Skip to main content
Municipal GuideNew JerseyEatontown Borough · Monmouth County

Eatontown Borough, New Jersey Building Permit Guide

To get a building permit in Eatontown Borough, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Eatontown’s Construction Department at Borough Hall, 47 Broad Street, issues construction permits; a borough zoning permit comes first for almost any exterior or interior project, and inspections are booked only online or by e-mail.

Authority: Eatontown Construction DepartmentZoning permit: $50 most home projectsPhone: 732-389-7619
Authority
Construction Department47 Broad Street, Eatontown
Zoning permit
$50In-ground pool $175; new home $250
Inspections
SDL portal or e-mailNo phone scheduling
Resale / rental
Housing COApply through SDL; 732-860-5513

The Eatontown Construction Department, at Borough Hall, 47 Broad Street (732-389-7619), enforces the Uniform Construction Code and issues building, electrical, plumbing, mechanical and fire permits; Django Wiegers is the Construction Official. The borough requires a zoning permit before nearly any construction, alteration or repair of a structure or land, usually $50 for a home project. Inspections cannot be booked by phone, only through the SDL portal or by e-mail, and the Housing Department inspects homes before they are sold or rented.

What requires a building permit in Eatontown?

For construction permits the borough follows the state’s Uniform Construction Code. Ordinary maintenance (N.J.A.C. 5:23-2.7) is exempt from permits, notice and inspection, minor work (5:23-2.17A) needs a permit but can start after the Construction Department is notified, and everything else waits for the permit to issue. Eatontown’s zoning rule is wider: a zoning permit is required before the erection, construction, alteration or repair of any structure or land. When in doubt, the Land Use page asks residents to call 732-389-7615 before starting to confirm whether a building permit is needed too.

Zoning approval list (not limited to)

  • Additions, interior alterations and finished basements
  • Decks, patios, walkways and concrete slabs
  • Sheds, gazebos, awnings and other accessory structures
  • Pools, above-ground and in-ground
  • Fences, driveways (repair or replacement) and signs
  • Generators, grading, drainage, roof or ground solar and commercial uses

Other borough approvals

  • Street opening permit for curb cuts (Borough Code 285-5)
  • Tree removal and trimming
  • Dumpster and clothing bin permits
  • Special event permits
  • Fire permits and life hazard use registration
  • Housing certificate of occupancy on sale or rental

What Eatontown decides and what the state holds

The construction codes are set by the state for every municipality. Eatontown sets its own zoning and land use rules, the zoning fees on its applications, its street opening and tree rules, the housing inspection on resale and rental, and the conditions it attaches to approvals, such as the notarized affidavit it asks for when a basement is finished, confirming the space will not be used for sleeping. DCA’s roster lists the state Department of Community Affairs as Eatontown’s elevator subcode official, while the borough’s page says it uses third-party inspectors for elevator inspections.

Eatontown building department: who handles permitting

The Construction Department reviews and inspects construction, plumbing, heating and air conditioning, fire protection and electrical work before a certificate of occupancy is issued. The Construction Official also serves as a fire inspector and, on DCA’s roster (as of September 2, 2026), holds the building and fire protection subcode posts; borough officials hold the electrical and plumbing posts and the Department of Community Affairs is listed as elevator subcode official. Zoning is a separate office in the Land Use, Zoning & Code Enforcement department, and housing inspections for sales and rentals are run by the Housing Department, all in Borough Hall.

Short on time to read all of this?

Get a free quote →
Eatontown permit contacts
DetailInformation
Construction DepartmentBorough Hall, 47 Broad Street, Eatontown, NJ 07724; 732-389-7619 (Construction Official); technical assistants 732-389-7618 and 732-389-7615; fax 732-935-1822
E-mailco@eatontownnj.com; permits and inspections: Permits@eatontownnj.com
HoursMonday to Friday, 8:30 a.m. to 4:30 p.m.
Construction OfficialDjango Wiegers
Zoning Office732-389-7611; Planning and Zoning Board secretary 732-389-7617
Housing Department2nd floor, Borough Hall; 732-860-5513 or 732-389-7616
Bureau of Fire Safety732-720-2582

Eatontown permit types

Eatontown posts the full set of UCC forms on its Applications & Forms page: the construction permit application and the building, electrical, plumbing, mechanical, fire protection and elevator technical sections, with an owner’s information certificate, a chimney verification form and a backflow preventer testing form. Two checklists, one for framing and one for the air barrier and insulation, show what the inspector will look for at those stages.

Residential permits

  • The zoning application. It needs proof that property taxes are current, one copy of a current survey or plot plan signed and sealed by a land surveyor, and one set of small architectural plans showing the zoning data and existing and proposed setbacks. Incomplete applications are returned unprocessed.
  • Equipment. Air conditioners and generators must be shown on the survey with specifications proving they are screened from the street.
  • Pools. Every pool needs a fence, shown on the plan with its type and height and the location of the filter and heater. In-ground pools also need a grading plan, filed as a PDF and one paper copy to scale.
  • New houses. A new home carries the $250 zoning fee with grading review; a revised grading plan is $100.
  • Finished basements need building and zoning approval, a floor plan with every room labeled by use, and the notarized basement affidavit.

The Zoning Office’s detail sheets add the local rules behind those permits. Fences and walls in residential areas may be no more than 2½ feet high within 25 feet of a street line and 6 feet elsewhere; business-zone fences are capped at 6 feet and industrial ones at 8 feet unless needed for security. Any wall 3 feet or taller needs signed and sealed structural plans, every retaining wall needs a grading plan, and a fence on a public right-of-way or easement needs a revocable license from the borough. Sheds and other accessory structures may not be built on a lot without a main building, may not be lived in and may not sit in a front or side yard. Pool setbacks (side, rear and, on corner lots, street) depend on the zone, from 7 and 5 feet in the R-10 zone to 25 and 10 feet in the R-32 zone, and they apply to the filter, deck and patio too; Chapter 289 of the Borough Code requires a fence at least 4 feet high with a self-locking gate, and a temporary fence throughout construction.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Non-residential work uses the borough’s separate non-residential zoning application, and commercial uses are on the zoning approval list. The Bureau of Fire Safety points new businesses to the forms for registering with the Fire Prevention Bureau, applying for fire permits and life hazard use registration, and obtaining a local certificate of occupancy, all on the Applications & Forms page. Site plans and variances go to the Planning Board or Zoning Board on the borough’s combined Planning and Zoning Board application, with agendas in the borough’s agenda center.

What comes before the construction permit

  • Zoning permit from the Zoning Office, with a scaled survey showing all existing and proposed improvements.
  • Planning Board or Zoning Board approval where a variance or site plan is needed.
  • Grading review by the borough for new homes and in-ground pools.
  • Street opening permit from the Borough Clerk where a driveway needs a curb cut.
  • Soil erosion and sediment control certification from the Freehold Soil Conservation District for 5,000 square feet or more of disturbance (4000 Kozloski Road, Freehold, 732-683-8500).

Eatontown permit costs and fees

The construction permit fee schedule is part of the Borough Code on eCode360; the Construction Department’s pages and forms do not print it, so ask the department (732-389-7619) for the fee on a particular permit. The state DCA training surcharge is collected with each construction permit. The zoning fees on the borough’s residential zoning application are:

Eatontown residential zoning permit fees (Zoning Department application)
Residential zoning permitFee
Fence, patio, shed, deck, generator, A/C unit, finished basement, garage, hot tub, walkway, porch or driveway$50
Addition$50
Above-ground pool$100
In-ground pool$175
New home with grading review$250
Revised grading plan for a new home$100

Rather talk it over?

Call 1-855-478-4290 →

The borough’s fence and wall sheet charges $100 for a commercial fence permit, and its pool sheet lists a $50 zoning fee, lower than the $100 and $175 pool fees on the residential application; ask the Zoning Office which applies before paying. Zoning fees can be paid by cash, check, money order or card, with checks made out to the Borough of Eatontown. Housing inspection fees for resale and rental certificates are paid online or by check at the Housing office after the SDL application is filed.

Trade permits and who may pull them

The Construction Department’s inspectors cover building, plumbing, electrical, mechanical (heating and air conditioning) and fire protection work, each on its own technical section of the permit application.

  • Contractor registration. The borough posts the state’s instructions for registering as a home improvement contractor business. New Jersey has no general contractor license; home improvement contractors register with the Division of Consumer Affairs and new-home builders with DCA.
  • Trade licenses. Electrical contractors, master plumbers and HVACR contractors hold state licenses. Owners doing work on their own home are exempt from contractor registration.
  • Plumbing extras. Backflow preventers have their own testing form, and a plumbing chimney verification form is posted with the plumbing technical section.

How to apply for an Eatontown building permit

1. Confirm what you need

Call the Construction Department (732-389-7615, option 5) or the Zoning Office (732-389-7611) before starting work.

2. File the zoning permit

Submit the residential or non-residential zoning application with proof of paid taxes, a sealed survey and plans, and the fee.

3. Get board or grading approval

Apply to the Planning or Zoning Board if needed, and file a grading plan for a new home or in-ground pool.

4. Complete the UCC forms

Fill in the construction permit application and every technical section that applies, using the borough’s posted forms.

5. Submit to the Construction Department

File the package with the department at Borough Hall, 47 Broad Street; permit questions go to Permits@eatontownnj.com.

6. Pay and schedule

Pay the permit fees, then request each inspection through SDL or by e-mail once that stage of work is complete.

Rather not deal with the Eatontown Borough building department?

Get a free quote →

Review, corrections and what causes delay

The UCC gives the department 20 business days to approve or deny a complete application with its prior approvals (N.J.A.C. 5:23-2.16). Eatontown warns that major projects under construction in town keep the department busy and asks applicants for patience when submitting permits and booking inspections. On the zoning side, an application missing any requested item is returned unprocessed.

Inspections and certificates in Eatontown

Book inspections through the borough’s SDL portal page or by e-mail to the technical assistant or Permits@eatontownnj.com; the department will not schedule inspections over the phone. The request form covers building, plumbing, electrical, mechanical and fire inspections, and the borough asks that requests not be sent until that stage of the work is finished. Keep the permit number handy. Do not schedule a closing before the final building inspections are done.

For sales and rentals, the Housing Department issues the certificate of occupancy. Apply for a resale, rental or multiple dwelling inspection in the SDL portal, then pay online or bring a check to the Housing office on the second floor of Borough Hall. The 2026 housing checklist covers one- and two-family homes sold or rented and apartment units: all utilities on, building permits closed, smoke detectors on each level and CO detectors near sleeping areas no more than 10 years old, GFCI protection in kitchens, baths, outside and in unfinished basements, at least 60-amp electrical service, a dedicated outlet for the sump pump, 4-inch house numbers and lead paint certification every three years for rentals built before 1978. A failed inspection needs a re-inspection before the certificate is approved.

New Jersey building code in Eatontown

Eatontown enforces the UCC through its own Construction Department. The 2024 I-codes, the 2024 National Standard Plumbing Code and the 2023 NEC apply to applications from August 17, 2026, and a complete application with all prior approvals may use the 2021 codes and 2020 NEC until February 17, 2027. FEMA’s Community Status Book lists the Borough of Eatontown (community 340293) as participating in the National Flood Insurance Program, with flood maps effective June 20, 2018.

New Jersey has one Uniform Construction Code for every municipality; the town supplies the enforcing agency, the fee ordinance and the zoning approvals. New Jersey rules

Eatontown permit search and official resources

Permit history, plans and certificates are borough records: request them on the OPRA request form posted under the Borough Clerk’s forms. A permit refused by the Construction Department can be appealed to the Monmouth County Construction Board of Appeals in Freehold within 15 days of written notice (732-431-7461).

Want this handled start to finish?

Get a free quote →

Inspections are where schedules slip.

Get a free quote →

Eatontown building permit FAQs

Do I need a zoning permit for a fence or shed in Eatontown?

Yes. Fences, sheds, decks, patios, generators, A/C units and similar home projects each need a $50 residential zoning permit.

Can I schedule an inspection by phone?

No. Use the SDL portal or e-mail the department, and only once the work for that inspection is complete.

How much is a zoning permit for a pool?

$100 for an above-ground pool and $175 for an in-ground pool, which also needs a grading plan and a fence.

What do I need to sell my house in Eatontown?

A housing certificate of occupancy: apply for the resale inspection in SDL, pay the Housing Department and make sure all building permits are closed.

Can I finish my basement?

With building and zoning approvals and a notarized affidavit that the basement will not be used for sleeping.

How tall can a fence be in Eatontown?

On residential property, 2½ feet within 25 feet of a street line and 6 feet farther back; walls of 3 feet or more need sealed structural plans.

Where can a pool go on my lot?

Behind the zone’s side and rear setbacks, which also apply to the filter, deck and patio, inside a fence at least 4 feet high with a self-locking gate.

Who inspects elevators in Eatontown?

DCA’s roster names the Department of Community Affairs as elevator subcode official; the borough’s page says it uses third-party elevator inspectors.

Simplify Eatontown Borough permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in New Jersey. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Eatontown Borough sooner?

Let Alliance prepare, file, and track your Eatontown Borough permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Eatontown Borough permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.