Dare County, North Carolina Building Permit Guide

Dare County’s Planning Department permits construction only outside the six towns, through three offices: Manteo, Frisco on Hatteras Island and the Northern Beach office in Nags Head. Duck, Kill Devil Hills, Kitty Hawk, Manteo, Nags Head and Southern Shores each issue their own building permits.

Authority: Dare County Planning DepartmentCode: 2018 NC State Building CodePhone: 252-475-5870
County authority
Dare County Planning Department (unincorporated areas)
Towns with own permits
Duck, Kill Devil Hills, Kitty Hawk, Manteo, Nags Head, Southern Shores
Permit contact
252-475-5870 (Manteo office)
2025 population
38,245

In unincorporated Dare County, building permits come from the County Planning Department office for the project’s area: Manteo (252-475-5870), Frisco (252-475-5878) or Nags Head (252-475-5871). A home is charged $0.75 per heated and $0.40 per unheated sq ft, with electrical, plumbing and mechanical included. Inside the six towns, the town issues the permit.

What requires a permit in Dare County?

The County’s guidelines for unincorporated areas:

Permit required

  • All new construction
  • Remodels costing more than $40,000 (the limit in G.S. 160D-1110(c); Dare’s permit guidelines still say $15,000), and any remodel that touches load-bearing walls or enlarges the footprint
  • Any plumbing, electrical or mechanical work, whatever it costs
  • Storage buildings larger than 12 x 12 ft
  • Fences over 6 ft tall
  • Docks, piers, bulkheads, dune walks, pools and hot tubs
  • Moving or demolishing a building

No building permit

  • Replacing roof shingles, unless the plywood under them is also replaced
  • Fences 6 ft tall or less
  • Storage buildings 12 x 12 ft or smaller (an accessory structure under 12 ft on every side needs only a flood development permit)

A North Carolina licensed general contractor is required for building work or repairs costing $40,000 or more, and every contractor and subcontractor must hold the state licence for their trade.

Who handles permitting in Dare County?

The six towns permit themselves. Duck, Kill Devil Hills, Kitty Hawk, Manteo, Nags Head and Southern Shores are each responsible for planning and building permits inside their town limits; the County does not issue building permits there. Contact the town’s own planning or inspections office.

Unincorporated Dare County is served by the County Planning Department. You must apply to the office that covers the project’s location, although mechanical, plumbing and electrical sub-permits can be picked up at any of the three.

Short on time to read all of this?

Get a free quote →
Dare County Planning Department permit offices
OfficeAddress and phoneAreas served
ManteoCounty Administration Building, 954 Marshall C. Collins Drive, Room 148, Manteo, NC 27954; 252-475-5870Unincorporated Roanoke Island including Wanchese, and the mainland: East Lake, Manns Harbor, Mashoes and Stumpy Point
Frisco50347 N.C. Highway 12, Frisco, NC 27936 (mail PO Box 859, Buxton, NC 27920); 252-475-5878All of Hatteras Island, including Rodanthe, Waves, Salvo, Avon, Buxton, Frisco and Hatteras Village
Northern Beach2514 South Croatan Highway, Nags Head, NC 27959 (mail PO Box 1000, Manteo); 252-475-5871Baum Bay, Colington and Martin’s Point

Crew Hayes is the Chief Building Inspector. Septic permits and floor-plan approval come from the Dare County Department of Health & Human Services, and CAMA permit applications from any County planning office (252-475-5849).

Applications and the online portal

The County posts Residential and Commercial Building Permit Applications, a Contractor Release Form, Subcontractor Permit Applications and a Workers’ Comp Affidavit. Completed applications go to the right area office by email, mail or drop-off.

Licensed general contractors and electrical, plumbing, mechanical and gas subcontractors can register for Citizen Self Service to apply, schedule inspections and see results online. Registration has two steps: create the login, then complete the online access application so the Planning office can link your customer account. Owners acting as their own contractor must call Planning staff for instructions instead.

Planning fees for special use permits, rezonings, plats and variances are paid in person at a planning office; the County warns that it never asks for wire transfers or online payment for them.

Dare County permit fees

Building fees are set in the Schedule of User Fees and Charges attached to the County’s budget ordinance for fiscal year 2027, which keeps the heated and unheated area rates of the department’s September 1, 2017 schedule; the department’s fee page still shows the older $119 CAMA fee. Electrical, plumbing and mechanical work on new construction and remodels is included in the building permit.

Not sure this scope needs a permit?

Get a free quote →
Dare County building permit fees (fiscal year 2027)
WorkFee
One- and two-family dwellings, modular homes, additions$0.75 heated / $0.40 unheated per sq ft
Mobile home$0.50 per heated sq ft
Accessory structure over 12 ft in any dimension$0.75 / $0.40 per sq ft
Commercial buildings$0.95 heated / $0.65 unheated per sq ft
Hotels and motels / condos and apartments$50 / $100 per unit, plus the square-foot rate
Docks, piers, bulkheads, dune walks$250
Swimming pool or hot tub$300 each
Remodel or alteration$10 per $1,000 of cost
Flood development permit, with / without a building permit$75 / $50
CAMA minor permit$100
Change of use without remodel / moving permit$150 / $200
Demolition not tied to a replacement building$250
Minimum building permit fee$150
Re-inspection$100

For example, a house with 2,000 sq ft of heated space and 500 sq ft of unheated area comes to $1,500 plus $200, or $1,700. Starting work without a permit costs the original fee plus 50%, and failing to call for required inspections brings a penalty of 50% of the original permit cost. An expired permit renewed within 30 days is treated as a new permit.

Rather talk it over?

Call 1-855-478-4290 →

Electrical, plumbing, mechanical and gas permits

Trade work that is part of a new building or remodel is covered by the building permit. Stand-alone trade permits, which can be bought at any of the three County offices, cost:

  • Electrical: $150 for a service change, new service, service upgrade, added circuits or a generator.
  • Plumbing: $150 for fixture replacement, relocation or addition.
  • Mechanical: $150 for changing out up to three HVAC units, $50 per unit for four or more.
  • Gas installation: $150.

Each trade permit has a $150 minimum. Subcontractors use the County’s Subcontractor Permit Applications.

What to bring for a building permit

  • Survey: a blue-line survey by a registered North Carolina land surveyor showing natural ground elevation, the flood zone and the parcel identification number.
  • Water: on central water, the Dare County Water Department tap authorization and the receipt for hookup fees; otherwise the lot needs a private well.
  • Septic: a Health & Human Services septic permit, plus floor plans approved by Health & Human Services. For Martin’s Point, Colington and Hatteras Island these are handled at the Nags Head satellite office; for Roanoke Island, Manteo and the mainland at the Administration Building in Manteo.
  • Plans: three complete sets: one for the inspector, one for the job site and one for the contractor.
  • CAMA: a Coastal Area Management Act permit if the project is on the oceanfront, the sound or a canal.
  • Contractors: valid state licences for the contractor and every subcontractor.

Rather not deal with the Dare County building department?

Get a free quote →

How to apply for a Dare County building permit

1. Rule out the towns

If the lot is inside Duck, Kill Devil Hills, Kitty Hawk, Manteo, Nags Head or Southern Shores, apply to that town instead.

2. Pick the County office

Manteo for Roanoke Island and the mainland, Frisco for Hatteras Island, Nags Head for Baum Bay, Colington and Martin’s Point.

3. Order the survey

It must show the natural ground elevation, flood zone and PIN.

4. Get water, septic and floor-plan approvals

Water tap receipt or well plan, and the Health & Human Services septic permit and plan approval.

5. Check CAMA

Oceanfront, sound and canal lots may need a CAMA permit before building.

6. Submit the application and three plan sets

By email, mail or drop-off at the area office, or online once your Citizen Self Service account is linked.

Inspections in Dare County

Registered contractors can schedule inspections and see results in Citizen Self Service, and each area has its own inspector (numbers below). The County lists these inspections for new construction:

  • Footing, with trenches dug, grade stakes set and steel tied, before concrete.
  • Under-slab, where there is a slab.
  • Foundation: supports, crawl space levelling, clearances and drainage; piling inspections count as foundation inspections.
  • Framing, with blocking, bracing, fire stopping and any structural sheathing in place, and pipes, chimneys, vents and insulation baffles visible.
  • Rough-in for all concealed electrical, plumbing, fire protection and HVAC work; shower pans are inspected at this stage unless a separate courtesy inspection is requested.
  • Insulation, after the permanent roof covering is on and before wall covering.
  • Fire protection, where fire-protection materials are used.
  • Final for each trade; permanent power is not released until the final is approved.

Area inspectors: Baum Bay, Colington and Martin’s Point 252-475-5872; Roanoke Island and the mainland 252-475-5867; Buxton, Frisco and Hatteras Village 252-475-5876; Rodanthe, Waves, Salvo and Avon 252-475-5877. Each re-inspection costs $100.

Want this handled start to finish?

Get a free quote →

North Carolina building code

The 2018 North Carolina State Building Code family applies statewide, with the 2020 North Carolina Electrical Code; one- and two-family homes and townhouses still use the 2017 edition. The 2024 code has been delayed and cannot take effect before late 2027. The NC State Building Code and the delayed 2024 edition

Dare County permit search and official resources

Dare County permit FAQ

Inspections are where schedules slip.

Get a free quote →

Does Dare County issue building permits in Nags Head or Kill Devil Hills?

No. Duck, Kill Devil Hills, Kitty Hawk, Manteo, Nags Head and Southern Shores each issue building permits inside their town limits. The County permits only unincorporated areas such as Colington, Wanchese, the mainland and Hatteras Island.

Which County office do I apply to on Hatteras Island?

The Frisco satellite office, 50347 N.C. Highway 12, 252-475-5878, which covers all of Hatteras Island.

How much does a building permit cost for a new house?

$0.75 per heated sq ft and $0.40 per unheated sq ft, with the trade permits included; a 2,000 sq ft heated house starts at $1,500.

Do I need a permit for a fence or a shed?

Not for a fence 6 ft tall or less, or a storage building no larger than 12 x 12 ft. Bigger ones need a building permit.

Do I need a permit to re-roof?

Not to replace shingles, unless the plywood underneath is also being replaced.

Can a homeowner use the online portal?

Online registration is for state-licensed contractors; owners acting as their own contractor should call the Planning Department at 252-475-5870 for instructions.

Simplify Dare County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in North Carolina. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Dare County sooner?