Milford, New Hampshire Building Permit Guide

Milford’s Department of Building Safety, in the Office of Community Development at 1 Union Square, issues building, electrical and plumbing permits through the PermitEyes portal or on paper; the Fire Department permits fuel-burning equipment, gas piping and tanks.

Authority: Milford Building Safety, Community DevelopmentCode: NH State Building Code (2024 IBC/IRC)Phone: 603-249-0620
Authority
Building Safety1 Union Square · 603-249-0620
Apply
PermitEyes portalOr by mail, email or at the counter
Inspections
24 hours’ notice48 hours for a final C/O inspection
House fee
$50 + $0.14 per sq ftThrough Oct. 31, 2026; $75 + $0.25 from Nov. 1

Building permits in Milford are issued by the Department of Building Safety in the Office of Community Development at 1 Union Square (603-249-0620). Applications can be filed and paid online in PermitEyes, and the Town also takes them by mail, email or at the counter. Through October 31, 2026, residential work costs a $50 application fee plus $0.14 per square foot; from November 1 the Select Board’s new schedule charges $75 plus $0.25. The Building Inspector has 30 days to act on a complete residential application.

What requires a permit in Milford?

The Town’s Building Permit Fact Sheet, dated November 2025, says permits are required for all structures over 200 sq ft and lists these jobs:

Building permit

  • All new construction and additions
  • Remodels and renovations, including basement finishing and kitchen or bath remodels
  • Demolition
  • Sheds, barns and other accessory buildings
  • Porches
  • In-ground and above-ground pools
  • Re-roofing (now required for every residential and commercial roof)
  • Windows and doors
  • Fences over 7 ft tall
  • Signs and commercial tenant changes

Other permits

  • Electrical and plumbing work (Building Safety)
  • Fuel-burning equipment, gas piping and tanks (Fire Department); non-fuel-burning mechanical work moves to Building Safety on November 1, 2026
  • Driveways (Public Works)
  • Water and sewer connections (Water Utilities)
  • Stormwater permits for larger site disturbance

The Town’s Permits and Fees page says windows, doors and roofs all need a building permit, while the fact sheet lists windows and doors only “when structural changes are needed”. An older Required Permits sheet from 2008 set the shed threshold at 120 sq ft. Call 603-249-0620 before replacing windows like for like or building a small shed.

Who issues building permits in Milford?

The Department of Building Safety issues building permits, carries out inspections for building, zoning and site plan compliance, and issues Certificates of Occupancy and Certificates of Compliance. It sits in the Office of Community Development at Town Hall, where the service counter is at the Nashua Street entrance. The Building Inspector reviews the plans and approves or denies each application.

Short on time to read all of this?

Get a free quote →
Milford permit contacts
DetailInformation
OfficeOffice of Community Development, 1 Union Square, Milford, NH 03055 (Nashua St entrance)
Phone603-249-0620
HoursMonday to Friday, 8:00 a.m. to 4:30 p.m.
Building and plumbing inspector office hoursWeekdays, 8:00 to 9:00 a.m. and 3:00 to 3:30 p.m. (since April 1, 2026)
Electrical inspector office hoursTuesday and Thursday mornings
Mechanical and gas permitsMilford Fire Department, 39 School Street, 603-249-0680
Driveway permitsPublic Works, 603-249-0685
Water and sewer permitsWater Utilities, 603-249-0660

Applying through PermitEyes

Building, plumbing, electrical and other Community Development permits are filed in PermitEyes, and the Fire Department uses the same system for mechanical, tank, fire protection system and annual alarm permits. To apply:

  • Register with “New user register here” and add your licences and their expiry dates to your profile, so they fill in future applications.
  • Log in, choose New Application, pick the permit, complete it and submit.
  • Pay with Pay Now by credit card, debit card or e-check, then use the paperclip next to the application to upload plans and documents.
  • Track the permit, print it, message staff and request inspections from the same account.

Paper applications can still be mailed, emailed or brought to the Community Development office, where checks, cash and cards are accepted. The Building Safety resources list also carries a Tenant Change Application, a residential deck worksheet based on the 2024 IRC, climatic and geographic design criteria, and guidance for accessory dwelling units.

Milford building permit fees

Until October 31, 2026, fees come from the Building Safety Permit Fee Schedule the Board of Selectmen adopted effective September 15, 2019, in the revision dated May 1, 2025. The $50 application fee is paid when you apply, and the square-foot fee is collected before the permit is issued. Permit fees are not refundable.

Not sure this scope needs a permit?

Get a free quote →
Milford building and trade permit fees (through October 31, 2026)
ProjectFee
Application fee (building, electrical or plumbing)$50
Residential construction (one- and two-family)$0.14 per sq ft
Non-residential new construction$0.25 per sq ft
Non-residential work in existing structures$0.20 per sq ft
Demolition of an entire structure$50
Residential electrical$25 per new, temporary or sub panel; $25 per panel upgrade
Commercial electrical, new construction$0.05 per sq ft + $25 per service or panel
Generator or solar power source$50
Residential plumbing$50
Commercial plumbing$10 per new fixture, water heaters included
Sign permit$50
Stormwater permit$25 ($50 plan review if required)
Tenant change$50
Permit renewal$25
Re-inspection$50 per inspection
⚠️ New fees from November 1, 2026. The Select Board approved a new Building Safety Permit Fee Schedule on September 28, 2026. From November 1, every building permit carries a $75 administrative fee, plus $0.25 per sq ft for residential construction, additions and renovations or $0.30 per sq ft for commercial work. Roofing, demolition and sign permits pay the administrative fee only; electrical, plumbing and non-fuel-burning mechanical (HVAC) permits are a flat $100 each, and a re-inspection costs $150. A 2,000 sq ft house would pay $75 + $500 = $575 for the building permit.

Rather talk it over?

Call 1-855-478-4290 →

For example, under the current schedule a 2,000 sq ft new house has a $50 application fee and a $280 building fee, $330 in all, before the electrical, plumbing and Fire Department permits. Work started before a permit is issued is charged 200% of the regular fee. When the Town hires an outside consultant to review the code, the permit is credited 20% of the regular fee or the cost of the review, whichever is less.

Electrical, plumbing, mechanical and gas permits in Milford

Electrical and plumbing permits are issued by Building Safety, through PermitEyes or on paper, each with the $50 application fee. The Department’s permit list covers new construction, additions, alterations and renovations, illuminated signs and pools for electrical work, and irrigation systems for plumbing. A generator or solar installation also needs building, mechanical and gas piping permits where they apply.

The Milford Fire Department at 39 School Street (603-249-0680, weekdays 8:00 a.m. to 4:30 p.m.) issues the permits for mechanical work, gas tanks and piping. That includes gas- and propane-fired furnaces, boilers and water heaters, wood and pellet stoves, fireplaces, standby generators, heating oil and propane tanks, sprinkler and fire alarm systems, tents over 400 sq ft and special events. A fire alarm system also needs an annual alarm user permit under Town ordinance. From November 1, 2026, non-fuel-burning mechanical and HVAC permits move to Building Safety at a flat $100, while fuel-burning and gas piping permits stay with the Fire Department.

Rather not deal with the building department?

Get a free quote →

How to get a building permit in Milford

1. Confirm what the job needs

Check the fact sheet list, and call 603-249-0620 for borderline jobs such as small sheds or window replacements.

2. Set up a PermitEyes account

Register, then add your licences so they fill in each application.

3. Apply and pay the $50 application fee

Choose the permit, submit it and pay online, or mail, email or hand in a paper application.

4. Upload the plans

Attach plans and documents with the paperclip icon; the Building Inspector reviews them against state and local rules.

5. Pay the balance and post the permit

The square-foot fee is due before issue, and the approved permit must stay posted at the job site.

6. Inspections and final approval

Book each inspection on the inspection sheet; the Building Inspector then issues a Certificate of Occupancy or Certificate of Compliance.

Inspections in Milford

Once a permit is issued, the owner or applicant gets an inspection sheet listing every inspection the project needs. Book inspections through PermitEyes or by calling the Building Department at 603-249-0620 during business hours, not by calling the inspectors directly.

  • Every inspection needs at least 24 hours’ notice, and a final certificate of occupancy inspection needs 48 hours.
  • Building and plumbing inspections take place between 9:00 a.m. and 3:00 p.m.
  • Electrical inspections take place on Tuesdays and Thursdays, 10:00 a.m. to 12:00 p.m. and 1:00 to 4:00 p.m.
  • The homeowner or contractor must be present for inspections in occupied buildings.
  • A missed inspection, unfinished work or no access means a re-inspection fee: $50 now, $150 from November 1, 2026.

Deficiencies noted on the inspection sheet must be corrected before the Certificate of Occupancy or Certificate of Compliance is issued.

Local Milford details that matter

Water and sewer entrance fees: Milford Water Utilities’ fee pamphlet (July 2026) lists residential entrance fees of $1,330.82 for water and $1,548.69 for sewer per living unit, in effect since May 1, 2023. Connection permits come from Water Utilities (603-249-0660).

Impact fees: the Town has not collected its police or library impact fees since July 2024, when the police station bond was paid off, according to a Planning Board presentation in April 2026.

Stormwater: the Town charges $25 for a stormwater permit and $50 for a stormwater plan review when one is needed; its 2008 permit sheet ties the permit to more than 5,000 sq ft of site disturbance.

Want this handled start to finish?

Get a free quote →

Code editions: the fee schedule’s headings still name the 2018 IRC and IBC and the 2020 electrical code. The State Building Code has used the 2024 IBC and IRC, the 2018 energy code and the 2023 NEC since July 1, 2026, and applications received by December 31, 2026 may follow the 2021 set instead, but not a mix.

New Hampshire building code

Every building in New Hampshire must meet the state building and fire codes (the 2024 codes since July 2026). Only towns that have adopted an enforcement mechanism issue local permits, and any local amendment must be administrative and confirmed by the state. New Hampshire rules

Milford building permit FAQ

Who issues building permits in Milford?

The Department of Building Safety in the Office of Community Development, 1 Union Square (603-249-0620). Fuel-burning equipment and gas piping permits come from the Fire Department.

How much is a building permit in Milford?

Through October 31, 2026, a $50 application fee plus $0.14 per sq ft for residential work, so a 2,000 sq ft house pays $330 before trade permits. From November 1, 2026 it is a $75 administrative fee plus $0.25 per sq ft, or $575 for the same house.

Do I need a permit for a new roof in Milford?

Yes. The Town now requires roof permits for all residential and commercial projects.

Do I need a permit for a shed or fence?

The current fact sheet requires permits for structures over 200 sq ft and for fences over 7 ft tall. Ask the department about smaller sheds, since an older Town sheet used 120 sq ft.

How long does it take to get a permit?

The Building Inspector has 30 days for a complete residential application and 60 days for a complete commercial one.

How do I schedule an inspection?

Through PermitEyes or by calling 603-249-0620, at least 24 hours ahead (48 hours for a final certificate of occupancy inspection).

Inspections are where schedules slip.

Get a free quote →

Official Milford permitting resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Simplify Milford permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in New Hampshire. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Milford sooner?

Let Alliance prepare, file, and track your Milford permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Milford permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.