The City of Cortland Fire Department’s Code Enforcement Division, staffed by career firefighters, issues building permits and plumbing and heating permits inside the city and makes the construction inspections. Permits are paper applications filed at City Hall or by email; under the fee schedule the Common Council adopted on August 4, 2026, a building permit costs $100 for the first $5,000 of project cost and $10 per $1,000 above that, plus inspection and certificate fees.
What requires a building permit in Cortland?
Section 100-4 of the City Code requires a building permit for any work that has to meet the Uniform Code or the Energy Code: building, enlarging, altering, improving, moving or demolishing a structure. The city’s application lists the jobs it sees most, including driveways and parking lots, sheds, pools, sprinkler systems, all electrical work and roofing, including non-structural roofing.
Permit needed
- New buildings, additions, alterations and repairs
- Roof replacement (its own roof permit)
- Fences of any height (a zoning fence permit)
- Sheds over 144 sq ft; prefabricated sheds, replacement windows and siding use the reduced-fee form
- Pools, sprinkler systems and demolition
- New, replaced or enlarged driveways and parking lots
- Plumbing and heating work, on the separate heating and plumbing application
- Solar panels and signs
Exempt under Section 100-4
- One-story storage sheds and playhouses up to 144 sq ft at a one- or two-family home
- Pools less than 24 inches deep set entirely above ground
- Retaining walls under 3 feet that support no surcharge and impound no Class I, II or IIIA liquids
- Swings and playground equipment; wall-mounted window awnings
- Painting, wallpapering, tiling, carpeting and other finish work
- Listed portable appliances and like-for-like equipment replacement
- Repairs that do not touch structure, exits, building systems or fire protection
Fences are the trap: Cortland’s zoning chapter says no fence may go up without a permit from the Code or Zoning Officer. In residential districts fences may reach 6 feet in side and rear yards (8 feet along a shared line with a business or industrial district) but only 3 feet in a front yard.
What the city decides and what the state holds
The construction rules are the state’s; Cortland cannot tighten them without Code Council approval. The Common Council sets the fees by resolution (Local Law 7 of 2025 took the dollar amounts out of the City Code), licenses plumbers and heating technicians, approves electrical inspection agencies through its Electrical Board, and runs its own zoning, historic preservation, wellhead protection and flood rules, plus the Rental Certificate of Compliance program in force since January 1, 2026.
Short on time to read all of this?
Get a free quote →Cortland building department: who handles permitting
Code enforcement in the city belongs to the Fire Department. Its Code Enforcement Division reviews construction plans, does zoning reviews, issues building, plumbing and heating permits, inspects plumbing and heating installations in the field, and makes the annual inspections of multiple dwellings and places of public assembly. Land outside the city line is not covered by this office.
| Detail | Information |
|---|---|
| Code Enforcement Division | City Hall, 1st floor, 25 Court Street, Cortland, NY 13045 |
| Phone | 607-753-1741; fax 607-753-6051 |
| codesoffice@cortlandny.gov | |
| Hours | Monday–Friday, 8:30 a.m.–4 p.m. |
| Online payment | Code Office building permit and inspection fees through the city’s GovPayNow link on the Fees & Payments page |
| Population | 17,394 (Census estimate, July 1, 2025) |
Cortland permit types and filing
The Permits page posts seven applications: building, roof, heating, plumbing and right-of-way, operating permit, temporary or event, reduced-fee building permit, and fence. Paper copies are also available at the Code Enforcement Office or by email. Each contractor must hand in liability and workers’ compensation certificates, or a CE-200 exemption; the office forwards insurance certificates to the city’s insurance carrier for approval.
Residential permits
The building application asks for a certified survey map where the office requests one, a sketch of the work on the lot, and a floor plan and elevation drawing. Its instructions say plans need an architect’s or engineer’s seal except for farm buildings, homes under 1,500 sq ft and alterations under $20,000, and the applicant may ask for drawings to be waived for minor work. Page five is the application for the certificate of compliance or occupancy and must be completed. The form also prints the city’s design criteria for drawings: a ground snow load of 45/50, 90 mph wind (exposure B), seismic category B, severe weathering, frost depth of 42/48 inches, a winter design temperature of −2°F and ice shield required. Prefabricated sheds, replacement windows and siding go on the shorter reduced-fee form, which carries no application fee, only inspection and certificate charges.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial work uses the same building application with the occupancy classes marked, and commercial roofs are priced on the building schedule rather than the flat roof fee. Uses that need an operating permit under the Uniform Code file the city’s operating permit application ($150 for the first certificate), and temporary events have their own form.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
The office screens every application for zoning district, historic district, flood district, wellhead protection district, county health review, and whether a variance, special use permit or site plan review is needed. Exterior changes to a landmark or any property in a historic district, including fences, signs and paving, need a certificate of appropriateness from the Historic Commission first. Site plan review costs $150 ($100 for a minor improvement plan), a special use permit $150, an area variance $50 for a residential property, and a floodplain permit $50 plus a deposit of up to $1,000; a watercourse permit is $100.
Cortland building permit fees
The Common Council adopted the current Schedule of Fees, Fines and Penalties by Resolution 130 of 2026 on August 4, 2026, effective August 5; it replaced the 2026 schedule set by Resolution 196 of 2025 after a council committee reviewed code enforcement fees. The building application warns that a permit is not reviewed until the fee is paid.
| Project | Fee |
|---|---|
| Building permit, first $5,000 of project cost (not roof or fence) | $100 |
| Building permit, over $5,000 up to $100,000 | $10 per $1,000 |
| Building permit, over $100,000 | $5 per $1,000 |
| Roof, residential under $20,000 / other residential | $75 / $150 (commercial roofs on the building schedule) |
| Fence | $50 plus inspection |
| Solar, residential under $25,000 | $50 |
| Each inspection (initial, 1st and 2nd reinspection) | $30; 3rd reinspection $45; 4th and later $60 |
| Certificate of occupancy, one- or two-family / all others | $50 / $150 |
| Completion certificate, one- or two-family / all others | $50 / $150 |
| Certificate of zoning compliance | $100 one or two units; $150 + $5 per unit over 3 for three or more units; $200 commercial |
| Plumbing, new or extended, single-family home | $100 + $4 per fixture |
| Plumbing, new or extended, all other buildings / replacement | $150 + $4 per fixture / $50 + $4 per fixture |
| HVAC permit, per appliance | $50 under 150,000 BTU; $100 for 150,000–499,999; $200 for 500,000–999,999; $500 over 1,000,000 |
| Permit renewal | Half of the original permit price |
Rather talk it over?
Call 1-855-478-4290 →Inspections are charged on top of the permit: a cancellation or no-show costs $30, then $60, then $90, though the first cancellation is free. Work that starts before approval, or that draws a stop-work order, pays double the permit fee, and triple if the order is issued outside business hours, on a weekend or on a holiday. The heating and plumbing form still prints $300 for a 500,000–999,999 BTU unit; the adopted schedule sets $200.
Trade permits and who may pull them
Plumbing and heating. Chapter 214 (Local Law 2 of 2021) lets only master plumbers licensed by the City of Cortland, with their registered journeymen and apprentices, do new plumbing, extensions, house drains or sewers, with one exception: an owner working personally in their own primary residence, who must then send the Plumbing Inspector a monthly report of the work. Heating, ventilation, air-conditioning and gas piping are reserved for city master plumbers and city-licensed mechanical technicians. Annual license fees are $100 for a master or Type B plumber, $50 for a journeyman and $20 for an apprentice, and a plumber licensed by another New York city or county can apply for a Cortland license by reciprocity. Licensed plumbers and heating contractors keep an approved insurance certificate on file with the Plumbing Inspector.
Electrical. Cortland does not license electricians. Under Chapter 122, nobody may install or alter wiring until an inspection application is made with an inspection firm approved by the city’s Electrical Board or with the City Building Inspector, and the agency sends a copy of its certificate of compliance to the city. The building application has an “electrical work (all)” box, and Chapter 100 requires an electrical inspector to be certified and approved by the Code Enforcement Officer.
Septic. Where a lot needs an onsite wastewater system, the Cortland County Health Department’s Environmental Health Division issues the construction permit (607-753-5035); an engineer’s design is required for every new and replacement system, and the city’s application flags county health review.
Rather not deal with the City of Cortland building department?
Get a free quote →How to apply for a Cortland building permit
Find out whether the lot is in a historic district, flood district or the wellhead protection district, and whether zoning needs a variance, special use permit or site plan review.
Building, roof, fence, reduced-fee, or heating, plumbing and right-of-way, from the Permits page or by email from codesoffice@cortlandny.gov.
Sketch or sealed plans, a survey map if asked, and each contractor’s liability and workers’ compensation certificates or CE-200.
Pay at City Hall or online through the Code Office payment link; review does not start until the fee is in.
Allow at least 48 hours; files needing more review can take up to 30 days, and the office will say so.
Post the permit on site, call 607-753-1741 for inspections, and send any design change to the office before building it.
Review, corrections and what causes delay
The forms list the usual hold-ups: an unpaid fee, an incomplete application (the reduced-fee and fence forms say incomplete ones are not processed), insurance that the city’s carrier has not approved, and zoning or historic approvals still pending. A building permit becomes invalid if work has not begun within 12 months and expires 12 months after issue; the Code Enforcement Officer can renew it for half the original permit price.
Cortland inspections and certificates
Section 100-5 lists the inspections required where they apply: the site before the permit, footings and foundations (including post or pier holes), slab preparation, framing, electrical, plumbing and other building systems including underground and rough-in, fire-resistant construction and penetrations, solid-fuel appliances and chimneys, energy-code compliance, and the final. Every reduced-fee job is inspected too. The application’s residential reminder list shows what inspectors look for on a house: footing, pier and post-hole depth, drainage to daylight or a sump, damp-proofing, anchor bolts at least every 6 feet, sill sealer, insulation values for foundation, band joist and walls, beam, joist and header sizes, roof ventilation, a setback thermostat in each dwelling, hard-wired smoke detectors and bath fans where there is no window. Each visit is billed at the inspection rate, so failed inspections and missed appointments add cost quickly.
No new building or new part of one may be used until the division issues a certificate of occupancy or compliance ($50 for a one- or two-family home). A temporary residential certificate costs $100, then $150, $200 and $250 for later renewals; a temporary commercial certificate starts at $300. Rental properties also need the separate Rental Certificate of Compliance, whose fees depend on the number of units and occupants.
Want this handled start to finish?
Get a free quote →New York building code
New York builds on one statewide code, the Uniform Code, outside New York City; the 2025 edition and 2025 Energy Code took effect on 31 December 2025 (the all-electric provisions remain suspended by court order). Cities, towns and villages administer it, and local standards stricter than the code need Code Council approval. The Uniform Code in New York
Cortland permit FAQ
How much is a building permit in Cortland?
$100 for the first $5,000 of project cost, $10 per $1,000 from $5,000 to $100,000 and $5 per $1,000 above $100,000, plus inspection fees ($30 each) and the certificate fee. Roofs and fences have flat fees instead.
Do I need a permit for a fence?
Yes. Every fence needs a $50 permit from the Code or Zoning Officer, plus an inspection. Front-yard fences in residential districts are limited to 3 feet, side and rear fences to 6 feet.
Do I need a permit to replace my roof?
Yes, on the roof permit form: $75 for a residential job under $20,000 and $150 for other residential roofs; commercial roofs are priced on the building schedule.
Can a homeowner do their own plumbing in Cortland?
Only in their own primary residence, and they must file a monthly report of the work with the Plumbing Inspector. Everyone else must be a City of Cortland licensed master plumber or work under one.
Who inspects electrical work?
An inspection firm on the Electrical Board’s approved list, or the City Building Inspector. Apply for the inspection before starting the wiring; the agency sends its certificate of compliance to the city.
How long does a permit take?
At least 48 hours after the fee is paid, and up to 30 days for applications that need more review. The permit is good for 12 months.
Is Cortland in FEMA’s flood insurance program?
Yes. FEMA’s Community Status Book lists the City of Cortland as participating, with a current flood map dated March 2, 2010. Building in the flood district needs the city’s floodplain permit ($50 plus a deposit of up to $1,000).
Cortland permit search and official resources
The city has no public online permit search. To see past permits, certificates or inspection records for a property, file the city’s Request for Freedom of Information form; a buyer or lender can also order a $25 Certificate of Unpaid Fees and Open Matters from the city.
Inspections are where schedules slip.
Get a free quote →- Cortland Code Enforcement Division
- Cortland permit applications
- Fees & Payments (online code office payments)
- Schedule of Fees, Fines and Penalties (effective August 5, 2026)
- Common Council minutes, August 4, 2026 (Resolution 130)
- Building permit application
- Heating, plumbing and right-of-way permit application
- Fence permit application
- Reduced-fee building permit (sheds, windows, siding)
- Code of the City of Cortland (eCode360)
- Cortland FOIL form
- Cortland County sewage systems (septic permits)
- NYS Uniform Code adoption notice
Simplify City of Cortland permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in New York. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in City of Cortland sooner?
Let Alliance prepare, file, and track your City of Cortland permits while your crew stays on the job.
More New York permitting guides
Town of Camillus
Read guide →Town of Cicero
Read guide →Town of Clay
Read guide →Town of Cortlandt Building Permit Guide
Read guide →Town of DeWitt Building Permit Guide
Read guide →City of Dunkirk Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about City of Cortland permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.