Skip to main content
Municipal GuideNew JerseyEdgewater Borough · Bergen County

Edgewater Borough, New Jersey Building Permit Guide

To get a building permit in Edgewater Borough, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Edgewater’s Building Department in Room 223 of Borough Hall, 55 River Road, issues construction permits, certificates of occupancy and resale certificates, and takes in every Planning Board and Board of Adjustment application.

Authority: Edgewater Building DepartmentCode: NJ UCC (N.J.A.C. 5:23)Phone: 201-943-1700 ext. 3127
Authority
Building Department55 River Road, Room 223
Hours
Mon–Fri 9–5201-943-1700 ext. 3127
Resale CCO
$100 per unitPlus Fire Bureau COC $100
Tree permits
From $25 per treeOrdinance 2024-004

In the Borough of Edgewater, the Building Department on the second floor of Borough Hall, 55 River Road, Room 223 (201-943-1700 ext. 3127, weekdays 9 a.m. to 5 p.m.) issues construction permits and certificates of occupancy, with Art Sopelsa as Construction Official and building subcode official. Every permit application goes in with a construction permit jacket, and a sale or rental needs both a Building Department certificate of continued occupancy and a Fire Prevention Bureau certificate of compliance.

What requires a building permit in Edgewater?

Edgewater relies on the state Uniform Construction Code for the line between permit and no permit: under it, ordinary maintenance needs no permit or notice, minor work needs a permit but may start once the office is told about it, and all other construction waits for an issued permit. The borough’s application list shows what it handles in practice:

Construction permits

  • Building work: new buildings, additions, alterations and renovations of existing buildings
  • Electrical, plumbing, fire protection and mechanical work, each on its own application
  • Replacement of fuel-fired equipment, with the chimney certification form
  • Demolition and new construction certificates of occupancy

Other borough permits

  • Dumpster permits
  • Tree removal on public property over 2.5 inches caliper, or any non-street tree of 6 inches caliper or more
  • Certificates of occupancy for every new business, sale or rental
  • Fire Prevention Bureau certificates of compliance on sales and rentals

The borough’s Codes & Standards page still shows code editions from 2015; the state has since adopted newer codes, so use the editions in the code section below.

What Edgewater decides and what the state holds

The building, electrical, plumbing and fire standards belong to the state. Edgewater chooses the enforcing agency and its fee ordinance, runs zoning through the Building Department, which answers zoning questions and handles board applications and escrows, and sets local rules on tree removal (Ordinance 2024-004), rental registration (Ordinance 204-12), fire-bureau registration of businesses and multi-unit buildings (Ordinance 1235-2002), and certificates on sale (Ordinance 157-10). The department also links the borough’s 2017 short-term rental ordinance (Ordinance 2017-1546), which matters before a unit is offered for short stays.

The Building Department’s correspondence page posts its answers to residents’ questions. One reply explains that a commercial site that had been part of the former Alcoa aluminum plant, like the rest of that campus now occupied by a residential community, was cleaned up to NJDEP standards years ago. The same page holds the borough’s June 19, 2020 Fair Share Housing agreement, posted with the notice of a partial fairness hearing in its affordable housing case.

Short on time to read all of this?

Get a free quote →

Edgewater building department: who handles permitting

The Borough of Edgewater is its own enforcing agency. DCA’s Local Construction Contacts roster (as of September 2, 2026) lists the borough’s construction official, who is also the building subcode official, borough officials in the electrical, fire protection and plumbing posts, and the private New Jersey Elevator Inspection Agency as elevator subcode official. The Building Department also schedules inspections for all of the inspectors, handles property maintenance complaints for multiple dwellings and commercial buildings, and processes Planning Board and Board of Adjustment applications.

Edgewater Building Department contacts
DetailInformation
OfficeBorough Hall, 55 River Road, 2nd floor, Room 223, Edgewater, NJ 07020
Construction OfficialArt Sopelsa, 201-943-1700 ext. 3127
Certificates of occupancy201-943-1700 ext. 3126
Tree permits201-943-1700 ext. 3125
One- and two-family property maintenance complaints201-943-1700 ext. 3150
HoursMonday to Friday, 9 a.m. to 5 p.m.
Fax201-941-7767 (DCA roster); Borough Hall 201-943-9242
Fire Prevention Bureau916 River Road, 3rd floor; 201-943-1700 ext. 4115 or 4116

Edgewater permit types

Edgewater posts each application on its Permit Applications page and requires a completed construction permit jacket with every one of them. The trade applications are separate forms: building, electrical, plumbing, fire and mechanical, plus the chimney certification for fuel-fired equipment and a dumpster permit when a container goes on the street.

Residential permits

  • Renovations and additions are filed on the jacket with the building application and any trade forms.
  • Tree removal uses the shade tree application under Ordinance 2024-004, with a sketch drawn from the survey or a landscape plan marking each tree with an X. Filed by the 10th, an application is considered that month; trees on borough property or within 10 feet of the right-of-way also go to the Shade Tree Commission, and you or your contractor should be ready to attend.
  • Condos and co-ops need a certificate of continued occupancy on resale, and on rental as well.

Commercial permits

Every business must apply for a certificate of occupancy before opening and when the business is sold or bought. The business CCO costs $250 per business and includes registration with the Bureau of Fire Prevention, which under the state fire code and Ordinance 1235-2002 applies to every use other than an occupied one- or two-family home. Commercial building permits go through the same jacket and trade applications, and the Building Department also fields property maintenance complaints for commercial buildings.

Not sure this scope needs a permit?

Get a free quote →

What comes before the construction permit

  • Zoning. The Building Department answers zoning questions and receives all Planning Board and Board of Adjustment applications, sends them to board members and professionals, and collects the escrow builders post for the professionals’ reviews. Agendas for both boards are posted in the borough’s agenda center, the borough posts each Board of Adjustment applicant’s documents for public review in a folder named by street address (River Road, Undercliff Avenue and other addresses appear there), and the master plan has its own page.
  • County approvals. Projects needing Bergen County Planning Board approval are filed through the county’s GeoCivix portal, and any dig between the curbs of a county road needs a road opening permit from the county Operations Division (201-336-7678).
  • Soil erosion control. Disturbing more than 5,000 square feet needs a soil erosion and sediment control plan certified by the soil conservation district.

Edgewater permit costs and fees

Edgewater’s construction permit fees are set in the Borough Code (eCode360); the Building Department pages and forms do not list them, so ask ext. 3127 for the figure on a given job. The fees printed on the borough’s own forms are these:

Fees on Edgewater forms
ItemFee
Residential certificate of continued occupancy (Building Department)$100 per unit; $50 re-inspection if it fails
Business certificate of continued occupancy$250 per business
Fire Prevention Bureau sale or rental certificate of compliance$100; $50 after a first failure, $75 for each further failure
Annual registration, non-owner-occupied unit (Ordinance 204-12)$100 a year; owner-occupied two-family homes exempt
Tree removal application$25 per tree from 2.5 to 12.99 inches (street trees from 2.5 to 6 inches also $25); $35 from 13 to 22.99; $45 from 23 to 32.99; $50 at 33 inches and up
Payment in lieu of replacement trees$300 per replacement tree: 1 for trees up to 12.99 inches ($300), 2 up to 22.99 ($600), 3 up to 32.99 ($900), 4 above ($1,200)

Checks for tree permits go to the Borough of Edgewater, and fire certificates may be paid in cash, money order or check to the Edgewater Fire Prevention bureau. Proof that property taxes are paid must be shown before a CCO is issued. On construction permits, the state training fee surcharge is added to the borough fee, and the plan review fee paid when you apply is credited toward the permit and is not refunded.

Rather talk it over?

Call 1-855-478-4290 →

Trade permits and who may pull them

Edgewater keeps a separate application for each trade, but each one must travel with the construction permit jacket. Electrical, plumbing and fire protection work is reviewed and inspected by borough subcode officials, and elevator work by the New Jersey Elevator Inspection Agency.

  • Electrical: filed on the electrical permit application by a state-licensed electrical contractor; inspections on Monday and Wednesday evenings.
  • Plumbing: a state-licensed master plumber files the plumbing application; inspections on Tuesday, Thursday and Friday mornings.
  • Mechanical: heating and cooling equipment uses the mechanical application, with the chimney certification when fuel-fired equipment is replaced.
  • Fire protection: sprinkler and alarm work on the fire application, inspected on Monday, Wednesday and Friday evenings.

Edgewater’s tree form asks the contractor for a New Jersey home improvement number, which is a registration with the Division of Consumer Affairs rather than a license; New Jersey has no general contractor license, new-home builders register with DCA, and owners working on their own homes do not register.

How to apply for an Edgewater building permit

1. Ask about zoning

Call or visit Room 223; the Building Department answers zoning questions and says whether a board application is needed.

2. Clear the boards and county

File any Planning Board or Board of Adjustment application with the department and post the escrow; add county and soil district approvals where they apply.

3. Fill in the jacket

Complete the construction permit jacket; it must accompany every application.

4. Add the trade applications

Attach the building, electrical, plumbing, fire or mechanical forms the work needs, and the chimney certification for fuel-fired equipment.

5. File at Borough Hall

Submit at 55 River Road, 2nd floor, Room 223, between 9 a.m. and 5 p.m. on a weekday.

6. Pay and schedule

Pay the fees once assessed; the department schedules each inspector’s visits.

Review, corrections and what causes delay

The state code gives the construction official 20 business days to approve or deny a complete application, and a permit cannot be issued until zoning and board approvals are in place. Things that hold an Edgewater file back are a missing jacket, which must accompany every application, an unresolved board application or unpaid escrow, and, at closeout, any open permit, because the fire bureau will not issue its certificate of compliance until every permit on the property is closed.

Rather not deal with the Edgewater Borough building department?

Get a free quote →

Inspections and certificates in Edgewater

The Building Department books inspections for all of its inspectors within these windows: building, Monday to Friday 10 a.m. to 4 p.m.; electrical, Monday and Wednesday evenings 4 to 7 p.m.; fire, Monday, Wednesday and Friday 4 to 7 p.m.; plumbing, Tuesday, Thursday and Friday 9 a.m. to noon. Under state rules the request must be made in writing at least 24 hours ahead. A new building gets a certificate of occupancy once the finals pass.

Sales and rentals. Edgewater requires two certificates. The Building Department’s certificate of continued occupancy covers the resale of buildings, condos and co-op units and the rental of condos and co-ops; bring the printed form to Room 223 with $100 per unit. Its inspector visits on Tuesdays and Thursdays between 11 a.m. and 2 p.m. and checks for 10-year sealed smoke alarms within 10 feet of sleeping areas on every level, CO alarms on every level and outside fuel-burning rooms and attached garages, self-closing doors to common hallways, handrails on stairs of three or more risers, and the Hotel and Multiple Dwelling Law items. Inspectors will not remove their shoes.

The Fire Prevention Bureau at 916 River Road issues the separate certificate of compliance under Ordinance 157-10 and N.J.A.C. 5:70-2.3, which must be applied for before a property is sold or rented and before the new owner or tenant moves in. Its inspector does not call ahead, no one may move in before approval, and the certificate issues only after all open building permits are closed and borough taxes and fees are paid.

New Jersey building code in Edgewater

Edgewater enforces the statewide Uniform Construction Code. Since August 17, 2026 that is the 2024 I-codes, 2024 National Standard Plumbing Code and 2023 NEC, with complete applications under the 2021 codes accepted until February 17, 2027. FEMA’s Community Status Book lists Edgewater (community 340029) as participating in the National Flood Insurance Program, with flood maps effective August 28, 2019.

New Jersey has one Uniform Construction Code for every municipality; the town supplies the enforcing agency, the fee ordinance and the zoning approvals. New Jersey rules

Edgewater permit search and official resources

Questions about past permits and certificates on a property start with the Building Department in Room 223; copies of public records are requested from the borough under the Open Public Records Act. Construction appeals go to the Bergen County Construction Board of Appeals.

Want this handled start to finish?

Get a free quote →

Inspections are where schedules slip.

Get a free quote →

Edgewater building permit FAQs

Where do I apply for a building permit in Edgewater?

At the Building Department, Borough Hall, 55 River Road, 2nd floor, Room 223, weekdays 9 a.m. to 5 p.m.

What must go with every Edgewater permit application?

A completed construction permit jacket, plus the building or trade application for the work.

Do I need two certificates to sell a condo in Edgewater?

Yes. The Building Department’s certificate of continued occupancy ($100 per unit) and the Fire Prevention Bureau’s certificate of compliance ($100).

Do I need a permit to cut down a tree on my lot?

Yes, for any non-street tree 6 inches in caliper or more, and for public trees over 2.5 inches; fees run from $25 to $50 per tree, plus replacement or $300 per replacement tree owed.

Where can I see plans for a pending variance next door?

On the borough’s Board of Adjustment applicant documents page, where filings are listed by street address.

When are electrical inspections done?

Monday and Wednesday evenings between 4 and 7 p.m.

What does a new business need?

A business certificate of occupancy before opening, $250 per business, with registration at the Bureau of Fire Prevention.

Who handles zoning questions?

The Building Department, which also takes in Planning Board and Board of Adjustment applications and their escrow.

Simplify Edgewater Borough permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in New Jersey. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Edgewater Borough sooner?

Let Alliance prepare, file, and track your Edgewater Borough permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Edgewater Borough permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.