The Town of East Greenbush Building & Code Department issues building permits and certificates for the whole town, which has no incorporated villages. Applications go in through the MyGov permit portal, by email to egcodes@eastgreenbush.org, by mail or at Town Hall; residential review takes about 7 to 10 days, and you pay by cash or check only after the department tells you the permit is approved (518-477-6225, weekdays 8:30 am to 4:30 pm).
What requires a building permit in East Greenbush?
Section 57-63 of the Town Code requires a permit before anyone constructs, erects, relocates, alters, repairs, extends, removes, demolishes or structurally changes a building or structure. The permit types the town offers in its portal show how far that reaches for homeowners.
Residential permits
- New houses, additions, repairs and remodels
- Decks, sidewalks and patios, garages, sheds, carports and barns
- Roofs (new, reroof or repair), fences and pools
- Electrical, plumbing and HVAC work, standby generators and EV chargers
- Fireplaces and wood, gas or pellet stoves, solar panels
- Driveways (new, resurfaced or widened) and lawn irrigation
- Demolition, site work, cut, fill and grading, and removal of fuel or septic tanks
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Separate approvals
- Driveways onto a public road also need the Commissioner of Public Works
- Septic systems need Rensselaer County Department of Health approval
- Grading or filling half an acre or more needs a grading permit
The town’s pool chapter counts any pool, hot tub or spa able to hold water more than 24 inches deep as a swimming pool: it must be fully enclosed by a permanent fence or wall and kept at least 10 feet from side and rear property lines.
No accessory building may stand in, or reach into, the front yard of a lot. A garage, shed or barn goes through the Garage/Shed/Carport/Barn/Accessory Structure permit, and the district schedules in the zoning chapter set how far it must sit from the lot lines.
What East Greenbush decides and what the state sets
The state Uniform Code and Energy Code set construction standards. The town sets permit procedure, expiry and stamped-plan rules in its zoning chapter, its 2025 Comprehensive Zoning Law (setbacks, uses, site plans), and local chapters on electrical inspections, pools, driveways, freshwater wetlands of half an acre or more on the town map, grading and filling, and flood damage prevention.
Short on time to read all of this?
Get a free quote →East Greenbush building department: who handles permitting
The Building & Code Department, created under Chapter 10 of the Town Code, combines the code enforcement officials, the Bureau of Fire Prevention and the Bureau of Zoning Enforcement. It issues building permits, operating permits and certificates of occupancy or compliance, inspects construction, carries out fire safety and property maintenance inspections and investigates complaints. Steve Boniface is the Building Department Director. East Greenbush has no incorporated villages, so the department serves the whole town of 16,561 people (Census 2025 estimate); the neighboring City of Rensselaer issues its own permits.
| Office | Details |
|---|---|
| Building & Code Department | Town Hall, 225 Columbia Turnpike, Rensselaer, NY 12144; 518-477-6225; fax 518-477-2386; egcodes@eastgreenbush.org |
| Hours | Monday to Friday, 8:30 am to 4:30 pm |
| Online permits | MyGov public portal: apply, estimate fees, look up an address |
| Records requests | Town Clerk, 518-477-7145 |
| Septic systems | Rensselaer County Public Health Engineering, 1600 7th Ave, Troy; 518-270-2632 |
East Greenbush permit types and filing rules
Residential permits
Each kind of work has its own permit template in MyGov, from a roof or fence to a new house, and the paper form covers the same list with boxes for fence height (4 or 6 feet) and length, pool type and size, driveway work, shed size, roof work and roof or ground solar. File the application with the plans or a scope of work in duplicate, with a sketch plan drawn to scale that shows dimensions, the location on the lot, existing buildings and the proposed grading, drainage and sediment control.
Insurance must come with each permit: general liability and workers’ compensation for a contractor, or an exemption form such as the CE-200 for an owner, with the Town of East Greenbush named as certificate holder or additional insured.
Stamped plans: page and code differ
The department’s permit page says any new construction, structural addition or renovation needs plans stamped by a New York architect or structural engineer. Section 57-63A of the adopted code sets the line at work larger than 576 square feet or costing more than $10,000. Where the two differ, ask the department before filing unstamped drawings for structural work. Whatever the job, the form asks for a plot plan with street names, the size of the property, and the size and setbacks of the proposed work, drawn in dotted lines beside the existing buildings in solid lines.
For rooftop or ground-mounted solar on a house, the town uses the state’s Unified Residential Solar Permit application and posts the state guide to solar permitting and inspection beside it. A lender or buyer who needs proof that a property meets zoning can request a letter of zoning compliance through the portal.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Commercial templates cover new construction, additions, repairs and modifications, roofing, fences, signs, paving, irrigation, wireless facilities and a separate commercial electrical, HVAC, plumbing, mechanical and EV charging permit, plus fire and life safety and operating permits. Review time for non-residential permits varies with the project.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Planning Board site plan, special use and subdivision approval, and Zoning Board of Appeals variances, obtained in writing and filed with the building application.
- Rensselaer County Department of Health approval where the lot needs a septic system or well.
- Driveways: a permit from the Commissioner of Public Works and the code official before building or improving a driveway onto a public road, a culvert where it crosses a ditch, and a grade of no more than 10% up to the building setback line.
- Grading: a Building Department grading permit to remove vegetation or topsoil or grade or fill half an acre or more; the Planning Board usually wants a full erosion plan on slopes over 15%.
- Town-mapped freshwater wetlands: draining, dredging, filling, building or installing a septic system in a mapped wetland needs a town wetlands permit. The application goes to the Town Clerk with a $5 fee and a map, is referred to the Conservation Board and Planning Board, and usually goes to a public hearing 30 to 60 days after filing; a bond can be required.
- Flood zones and wetlands: the form warns that a permit does not confirm whether the lot is in a flood zone or wetland. East Greenbush participates in the National Flood Insurance Program with a flood map dated March 18, 1980.
- Data centers: Local Law 3 of 2026, adopted July 15, 2026, places a temporary moratorium on data centers; the hearing notice described it as a pause on permit, site plan and other land use applications for six months from the effective date, with one six-month extension allowed.
East Greenbush building permit fees
Permit fees are set in a schedule that the Town Board establishes and reviews each year (Section 57-63F). The code and the department’s permit page refer fee questions to the Building Department at 518-477-6225, and the MyGov portal has an estimate tool. What the published rules say about money:
Rather talk it over?
Call 1-855-478-4290 →| Item | Rule or amount |
|---|---|
| Building permit | Town Board fee schedule; quoted by the department |
| When to pay | After approval; do not send payment with the application |
| How to pay | Cash or check payable to the Town of East Greenbush |
| Refunds | Permit fees are non-refundable |
| Work started without a permit | Permit fee plus an inspection fee |
| Certificate of occupancy | Separate fee with the application |
| Town wetlands permit application | $5, filed with the Town Clerk |
| County septic plan review, new house | $300 (Rensselaer County) |
| County permit to construct a septic system | $75 conventional; $150 with fill |
Because the schedule is reviewed every year, ask for the current figure for your exact scope when you file; the department records the fee on the application before it issues the permit. The septic figures are from the Rensselaer County Department of Health sewage fee schedule effective October 15, 2015. Third-party electrical inspection is billed by the agency you hire, not the town.
Trade permits and who may pull them
Electrical. Chapter 14 of the Town Code deputizes approved third-party electrical inspectors as the town’s agents. It is a violation to install or alter wiring until an application for inspection has been filed, or to energize it before the inspector issues a temporary certificate or certificate of compliance, and no certificate of occupancy issues until that inspection is done. The town also offers residential and commercial electrical permits in MyGov.
Plumbing, HVAC and fuel. Plumbing, HVAC, generator, fireplace and stove work each has its own permit type, and so does removing a fuel or septic tank.
Septic. New and replacement septic systems are reviewed and inspected by Rensselaer County’s Environmental Health staff, on plans from a New York licensed professional.
Fire prevention. The Bureau of Fire Prevention sits inside the department, so commercial fire and life safety permits, operating permits for events and fireworks stands, and fire safety and property maintenance inspections are handled by the same office that issues building permits.
Rather not deal with the building department?
Get a free quote →Licensing. The Town Code has no electrician, plumber or contractor licensing chapter; what the town checks is the insurance certificate filed with each permit.
How to apply for an East Greenbush building permit
Check setbacks and whether a variance, site plan or county health approval is needed.
Choose the matching template in MyGov or tick the box on the paper form.
Plans or scope of work and a scaled sketch plan, stamped where required.
Upload to MyGov, email egcodes@eastgreenbush.org, mail it, or bring it to Town Hall.
When notified, pay at the Building Department by cash or check.
Call 811 before digging, give 24 hours’ notice for each visit and close out with the right certificate.
Review, corrections and what causes delay
Residential review takes about 7 to 10 days. If the code official approves the plans, one copy of the application and plans comes back endorsed as approved; a disapproval comes back with the reasons in writing, and it can be appealed to the Zoning Board of Appeals. Applications stall when the board or county approvals the code requires are missing, when the sketch plan does not show grading and drainage, or when the insurance certificate does not list the town. A permit expires one calendar year after it is issued; ask for an extension before then, because work under an expired permit is a violation.
East Greenbush inspections and certificates
The application form asks for 24 hours’ notice for every inspection, and inspections must be called in before and during construction. The code enforcement official inspects the finished work against the approved plans before issuing a certificate. At completion you need a certificate of compliance for modifications to an existing building, a certificate of occupancy for new construction or a new occupancy, and the third-party electrical approval for all electrical work. A certificate of occupancy is also required to change the use of a building or land. If work strays from the approved plans or is unsafe, the official can issue a stop order, and nothing more may be built until it is lifted. The department carries out fire safety and property maintenance inspections; a resolution on the Town Board’s October 21, 2026 agenda would set a November 18, 2026 public hearing on a local law making those inspections part of the Town Code.
Want this handled start to finish?
Get a free quote →New York building code
New York builds on one statewide code, the Uniform Code, outside New York City; the 2025 edition and 2025 Energy Code took effect on 31 December 2025 (the all-electric provisions remain suspended by court order). Cities, towns and villages administer it, and local standards stricter than the code need Code Council approval. The Uniform Code in New York
East Greenbush permit FAQ
Can I apply for an East Greenbush permit online?
Yes. The town’s MyGov portal takes permit applications, and you can also email, mail or hand in the paper form.
How long does review take, and how long does the permit last?
Residential review takes about 7 to 10 days; non-residential review varies. A permit is void one calendar year after issue unless the department extends it.
Do I need a permit for a fence?
Yes. The town has residential and commercial fence permits, and the form asks for the height (4 or 6 feet) and total length.
How close to the property line can a pool go?
No closer than 10 feet to a side or rear line, and it must be enclosed by a permanent fence or wall.
Do I need a permit to pave or widen my driveway?
Yes. There is a driveway permit for new, resurfaced or widened driveways, and one onto a public road also needs the Commissioner of Public Works.
Do I need a permit for a shed?
Garages, sheds, carports and barns have their own residential permit type in MyGov; ask the department before skipping it for a small shed, and remember that no accessory building may be placed in the front yard.
What if I started work before getting a permit?
You still have to apply with plans and pay the permit fee, plus an extra inspection fee under Section 57-62K of the Town Code.
Who inspects electrical work?
An approved third-party electrical inspector, whose certificate is needed before power is connected and before a certificate of occupancy.
Permit search and official resources
The MyGov portal’s Address Lookup shows permit and code activity recorded at an address. For older permits, certificates of occupancy or plans, file a Freedom of Information Law request with the Town Clerk (518-477-7145) using the town’s FOIL form.
Inspections are where schedules slip.
Get a free quote →- Building & Code Department
- Building permit submittal and payment rules
- Building permit application form
- MyGov permit portal and address lookup
- Town Code Chapter 57, Zoning
- Chapter 14, Electrical Inspections
- Chapter 18, Swimming Pools
- Chapter 13, Driveway Construction
- Chapter 52, Grading and Filling
- Town Board agendas and minutes
- FOIL request form
- Rensselaer County Public Health Engineering (septic)
- NYS code adoption notice
Simplify Town of East Greenbush permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in New York. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Town of East Greenbush sooner?
Let Alliance prepare, file, and track your Town of East Greenbush permits while your crew stays on the job.
More New York permitting guides
Rensselaer County
Read guide →Town of Brunswick
Read guide →Town of Schodack
Read guide →Town of East Hampton Building Permit Guide
Read guide →Town of Eastchester Building Permit Guide
Read guide →Town of Elma Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Town of East Greenbush permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.