the State Fire Marshal certifies publication and the seating of the new Residential Code Council — currently expected no earlier than 2027. Until then the 2018 code governs, though an owner may elect the 2024 code as an alternate method under § 102.5 of the Administrative Code if the plan set says so clearly.

Permit required

  • New construction, additions, and accessory structures over the statutory exemption
  • Structural and load-bearing alterations, repairs, and demolition
  • Electrical service changes, panel work, and most wiring alterations
  • Plumbing additions, repipes, gas piping, and non-identical water heater swaps
  • Mechanical and HVAC installations and changeouts
  • Mobile and manufactured home placement, blocking, and tie-down
  • Development inside a CAMA Area of Environmental Concern
  • Construction in a FEMA flood zone, which adds an elevation certificate

Typically exempt

  • Nonstructural work costing forty thousand dollars or less in a single-family home, farm building, or commercial building (G.S. 160D-1110(c))
  • Replacement windows, doors, exterior siding, and porch/deck pickets, railings, stair treads, and decking
  • Like-for-like plumbing swaps that keep size and capacity, and like-kind light fixtures, receptacles, and switches
  • Same-spec water heater changeouts installed by a licensed contractor
  • Painting, flooring, cabinetry, and other cosmetic work
⚠️ Get the Craven County building permit issued before work starts. starting listed work without the required permits is a Class 1 misdemeanor under G.S. 160D-1110(i), on top of stop-work orders and having to open up concealed work for inspection. On the coast add the CAMA warning — a building permit is not a CAMA permit. Sequence matters: the CAMA permit is a separate approval from the building permit and does not travel with it. An inspection department can issue a building permit for a project that still needs CAMA clearance, and the resulting stop-work is the single most common coastal delay in North Carolina.

Craven County building department: who handles permitting

Craven County Planning & Inspections operates from 2828 Neuse Boulevard in New Bern, with Planning on one line and Inspections/Central Permitting on another. The county has recently launched a self-service Planning and Inspections portal that lets you apply, schedule, and pay for permits from a phone, tablet, or computer with email notifications along the way — while the office remains open for in-person applications and submittals.

Central Permitting is genuinely routed rather than nominal. Your application moves through Land Use Review, then to Environmental Health if a septic system or drinking water well is involved, then back to Central Permitting, then to Building Inspections for plan review. On a sewered development, the county requires a letter from the governmental entity supplying that service stating that it intends to serve your development.

Craven County permitting contact
DetailInformation
OfficeCraven County Planning & Inspections, 2828 Neuse Boulevard, New Bern, NC 28562
Planning(252) 636-6618
Inspections / Central Permitting(252) 636-4987
Online portalCraven County self-service planning and inspections portal
Other departments in the processEnvironmental Health and Water
Sewer projectsLetter of intent to serve required from the supplying entity
💻

Craven is a documented Wind Zone II county for manufactured housing. North Carolina also runs a wind-zone map for manufactured housing, set by the Department of Insurance and keyed to distance from the ocean. Zone I covers the interior counties, Zone III the coastal ones, and Zone II the band in between — Craven County among them. The zone rating is built into the home at the factory and anchored accordingly, which is why it cannot be changed after construction except by an engineer licensed in North Carolina. Buying a Zone I home for a Zone II or Zone III site is the expensive version of this mistake, and it is not fixable on delivery.

This guide covers Craven County, North Carolina, seated in New Bern. New Bern is not New Bern, Switzerland's namesake city Bern, and Craven has no interstate county twin. Locally, note that the City of New Bern runs its own Development Services inspections division, and Marine Corps Air Station Cherry Point is federal property outside county jurisdiction.

Craven County permits: record types and what each covers

Craven's records reflect a routed process where several approvals precede the building permit rather than following it. These are the ones you will file:

Residential permit types

Residential permit types in Craven
Permit typeWhat triggers itReview pathFee basis
New constructionNew dwellings, additions, and accessory structures over the statutory exemption ceilingFull plan review against the 2018 NC Residential Code, plus zoningValuation-based
Renovation / alterationLoad-bearing changes, layout changes, or added plumbing, HVAC, or electricalPlan review scaled to scope; 15-business-day residential clock appliesValuation-based
ReroofRoof covering replacement, and any work that adds rather than replaces roofingSheathing and dry-in inspection; plan review rarely requiredValuation or squares
Solar photovoltaicRooftop or ground-mount PV, with or without battery storageElectrical review led, with structural review of the attachmentFlat or system-size based
Battery energy storageWall or floor-mounted ESS added to a dwellingElectrical review plus fire separation and location checkFlat or per-permit minimum
ElectricalService changes, panel upgrades, new circuits, EV chargers, most rewiringTrade review by the electrical inspector; filed as its own recordPer-permit minimum or per-device
PlumbingNew piping, repipes, fixtures, gas piping, and non-identical water heater swapsTrade review; like-for-like same-capacity swaps are statutorily exemptPer-permit minimum or per-fixture
Mechanical / HVACChangeouts that are not like-for-like, ductwork, and refrigerationTrade review by the mechanical inspectorPer-permit minimum or per-unit
Deck and porchNew decks and structural rebuilds; pickets, rails, treads, and decking are exempt replacementsFooting and framing review against the residential codeFlat or valuation-based
Pool and spaIn-ground and above-ground pools, spas, barriers, and bondingStructural, barrier, and electrical bonding reviewValuation-based
Accessory structureSheds, detached garages, and carports above the local size thresholdZoning first, then structural review where applicableFlat or valuation-based
DemolitionFull or partial demolition of a structureUtility disconnect verification and asbestos notificationFlat
Land use permitThe first review step in the county's central permitting sequenceLand use review ahead of environmental health and buildingSet by the county
Mobile home permitBlocking, tie-down, plumbing, and wiringRequired inspections built into the permit process itselfFlat
Flood elevation certificateSites in an identified FEMA flood zoneFinal certificate required before power connectionSurveyor cost

Commercial permit types

Commercial permit types in Craven
Permit typeWhat triggers itReview pathFee basis
New constructionGround-up commercial, industrial, and multifamily buildingsFull multi-discipline review; sealed plans requiredValuation-based
Upfit / tenant improvementInterior build-outs and suite fit-ups in an existing shellConcurrent building, trade, and fire reviewValuation-based
Renovation / alterationStructural, envelope, or system changes to an existing buildingPlan review scaled to scope; accessibility triggers attachValuation-based
Change of occupancyConverting a building from one occupancy classification to anotherLife-safety, accessibility, and zoning reviewValuation or flat
Shell buildingA building permitted without a known tenant or useShell review only; no certificate of occupancy until an upfit closesValuation-based
ReroofCommercial roof covering replacement or recoverStructural check on added dead load; fire review where applicableValuation or squares
Solar photovoltaicCommercial rooftop, carport, and ground-mount arraysStructural, electrical, and fire access reviewValuation or system-size based
ElectricalService, distribution, and branch circuit workTrade review; separate record from the building permitValuation or per-device
PlumbingSupply, waste, vent, grease, and gas systemsTrade review; backflow and grease interceptor sign-offs attachValuation or per-fixture
Mechanical / HVACRooftop units, ductwork, exhaust, and refrigerationTrade review; energy compliance documentation requiredValuation or per-unit
Fire protectionSprinkler, standpipe, alarm, hood, and suppression systemsFire prevention review, often a separate submittalValuation or per-device
SignWall, monument, and illuminated signageZoning review plus electrical where illuminatedFlat or per-sign
CAMA minor or major permitDevelopment inside an Area of Environmental ConcernLocal Permit Officer or the Division of Coastal ManagementState-set, CPI-adjusted
Sewer letter of intent to serveDevelopments operating on a sewer systemLetter required from the supplying governmental entityNo separate fee
Environmental Health permitSeptic system or drinking water wellRouted mid-process, then returned to Central PermittingFlat by system type

Residential

  • Single-discipline review in most cases
  • One permit covers simultaneous same-address residential projects (G.S. 160D-1110(d))
  • The 15-business-day review clock and its 10%-per-day fee refund apply
  • No engineer's or architect's seal may be demanded unless the code itself requires it

Commercial — multi-discipline

  • Concurrent review across building, trades, fire, and zoning
  • Signed and sealed plans across every affected discipline
  • Third-party plan review available under G.S. 160D-1110.1 when review stalls
  • Accessibility and life-safety review attach to any change of occupancy

Records you will actually see in Craven

Craven record catalog
RecordWhat it covers
Land use permitThe first review step in the county's central permitting sequence
Residential building permitNew dwellings, additions, and alterations in the county's jurisdiction
Commercial building permitGround-up commercial, upfits, and alterations with plan review
Environmental Health permitSeptic system or drinking water well approvals, routed mid-process
Mobile home permitBlocking, tie-down, plumbing, and wiring, with inspections built into the permit
Mechanical permitHVAC work, with required inspections included in the permit process
CAMA minor or major permitDevelopment inside an Area of Environmental Concern
Flood elevation certificateFinal certificate required in a FEMA flood zone before power is connected

Solar permits in Craven

Solar is its own record in North Carolina rather than a line item on a building permit, and it is reviewed on two tracks at once: the electrical side (conductors, overcurrent protection, rapid shutdown, labelling, and the service or supply-side connection) and the structural side (attachment detail, rail spacing, and whether the existing framing carries the added dead load).

Solar in Craven files as an electrical-led record, with all wiring required to be complete to the National Electrical Code at inspection. On a coastal parcel inside an AEC, the CAMA question attaches to a ground-mount array the same way it would to any other structure.

The HOA question comes up on nearly every residential array, and North Carolina answers it more favourably than most states. G.S. 22B-20 voids covenants that prohibit — or merely have the effect of prohibiting — rooftop solar, and in Belmont Association v. Farwig (2022) the NC Supreme Court held a review committee's general aesthetic authority cannot block street-facing panels: an HOA must ban them explicitly, and even then cannot force a relocation that defeats reasonable use (a north-facing roof cutting output roughly in half fails that test). Condominiums under Chapters 47A/47C sit outside the statute.

Utility interconnection runs on its own clock alongside the permit. Duke Energy and the state's electric cooperatives each set their own application, meter, and witness-test sequence, and the utility's approval to energize is not something the inspection department controls — plan for the two tracks to finish at different times.

Roofing permits in Craven

A roof covering replacement needs a permit in most of North Carolina, and the statutory exemption is narrower than contractors expect: replacing roofing is treated differently from adding roofing, and adding a layer pushes the job out of the exemption regardless of what it costs.

Because North Carolina runs a statewide code, there is no state product-approval database to search and no local product-approval number to cite — the assembly simply has to comply with the NC code and the manufacturer's listed installation instructions, which is what the inspector checks against.

Reroofs in the county's jurisdiction are county permits; inside New Bern they belong to the city's Development Services division, which also applies the fifty-percent substantial improvement rule on floodplain properties.

Sequencing is where reroofs go wrong. The sheathing and dry-in condition has to be visible when the inspector arrives, so covering it before the inspection means opening it back up. On a structure that has had a previous layer removed, expect the inspector to look at deck fastening and at any decking replaced along the eaves.

Record types, document sets, and fee structures are set by local ordinance and change without notice. Confirm the current catalog against the official portal before you file.

Craven County permit cost

Craven County building permit fees follow the county's published schedule and vary by record type and scope, with trade permits charged separately. The new self-service portal handles applications, scheduling, and payment together.

Coastal and flood costs sit outside the county schedule. CAMA fees are state-set and CPI-adjusted from July 1, 2025 on a four-year cycle, and a flood elevation certificate is a surveyor's cost rather than a permit fee — but on a FEMA-zone parcel it is not optional.

How Craven fees are structured
Fee componentHow it works
Building permitCounty fee schedule by record type and scope
Trade permits (E/P/M)Charged separately per trade record
Environmental HealthSeptic and well records charged separately
CAMA permitState-set, CPI-adjusted from July 1, 2025
Flood elevation certificateSurveyor cost; required before power connection in a FEMA zone
Re-inspectionCharged if the home does not pass the initial inspection
🧮

Want a precise number for a specific Craven project? Send us the scope and we will price the permit path before you file.

Craven County trade permits

Craven County trade permits for electrical, plumbing, and mechanical work are separate records pulled by the state-licensed contractor — and on mobile home and mechanical permits, the required inspections are built into the permit process itself.

Electrical permits

Required for services, panel upgrades, circuits, EV chargers, and solar interconnection; all wiring must be complete to the National Electrical Code at inspection. Electrical work takes a contractor licensed by the NC State Board of Examiners of Electrical Contractors.

Plumbing permits

Required for new piping, repipes, fixtures, and gas piping. At a manufactured home inspection the plumbing must be complete with the septic connection left uncovered.

Mechanical (HVAC) permits

Required for installations, non-identical changeouts, ductwork, and refrigeration, with all required inspections included as part of the mechanical permit process.

Manufactured housing

New homes are blocked and tied down per the factory manual and used homes per the North Carolina code book — and the home's wind zone rating cannot be changed after construction except by a licensed NC engineer.

🧢 North Carolina requires a licensed General Contractor for any project of $40,000 or more (NC Licensing Board for General Contractors, nclbgc.org). The license tiers cap single-project value: Limited to $750,000, Intermediate to $1,500,000, Unlimited without cap — excluding land cost — across Building, Residential, Highway, Public Utilities, and Specialty classifications. For work costing $40,000 or more, no permit may issue until the owner has designated a lien agent through LiensNC and the agent's details appear on the permit (G.S. 160D-1110(g)). Improvements to an owner-occupied existing single-family residence, and incidental accessory structures, are exempt — and a manufactured home's purchase price doesn't count toward the trigger. (The threshold was raised from $30,000; older guides still quote the old number.) On a FEMA flood zone site, a final flood elevation certificate is required before power can be turned on to the structure — plan the surveyor into the schedule, not the punch list.

Craven County permit application: how to apply step by step

Here is how to get a building permit in Craven County, from confirming the requirement through to close-out. Each step below corresponds to a real decision point where projects commonly stall.

1. Confirm jurisdiction and the coastal question

Establish whether the parcel is county, City of New Bern, or federal Cherry Point land — and whether it sits inside a CAMA Area of Environmental Concern.

2. Start with Land Use Review

Craven's central permitting process routes your application through land use review first.

3. Clear Environmental Health if applicable

If a septic system or drinking water well is involved, the application routes to Environmental Health, which reviews and issues, then routes it back.

4. Supply the sewer letter where relevant

On a development operating on a sewer system, the county requires a letter from the supplying governmental entity stating its intent to serve.

5. Clear building plan review

The application then goes to Building Inspections for plan review, and inspections are scheduled with the permitting technicians.

6. Inspect, certify, and connect

Run the inspections, obtain the final flood elevation certificate where the site is in a FEMA zone, and close out — power cannot be connected without that certificate.

Inspections in Craven County

Craven County inspections are requested by calling the inspections department during business hours with the correct permit number, and the county's stated custom is that the inspection will be performed within the next two days — which matches the statutory duty exactly. You can call after 8:30 a.m. on the day of your inspection to learn whether it will be morning or afternoon.

Because of the county's size, inspectors will try to accommodate your schedule but cannot guarantee a time. G.S. 143-139 requires code enforcement inspections to be performed within two business days of the request. That is a statutory duty, not a courtesy, and it sits alongside G.S. 160D-1104's requirement that the inspector complete every inspection requested for a scheduled visit and itemize exactly what failed.

Keep the permit and approved plans on site. Craven states its expiration rule in its own terms: six months from issuance to begin work, and once an inspection has been done, one year until the next inspection is required or the permit expires in the county's system — a rule that applies to every subsequent inspection on that permit. an NC building permit expires six months after issuance if work has not commenced (local ordinance can set less), and expires immediately if work stops for 12 months (G.S. 160D-1111) — changes from approved plans need written inspection-department approval first (G.S. 160D-1112).

Craven County permit search and official resources

Run a Craven County permit search, open the self-service portal, or reach Planning & Inspections with the official links below.

Frequently asked questions

Who issues building permits in Craven County?

Craven County Planning & Inspections, at 2828 Neuse Boulevard in New Bern. Planning runs on (252) 636-6618 and Inspections/Central Permitting on (252) 636-4987. The City of New Bern runs its own Development Services inspections division.

Does Craven County have an online permitting portal?

Yes — the county has launched a self-service Planning and Inspections portal allowing users to apply, schedule, and pay for permits from a phone, tablet, or computer, with email notifications. In-person applications and submittals are still accepted at the Neuse Boulevard office.

What wind zone is Craven County?

Zone II. The NC Department of Insurance sets manufactured-housing wind zones by distance from the ocean — Zone I for interior counties, Zone III for coastal ones, and Zone II in between. Craven is designated Zone II.

Can a manufactured home's wind zone be changed?

Not after construction, except by an engineer licensed in North Carolina. The zone rating is determined by how the home is built and anchored at the factory, which is why buying a Zone I home for a Zone II site is an expensive and not-easily-fixable mistake.

Do I need a flood elevation certificate in Craven County?

If the site is in an identified FEMA flood zone, yes — and a final flood elevation certificate is required before power can be turned on to the structure. Plan the surveyor into the construction schedule rather than the punch list.

How fast are Craven County inspections performed?

It is customary that an inspection will be performed within the next two days of the request, which matches the statutory duty under G.S. 143-139. Call after 8:30 a.m. on the day of your inspection to find out whether it will be morning or afternoon.

What is Craven County's permitting sequence?

Land Use Review first; then Environmental Health if a septic system or drinking water well is involved; then back to Central Permitting; then to Building Inspections for plan review. On sewered developments a letter of intent to serve from the supplying entity is required.

When does a Craven County building permit expire?

Six months from issuance to begin work. Once an inspection has been done, you have one year until the next inspection is required or the permit expires in the county's permitting system — and that rule applies to every subsequent inspection on the permit.

Is Craven County a CAMA county?

Yes — one of North Carolina's twenty. A CAMA permit attaches only where the project falls inside an Area of Environmental Concern, and it is a separate approval from the building permit on its own timeline.

What is inspected on a manufactured home in Craven County?

The home must be properly blocked and tied down — new homes per the factory manual, used homes per the North Carolina code book — with plumbing complete and the septic connection left uncovered, and all wiring completed to the National Electrical Code.

Does MCAS Cherry Point use Craven County permits?

No. Marine Corps Air Station Cherry Point is federal property outside county building jurisdiction. Work there runs through the installation's own process.

When is a general contractor licence required in Craven County?

On projects of forty thousand dollars or more, under G.S. 87-1 and the NC Licensing Board for General Contractors, with tiers capping single-project value at $750,000, $1,500,000, or without limit excluding land cost.

Simplify Craven County permitting with Alliance Permitting

A routed permitting sequence with four handoffs, a coastal permit on its own clock, a flood certificate standing between you and electricity, and a wind zone that cannot be fixed after the factory — Craven has more upstream dependencies than almost any county its size. A permit expediter for Craven County manages the whole chain.

250K+Permits approved
All 50States covered
21 YearsJurisdictional depth
Done-for-youWe file, you build

Trusted by leading builders, developers, and national contractors — 21 years of filing in the jurisdictions we write about.

Contractors and builders choose Alliance for Craven because the work is done by people who have stood at the counter:

  • The full routing managed — land use, environmental health, and plan review sequenced without dead time between handoffs.
  • Coastal and flood handled — CAMA started in parallel and the elevation certificate scheduled before it blocks power.
  • Complete oversight — every Craven permit and inspection tracked across your jobs in one place.

Alliance Permitting is a permit documentation and expediting service. We are not a law firm and do not provide legal advice, and we are not the permitting authority.

Ready to break ground in Craven sooner?

Let Alliance prepare, file, and track your Craven permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Craven County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.