Skip to main content
Municipal GuideNew YorkTown of Lansing · Tompkins County

Town of Lansing, New York Building Permit Guide

To get a building permit in Town of Lansing, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The Town of Lansing Planning & Code Enforcement Department at Town Hall, 29 Auburn Road, issues building permits through its OpenGov portal for the town outside the villages of Lansing and Cayuga Heights.

Authority: Town of Lansing Planning & Code EnforcementCode: 2025 Uniform Code, Town Code Ch. 108Phone: 607-533-7054
Authority
Planning & Code Enforcement29 Auburn Road, Lansing
Apply
OpenGov portalBuildings, decks, pools, sheds, variances
New house
$0.50 per sq ft$0.20 for an attached garage
Office hours
Mornings onlyMon–Thu 7:30–12:30, Fri to noon

In the Town of Lansing, building permits come from the Planning & Code Enforcement Department at Town Hall, 29 Auburn Road (607-533-7054), for all land outside the villages of Lansing and Cayuga Heights. Applications for buildings, decks, pools and sheds go through the town’s OpenGov permitting portal, and a new house is charged $0.50 per square foot of living space and $0.20 per square foot of attached garage.

What requires a building permit in Lansing?

Chapter 108 of the Town Code, rewritten in full by Local Law 2 of 2023, requires a building permit for work that must meet the Uniform Code or Energy Code. The town’s fee schedule names the permits it issues: houses, modular homes, mobile homes, additions, finished basements and plumbing work, garages, pole barns and workshops, prefabricated sheds, decks, roofs, pools, hot tubs, generators, solid-fuel stoves, solar systems, demolition, signs and commercial work.

Permit needed

  • New houses, modular and mobile homes
  • Additions, finished basements and residential remodels
  • Garages, storage buildings, workshops, pole barns; prefabricated sheds over 144 sq ft
  • Decks and roofs
  • Pools of every type, including storable ones, and hot tubs
  • Generators, wood, pellet and coal stoves, solar
  • Demolition and signs

No building permit (Ch. 108)

  • One-story sheds and playhouses at a home, 144 sq ft or less
  • Window awnings on a house
  • Painting, tile, carpet and portable appliances
  • Like-for-like equipment and minor repairs

Fences up to 6 feet are allowed as of right in every zone and location, including yards and buffers, and may run to a shared lot line, but not into a road right-of-way without the road owner’s written permission or where they block sight distance; deer fences and farm fences may reach 8 feet, and the finished side faces the road and neighbors. Retaining walls are likewise allowed in any location and may reach a shared lot line, as long as they do not encroach or block a neighbor’s driveway sight lines. Some uses and structures need a separate zoning permit ($100) from the code enforcement officer.

Solar arrays, wind turbines and battery storage systems are governed by Section 270-25.1 and its subsections whenever they are installed or changed; only routine or minor maintenance is excluded, and replacing or repairing half or more of a facility’s area or value never counts as minor. The Zoning Officer decides in writing what qualifies. A solar permit gives no right to unobstructed sunlight: securing any easement for it is up to the owner or installer.

What Lansing decides and what the state sets

The construction standards are the state Uniform Code and Energy Code. Lansing sets its own fee schedules, permit terms and pool rules (Chapter 108), zoning (Chapter 270, now being reviewed under a zoning code update), fire prevention (Chapter 137), flood damage prevention (Chapter 142) and stormwater management (Chapter 225).

Short on time to read all of this?

Get a free quote →

Lansing building department: who handles permitting

The Planning & Code Enforcement Department checks every building permit against the zoning code for setbacks and placement, issues building and zoning permits, inspects, and supports the Planning Board and Zoning Board of Appeals. Nathaniel Rogers is the Director of Planning; the staff also includes a code enforcement officer, a town planner and administrative assistants who answer the main line. Counter hours are mornings only, so call ahead or book an appointment.

Lansing permit contacts
OfficeDetails
Planning & Code EnforcementLansing Town Hall, 29 Auburn Road, Lansing, NY 14882; 607-533-7054; fax 607-533-3507
Office hoursMonday to Thursday 7:30 am to 12:30 pm or by appointment; Friday 7:30 am to noon
Online filingTown of Lansing permitting portal (OpenGov)
Board documentsPlanning Board and ZBA agendas, minutes and submittals
Village of LansingVillage Office, 2405 North Triphammer Road; 607-257-0424
Village of Cayuga HeightsCode Enforcement Office, 836 Hanshaw Road; 607-257-5536 ext. 104

The villages. Two incorporated villages lie partly or wholly in the town and both run their own permits. The Village of Lansing (3,814 residents, Census 2025 estimate) issues its own building and land use permits from its office on North Triphammer Road, with its own drawing requirements; the town’s pool law states that it applies only outside the village. Part of the Village of Cayuga Heights, most of which is in the Town of Ithaca, is in Lansing; its Code Enforcement Office handles new construction permits on all private property in the village. The Village of Lansing’s own office has an Ithaca mailing address, so go by the tax parcel, not the postal town.

Lansing permit types and filing rules

Residential permits

The OpenGov portal takes building, deck, pool and shed applications as well as complaints, variance and site plan requests. Chapter 108 asks for at least two sets of construction documents plus a PDF copy, showing structure, systems and energy compliance, and a site plan drawn from an accurate boundary survey. The department also posts an agricultural data statement form alongside its permit documents. Prefabricated sheds need plans for review. Homes on a private well should follow the state Health Department’s private well checklist the department posts, and small homesite construction uses the town’s erosion and sediment control plan form. The department keeps an incomplete application on file for 60 days and then withdraws it, and review fees are neither refundable nor transferable.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial buildings, remodels and apartment buildings pay $5.60 per $1,000 of estimated construction cost, with a $100 minimum. Public assembly spaces, apartment buildings and businesses receive fire and safety inspections ($50, or $100 with violations; $100 and $150 for buildings with five or more units), and fireworks and mass gatherings take event permits. Commercial solar costs $750 up to 5 acres plus $100 for each acre beyond.

What comes before the building permit

  • Site plan and special permits. Since March 1, 2026 the town’s planning fees run from $250 for a project costing up to $150,000 to $4,000 for one over $25 million; a special use permit review costs $300. Large projects may have to fund escrow for technical studies or pay a parks fee per dwelling.
  • Subdivision. Lot line adjustments and exempt subdivisions cost $125; minor subdivisions $250 plus $200 a lot; major subdivisions $500 plus $250 a lot.
  • Ground disturbance. A notice of ground disturbance permit costs $10, and a full stormwater and erosion control application $550 plus any legal or engineering review costs under Chapter 225.
  • Septic. On-site septic systems are designed and approved through the Tompkins County Health Department (607-274-6688).
  • Flood zones. The town and the Village of Lansing take part in the National Flood Insurance Program, with flood maps dated June 18, 2025. Chapter 142 sets the design flood elevation at the mapped base flood elevation plus 2 feet for new and substantially improved homes, and heating, electrical and plumbing equipment must sit at least 2 feet above the base flood elevation.

Lansing building permit fees

The building permit fee schedule the town posts (labeled 2025) has been in effect since January 17, 2024. Most fees carry a $100 minimum, and all fees double if work starts before the permit is issued.

Rather talk it over?

Call 1-855-478-4290 →
Town of Lansing building permit fees (effective January 17, 2024)
PermitFee
House, modular, mobile home on a private lot, addition, finished basement$0.50 per sq ft
Attached garage$0.20 per sq ft
Garage, storage building, workshop or pole barn$0.30 per sq ft ($100 minimum)
Mobile home on a rental lot$250
Residential remodel or commercial work$5.60 per $1,000 of estimated cost ($100 minimum)
Prefabricated shed$100
Deck / roof$125 each
Pool: storable / above-ground / in-ground$100 / $150 / $200
Generator or hot tub$75
Wood, pellet or coal stove$100
Residential solar$200
Demolition / sign$75 / $100
Zoning permit; code or zoning compliance letter$100 each
Re-inspection / missed appointment$75 / $50

For example, a 2,000 sq ft house with a 500 sq ft attached garage costs 2,000 × $0.50 plus 500 × $0.20, or $1,100; an unfinished basement is not counted. A $40,000 kitchen remodel that the square-foot rule does not cover is 40 × $5.60, or $224. Inspections outside business hours cost $150 an hour with a two-hour minimum. Event and specialty permits are on the same schedule: fireworks displays $300 per event, mass gatherings $250 per event and cell tower upgrades $200. On the planning side, an amended site plan without significant changes costs $250 and an unchanged special permit modification $150; significant changes are charged as new applications.

Trade permits and who may pull them

Electrical. Section 108-17.3 requires every electrical inspection in the town to be done by an electrical inspector qualified under state law to inspect to the National Electrical Code; the town’s fee schedule lists no electrical inspection fee of its own. The Town Code sets up no electrician, plumber or contractor license.

Rather not deal with the building department?

Get a free quote →

Manufactured homes. A mobile home on its own private lot is charged like a house, at $0.50 per square foot, while one placed on a rental lot pays a flat $250; modular homes also pay the house rate.

Plumbing and mechanical. Plumbing work and finished basements fall under the residential square-foot fee. Generators and hot tubs cost $75, and wood, pellet and coal stoves $100; solid-fuel appliances, chimneys and vents are a required inspection stage.

Pools. Pool permits follow Article II of Chapter 108: in-ground and above-ground pool permits run 180 days and storable pools 90 days, renewable, and every pool must be finished within 12 months of the first permit. A storable pool that has its certificate of compliance does not need a new permit each year if it goes back in the same spot.

How to apply for a Lansing building permit

1. Confirm town jurisdiction

Village of Lansing and Cayuga Heights parcels use the village offices.

2. Check zoning

Allowed uses and bulk tables for setbacks, height and coverage; any board approval first.

3. Get site approvals

County septic approval, ground disturbance or stormwater permit where needed.

4. Apply in OpenGov

Upload plans, site plan and supporting documents for the permit type.

5. Pay and receive the permit

Fees are doubled if work has already started.

6. Inspect and renew if needed

Book inspections; renew before the one-year expiry to avoid late fees.

Review, corrections and what causes delay

The town does not publish a review time. Applications left incomplete for 60 days are withdrawn and must be refiled. A permit lapses if work does not start within six months and lasts one year; it can be extended 12 months at a time up to three years from issue. The town mails a renewal letter a month before expiry: renewing on time costs the original fee again, late renewals add $50 within 30 days, another $50 at 31 to 60 days and $100 at 61 to 90 days, and after 91 days the town issues an appearance ticket with a $100 monthly penalty.

Lansing inspections and certificates

Book inspections with the department; a missed appointment that is not cancelled costs $50, payable before the next inspection is scheduled, and a failed inspection $75 to repeat. Chapter 108 lists the stages: the site before the permit, footings and foundation, slab preparation, framing, building systems, fire-resistant construction and penetrations, solid-fuel appliances and chimneys, Energy Code items and the final.

A certificate of occupancy or certificate of compliance closes the permit once the final inspection and any electrical approval are complete. Code and zoning compliance letters for a property cost $100 each.

Want this handled start to finish?

Get a free quote →

New York building code

New York builds on one statewide code, the Uniform Code, outside New York City; the 2025 edition and 2025 Energy Code took effect on 31 December 2025 (the all-electric provisions remain suspended by court order). Cities, towns and villages administer it, and local standards stricter than the code need Code Council approval. The Uniform Code in New York

Lansing permit FAQ

Does the town issue permits in the Village of Lansing or Cayuga Heights?

No. Both villages issue their own: the Village of Lansing at 607-257-0424 and Cayuga Heights at 607-257-5536 ext. 104.

How much is a building permit for a new house in Lansing?

$0.50 per square foot of living space plus $0.20 per square foot of attached garage, so $1,100 for 2,000 sq ft with a 500 sq ft garage.

Can I apply online?

Yes. Buildings, decks, pools, sheds, variances and site plans go through the town’s OpenGov permitting portal.

Do I need a permit for a fence?

The zoning law allows fences up to 6 feet, and deer or farm fences up to 8 feet, as of right anywhere but the road right-of-way. Chapter 108’s permit exemptions do not mention fences, so ask the department whether yours needs a building permit.

Do I need a permit for a storable pool?

Yes. A storable pool permit costs $100 and runs 90 days, and it need not be renewed each year if the pool goes back in the same place.

How long is a permit good for?

One year, extendable 12 months at a time up to three years; late renewals cost extra.

When is the office open?

Mornings: 7:30 am to 12:30 pm Monday to Thursday and to noon on Friday; other times by appointment.

Who does electrical inspections?

An electrical inspector qualified under state law to inspect to the National Electrical Code, as Section 108-17.3 requires.

Permit search and official resources

Planning Board and Zoning Board of Appeals agendas, minutes and submittals are posted in the public documents repository the town links from its department page. For a property’s permit history, request a code compliance letter ($100) or file a Freedom of Information request with the Town Clerk.

Inspections are where schedules slip.

Get a free quote →

Simplify Town of Lansing permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in New York. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Town of Lansing sooner?

Let Alliance prepare, file, and track your Town of Lansing permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Town of Lansing permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.