In the Town of Fishkill, the Building, Fire and Zoning Department at Town Hall issues building, plumbing, mechanical, electrical and fire permits for private development everywhere in the town except the Village of Fishkill, which permits its own properties. Applications are complete paper packages filed at Town Hall at least two weeks before work is to start; a new house is charged $12 per $1,000 of estimated construction value under the fee schedule last revised September 30, 2026.
What requires a building permit in the Town of Fishkill?
The department’s rule is wide: no one may excavate, build, enlarge, alter, repair, demolish, change the occupancy of a building, or install plumbing, heating, electrical or fire suppression or detection systems without a permit, and pools, sheds, signs, accessory apartments and home occupations need permits too.
Permit needed
- New houses, factory-built homes, additions and garages
- Interior alterations, finished space, kitchens and bathrooms
- Sheds of any size (the town has no shed exemption)
- Decks, porches and impervious patios
- Above-ground and in-ground pools
- Furnaces, boilers, wood and pellet stoves, fireplaces and central air
- Electrical-only work, plumbing fixtures and demolition
- Conversions to an extended one-family use or an accessory apartment
No permit (Chapter 50 and the department)
- Fences that are not part of a pool enclosure
- Playground equipment, playhouses and treehouses at one- and two-family homes
- Pools under 24 inches deep set entirely above ground
- Retaining walls under 4 feet that support no surcharge and impound no Class I, II or IIIA liquids
- Painting, siding, finish work and roofing that replaces no structural members
- Replacing broken glass, a broken receptacle or a fuse; fixing a frozen pipe
The tree preservation law adopted as Local Law 6 of 2023 adds a separate clearing and tree removal permit, issued by the Building Inspector, for any tree 18 inches or more in diameter, trees in a wetland buffer or on a steep slope, protected native species, trees on regulated historic sites, and more than 15 trees a year on a lot of 4 acres or less. Dead and dangerous trees are exempt.
What the town decides and what the state holds
The Uniform Code sets the building standards, and the town cannot tighten them without Code Council approval. The Town Board sets the fee schedule by resolution, and the town runs its own zoning (Chapter 150, including historic structures and sites), freshwater wetland and watercourse permits under Chapter 82, flood rules under Chapter 78, land development and topsoil permits, and the list of electrical inspection agencies it accepts. Under Chapter 50 no permit or certificate may be issued for work that breaks the zoning law unless the Zoning Board of Appeals authorizes it in writing.
Short on time to read all of this?
Get a free quote →Town of Fishkill building department: who handles permitting
The town has one incorporated village, the Village of Fishkill, and it runs its own code office: a Building & Fire Inspector at Village Hall, 1095 Main Street, reviews plans and issues permits for village properties (845-897-4430), under the village’s own fee schedule. The town department covers every other parcel. The City of Beacon is a separate city with its own Building Department. Inside the town office, Building Inspector Joel J. Petrus also serves as Zoning Administrator and Floodplain Administrator, with a deputy building inspector and a fire inspector.
| Detail | Information |
|---|---|
| Building, Fire and Zoning Department | Town Hall, 807 Route 52, Fishkill, NY 12524 |
| Phone | 845-831-7800, ext. 3322 (department secretary); ext. 3321 (Building Inspector) |
| Hours | Town Hall open Monday–Friday, 9 a.m.–4 p.m. |
| Highway Department (town road driveways and road openings) | 2 Geering Way; 845-896-6013 |
| Village of Fishkill Building & Fire Inspector | Village Hall, 1095 Main Street; 845-897-4430 |
| Population | 22,937 townwide, including 2,147 in the village (Census estimates, July 1, 2025) |
Town of Fishkill permit types and filing
The Download Forms page has separate 2026 packages for residential renovations, garages, pools, sheds and electrical work, commercial renovations and commercial electrical work, plus deck and porch, demolition, floodplain development and sign applications. Each package warns that an application missing any required item will not be accepted.
Residential permits
File at least two copies of the plans and two copies of a plot plan; one copy stays in the department’s master file and the other comes back to you and must be kept on the job site. Contractors supply a liability certificate naming the Town as certificate holder and a workers’ compensation certificate (Acord forms are not accepted) or a CE-200; homeowners doing their own work must also file the CE-200. A contractor who applies needs the owner’s written authorization. Plans for a new house over 1,500 sq ft of living area must be sealed by a New York architect or engineer, and trusses and factory-built homes need stamped drawings.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
All commercial work needs sealed plans. Fees start at $250 for work valued up to $5,000, then add $12 per $1,000 up to $1 million and step down to $10, $8, $6 and $4 per $1,000 in higher value bands. Commercial buildings also take fire permits and annual fire inspections from the department’s fire inspector, with separate plan review fees for sprinkler work.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
The application checklist shows what has to be in hand first: Planning Board approval where a site plan or special use permit applies, any Zoning Board variance resolution, the county health department’s SAN 34 approval for a new well or septic system, a driveway permit from the town, county or state, water and sewer district approvals, and any wetland or floodplain permit. Wetland, watercourse and floodplain permits cost $250, plus a $500 engineering escrow when they are not part of a larger Planning Board action. Variances cost $350 for a residential property, plus escrow. Large projects may also need NYSDOT, NYSDEC or Dutchess County Department of Planning review.
Town of Fishkill building permit fees
The Town Fee Schedule, first adopted on January 4, 2017, was most recently revised on September 30, 2026 (after earlier 2026 revisions on January 1 and August 18). Chapter 50 says the Town Board sets it by resolution. The residential minimum is $75, and a certificate of occupancy or compliance issued with a permit costs nothing extra.
| Project | Fee |
|---|---|
| New house | $12 per $1,000 of estimated value |
| Addition (new finished area) | $0.40 per sq ft |
| Interior alteration of existing finished area | $0.30 per sq ft |
| Attached or detached garage | $0.40 per sq ft |
| Shed up to 400 sq ft | $75 |
| Open deck or porch / enclosed / impervious patio | $0.30 / $0.40 / $0.20 per sq ft |
| Pool, above-ground or in-ground | $75 |
| Heating equipment, new or replacement | $75 each |
| Kitchen, half bath or full bath plumbing | $20 each; future rough-in $10 |
| Electrical work only | $75 |
| Accessory apartment or extended one-family conversion | $125 |
| Demolition of a building or structure | $75 up to 250 sq ft, then $0.10 per sq ft |
| Removal of non-structural building features (mechanical etc.) | $75 up to $5,000 of value, then $5 per $1,000 |
| Home occupation permit (also needs a building permit) | $100; renewal $50 a year |
| Temporary construction, office or residential trailer | $125 a year |
| Land development permit (Ch. 78) / topsoil and excavation permit (Ch. 128) | $100 each, when not part of a larger application |
| Temporary certificate of occupancy | $100, $200 and $300 for successive 3-month periods |
| Inspection request or re-inspection | $75; after hours $150 an hour |
| Plan revision after approval | $75 |
Rather talk it over?
Call 1-855-478-4290 →The estimated value has to cover the whole job: architect’s fees, footings, foundation, excavation, septic, utilities and all labor and materials, but not land, surveying or site roads. On that basis a new house valued at $400,000 carries a permit fee of $4,800. Work started before a permit costs a $250 retroactive fee plus an application fee of 10% of the construction cost, and if an application is denied, half the fee can be refunded. Any town engineer or attorney charges must be paid before the final certificate.
Trade permits and who may pull them
The Town Code contains no licensing chapter for electricians, plumbers or home-improvement contractors; the department issues the plumbing, mechanical and electrical permits itself and relies on inspection.
Electrical. Chapter 61 makes it a violation to install or alter wiring before an inspection application is filed with an approved agency, or to connect it before that agency issues its certificate. The town’s 2026 electrical package lists 16 approved agencies, among them Commonwealth Electrical Inspection Service, Z3 Consultants, New York Board, Middle Department Inspection Agency, Tri-State Inspection Agency, The Inspector and State Wide Inspection Services, and the building application asks you to confirm the agency application has been filed. Electrical-only work carries a $75 town permit.
Plumbing and heating. New kitchens and baths are permitted per room on the building permit, and heating equipment at $75 a unit; the town inspectors check the work. The contractor’s insurance and workers’ compensation papers go in with each application.
Septic and wells. Where a new well or septic system is installed, the Dutchess County Department of Behavioral & Community Health must approve it (the SAN 34 process, 845-486-3404) before the town issues the building permit. Lots in a town water or sewer district also need the district’s approval, which the application checklist tracks.
Rather not deal with the building department?
Get a free quote →How to apply for a Town of Fishkill building permit
Properties inside the Village of Fishkill go to Village Hall; all other town parcels come to 807 Route 52.
Planning Board, Zoning Board, wetland, floodplain, tree removal, county health and driveway approvals that apply to the lot.
Renovation, garage, pool, shed, deck, electrical or demolition; fill in every item on its checklist.
Bring two sets of plans and two plot plans, insurance or CE-200, and the owner’s authorization to the department.
Pay the fee; minor work takes two to three business days to review, a new house two to four weeks, commercial work two to six weeks.
Book inspections with the department, file the electrical agency’s certificate, and receive the certificate of occupancy or compliance.
Review, corrections and what causes delay
Review time depends on the size of the project and how complete the plans are, and incomplete packages are refused outright. Changing approved plans needs the design professional to contact the department and costs a $75 revision fee. A permit expires after one year if work has not started (two three-month extensions are possible for good cause) and after two years if the work is not finished (one extension of up to a year); later renewals cost up to half the original fee, and after the third year the full current fee.
Town of Fishkill inspections and certificates
By signing the application, the owner consents to every inspection the Building and Zoning Department needs and lets the inspector enter until the certificate of occupancy issues. Inspection requests and zoning compliance inspections are billed at $75 each, rescheduled inspections can draw a $75 re-inspection fee at the Building Inspector’s discretion, and inspections outside business hours cost $150 an hour. Electrical work is inspected by the chosen agency, which files its certificate with the town.
A certificate of occupancy or compliance is included with the permit; one not tied to a permit, such as for a change of use, costs $100. When a new house is ready between November 1 and March 31 and the lawn or required paved driveway cannot be finished, the Building Inspector can issue the certificate against a landscaping or driveway bond (a $100 administration fee plus a bond amount the Building Inspector sets). Work started without a permit cannot receive a certificate until it is permitted and any code violations are corrected or removed.
Want this handled start to finish?
Get a free quote →New York building code
New York builds on one statewide code, the Uniform Code, outside New York City; the 2025 edition and 2025 Energy Code took effect on 31 December 2025 (the all-electric provisions remain suspended by court order). Cities, towns and villages administer it, and local standards stricter than the code need Code Council approval. The Uniform Code in New York
Town of Fishkill permit FAQ
Does the town issue permits in the Village of Fishkill?
No. The village has its own Building & Fire Inspector at Village Hall, 1095 Main Street (845-897-4430), and its own fee schedule. The town office handles the rest of the town.
How much is a permit for a new house?
$12 per $1,000 of estimated construction value, including labor, materials, foundation, septic and utilities but not land: $4,800 for a $400,000 house. The certificate of occupancy is included.
Do I need a permit for a shed or a fence?
A shed, yes: the town has no small-shed exemption, and a shed up to 400 sq ft costs $75. A fence that is not part of a pool enclosure needs no building permit, though zoning rules still apply.
Do I need a permit to replace my roof?
Not if the job replaces no structural members. Re-roofing that replaces rafters or other structural members needs a permit.
Who inspects electrical work?
One of the 16 agencies on the town’s approved list. File the inspection application before starting, and do not connect power until the agency has issued its certificate.
Do I need a permit to cut down trees?
Yes for any tree 18 inches or more in diameter, any tree in a wetland buffer or on a steep slope, and for more than 15 trees a year on a lot of 4 acres or less. Dead or dangerous trees can be removed without one.
Is the town in FEMA’s flood insurance program?
Yes. FEMA’s Community Status Book lists both the Town and the Village of Fishkill as participating communities, each with a current flood map dated May 2, 2012. The Building Inspector is the town’s floodplain administrator.
Town of Fishkill permit search and official resources
The town has no online permit lookup. The Building Department sells municipal file searches (a transcript of records) for $175 for a house and $300 or more for commercial property, with an optional $75 on-site verification inspection; other permit files are requested through the Town Clerk’s online FOIL portal.
Inspections are where schedules slip.
Get a free quote →- Town of Fishkill Building, Fire and Zoning Department
- Town of Fishkill permit applications (Download Forms)
- Town Fee Schedule (revised September 30, 2026)
- Residential renovation, repair and alteration package (2026)
- Residential electrical permit package and approved agencies (2026)
- Shed permit application (2026)
- Town Code Chapter 50, Building Construction Administration
- Town Code Chapter 140, Tree Preservation
- Code of the Town of Fishkill (eCode360)
- Village of Fishkill Building Department
- Town Clerk (FOIL requests)
- Dutchess County home construction guidance (septic and wells)
- NYS Uniform Code adoption notice
Simplify Town of Fishkill permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in New York. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Town of Fishkill sooner?
Let Alliance prepare, file, and track your Town of Fishkill permits while your crew stays on the job.
More New York permitting guides
City of Beacon
Read guide →Town of Beekman
Read guide →Town of East Fishkill
Read guide →Village of Freeport Building Permit Guide
Read guide →Village of Garden City Building Permit Guide
Read guide →Town of Gates Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Town of Fishkill permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.