In Exeter, the town’s Building Department at 10 Front Street issues building, electrical, plumbing and gas/mechanical permits, and applicants fill in the forms with its staff in person. A residential building permit costs a $50 application fee plus $5 per $1,000 of estimated construction cost, and the building and electrical inspectors need 24 hours’ notice for each inspection.
What requires a permit in Exeter?
Exeter requires a building permit before any residential or commercial construction project starts: new buildings, additions, remodels, renovations and demolition. Electrical, plumbing and gas/mechanical work each need a separate trade permit, and a new or replaced electric meter also needs a Permit to Energize from the Building Department before the utility turns the power on.
Building Department permits
- New homes, additions, remodels and renovations
- Commercial and industrial construction
- Demolition and replacement of a manufactured home (“remobile”)
- Electrical, plumbing and mechanical/gas work
- Rooftop and ground-mounted solar (building and electrical permits)
- Signs, sidewalk signs and displays
- Home occupation and other use permits
Approvals needed first
- Driveway permit from Public Works, before the building permit is issued
- Septic design review by the Building Inspector, then NHDES Approval for Construction
- Water and sewer service applications and fees, before the building permit
- Planning Board, Zoning Board or Historic District Commission decisions where the project needs them
The application asks whether the lot is in a Special Flood Area, the Wetland Conservation Overlay District, the Exeter Shoreland Protection District or the Historic District. If the answer is yes or unsure, the town asks you to book an appointment with the Building Inspector or the Natural Resource Planner before applying.
Who issues building permits in Exeter?
The Exeter Building Department handles building inspection, code enforcement and zoning administration for the whole town; Rockingham County does not issue building permits. Douglas Eastman is the Building Inspector and Code Enforcement Officer. The department also takes questions and applications for the Zoning Board of Adjustment, which meets monthly, and keeps the board’s past case files.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Exeter Town Office, 10 Front Street, Exeter, NH 03833 |
| Phone | 603-773-6112 (Building Inspector direct line 603-773-6113) |
| Hours (since July 6, 2026) | Monday, Wednesday and Thursday 8:00 a.m. to 4:30 p.m.; Tuesday 8:00 a.m. to 7:00 p.m.; Friday 8:00 a.m. to 12:30 p.m. |
| Filing | In person at the Building Department |
| Fire code | Exeter Fire Department, 20 Court Street, business line 603-773-6131 |
The Select Board approved the longer Tuesday and shorter Friday hours for the Building Department from July 6, 2026.
Exeter permit applications and forms
Exeter takes permit applications in person. Because construction projects vary, the department requires applicants to meet its staff when they pick up and complete building, electrical or plumbing/gas applications. Electrical, plumbing and gas contractors must show a valid trade licence when they apply. The forms are also posted on the town’s Building Permit Applications page:
- Building Permit Application: owner and contractor details, tax map parcel and zone, a plot plan with setbacks for any work outside the existing footprint, plans, a description of the work and the estimated cost of labor and materials, certified under penalty of perjury. Page 2 is completed for new construction.
- Electrical, Plumbing and Mechanical Permit Applications: one per trade, filed by the licensed contractor.
- RCCD Request for Review Application: test pit review through the Rockingham County Conservation District.
- Use Permit for a home occupation, heliport or other use, and the Sign and Sidewalk Sign and Display permit applications.
- Solar Permitting Checklist (revised May 21, 2025) for rooftop and ground-mounted PV systems.
- Notice to Homeowner’s and Condo Association Owners: association covenants may require their own review of your plans, and checking that is up to you before you apply.
Exeter building permit fees
Exeter’s fees are set by the Select Board. The Building Department’s fee schedule (revised January 1, 2024) and the town-wide fee schedule (January 2026, updated April 2026) list the same building permit rates. The permit fee is worked out on the estimated cost of materials and labor.
Not sure this scope needs a permit?
Get a free quote →| Project | Fee |
|---|---|
| Residential building permit | $50 application fee + $5 per $1,000 of construction value |
| Commercial building permit | $150 application fee + $10 per $1,000 of construction value |
| Construction value of $1,500 or less | Application fee only |
| Electrical, plumbing or mechanical/gas permit | $50 application fee, + $5 (residential) or $10 (commercial) per $1,000 when the trade cost is not included in the building permit |
| Demolition, residential | $25 flat |
| Demolition, commercial | $25 + $10 per $1,000 of demolition cost (over $1,500) |
| Replacing a manufactured home (remobile) | $50 flat, demolition and installation included |
| Increase in cost on an issued permit | $5 (residential) or $10 (commercial) per $1,000 of the increase |
| Septic design review | $50 |
| Test pit review through RCCD | $350 per lot |
| Driveway permit (Public Works) | $10 |
| Sign permit | $25 per sign |
| Home occupation permit | $25 |
When the electrical, plumbing or gas cost is included in the building permit estimate, the electrician or plumber still files a separate permit but pays only the $50 application fee. Fees are waived for repairs after fire damage and for work on municipal buildings.
For example, a residential addition estimated at $120,000 for labor and materials costs $50 plus $600, or $650, for the building permit.
Impact fees are paid at the Building Office for each new dwelling unit (effective March 29, 2021):
| Dwelling type | School impact fee | Recreation impact fee |
|---|---|---|
| Single detached | $5,690 | $1,004 |
| Townhouse (single attached) | $1,947 | $624 |
| Duplex / 2-unit structure | $3,296 | $730 |
| Multi-family, 3 or more units | $1,675 | $580 |
| Manufactured housing | $3,997 | $697 |
Rather talk it over?
Call 1-855-478-4290 →Town water and sewer: each connection has a $375 entrance fee, plus a system development charge of $3.74 per gallon for water and $1.81 per gallon for sewer. Homes are counted at 120 gallons per day per bedroom, so the town’s example of a 4-bedroom house has system development charges of $1,795.20 for water and $868.80 for sewer, on top of the two entrance fees. Water and sewer service applications must be completed, and their fees paid, before the building permit is issued.
Electrical, plumbing, gas and fire permits in Exeter
The Building Department issues electrical, plumbing and mechanical/gas permits on separate applications, and the contractor presents a current licence when filing. Exeter has its own electrical inspector, and electrical inspections need 24 hours’ notice like building inspections. Where electrical work installs or replaces a meter, the department issues a Permit to Energize before the utility connects power.
For solar PV, both residential and commercial systems need an electrical permit and a building permit, a site plan, an electrical diagram, equipment specification sheets and an engineer’s structural report, and the work must be done by a licensed electrician. The town’s checklist gives design criteria of 120 mph wind speed, 50 psf ground snow load and 48 inches frost depth, and arrays must meet zoning setbacks.
The Exeter Fire Department enforces the State Fire Code. Its permits on the town fee schedule include fire alarm and fire suppression system installation or modification ($50 each, plus acceptance testing) and oil burner installation ($50). Fire plan review costs $150 for a small project of up to one hour in house; larger projects are reviewed by a third-party fire protection engineer at a fee that engineer sets.
What to bring to the Building Department
Every building permit
- Completed Building Permit Application with zone and tax map parcel
- Plot plan with setback distances for work outside the existing footprint
- Plans and specifications
- Estimated cost of labor and materials, with electrical, plumbing and gas costs listed if they are included
- Contractor details; installer licence number for a manufactured home
New construction adds
- Occupancy group, square footage, foundation, rooms and bedrooms
- Water and sewer details, or the NHDES septic approval number
- Driveway permit
- Proof that impact fees are paid
- Planning Board, Zoning Board, Historic District Commission and Conservation Commission case numbers and approval dates, and whether site plan conditions are met
Rather not deal with the building department?
Get a free quote →How to get a building permit in Exeter
Find the zone and tax map parcel, and whether the lot is in a flood area, the Wetland Conservation Overlay, the Shoreland Protection District or the Historic District. If any answer is yes or unsure, book time with the Building Inspector or the Natural Resource Planner.
Driveway permit from Public Works, septic design review and NHDES Approval for Construction, water and sewer applications, and any Planning Board, Zoning Board or Historic District Commission decision.
Draw a plot plan with setbacks and gather the plans, specifications and the full estimated cost of labor and materials.
Meet Building Department staff at 10 Front Street to complete the building application; trade contractors file their own permits and show their licences.
Pay the application and permit fees and, for a new dwelling, the school and recreation impact fees at the Building Office.
Give 24 hours’ notice for each inspection and finish the job within the permit’s one-year life, or ask the Building Inspector to renew it.
Exeter building inspections
The homeowner or contractor schedules every required inspection by calling 603-773-6112, and Exeter’s building and electrical inspectors need 24 hours’ notice. The town’s solar checklist gives inspection hours of 9:00 a.m. to 3:30 p.m. By signing the application you agree to give the Building Inspector that notice before rough wiring, rough plumbing or a chimney is covered with wall material, and to tell the inspector when the job is finished.
A building permit is valid for one year from the date it is issued; the town’s solar checklist adds that a permit lapses if work has not started within 180 days. The Building Inspector may renew it for one more year at no charge if the cost has not grown; work still unfinished after the renewal needs a new application for the remaining portion.
Local Exeter rules that affect a permit
Septic systems: the Building Inspector reviews septic designs ($50) before they go to the NHDES Subsurface Systems Bureau, and NHDES Approval for Construction is needed before the building permit is issued. Test pit review goes through the Rockingham County Conservation District ($350 per lot).
Want this handled start to finish?
Get a free quote →Historic buildings: work in the Historic District goes to the Historic District Commission, which charges no application or plan review fee, and demolitions may be reviewed by the Heritage Commission.
Associations: if your home is in a homeowners’ or condominium association, check its covenants for a plan review of its own before you apply.
New Hampshire building code
Every building in New Hampshire must meet the state building and fire codes (the 2024 codes since July 2026). Only towns that have adopted an enforcement mechanism issue local permits, and any local amendment must be administrative and confirmed by the state. New Hampshire rules
Exeter building permit FAQ
Who issues building permits in Exeter?
The Town of Exeter Building Department at 10 Front Street (603-773-6112) issues building, electrical, plumbing and mechanical permits for the whole town.
Can I apply for an Exeter building permit online?
No. The department asks applicants to meet its staff in person to obtain and complete building, electrical and plumbing/gas applications, although the blank forms can be downloaded from the town website.
How much is a building permit in Exeter?
For residential work, $50 plus $5 per $1,000 of the estimated cost of labor and materials; commercial work is $150 plus $10 per $1,000. Jobs valued at $1,500 or less pay only the application fee.
What impact fees apply to a new house in Exeter?
A new single detached house pays a $5,690 school impact fee and a $1,004 recreation impact fee, paid at the Building Office.
How much notice do inspections need?
24 hours for both the building and the electrical inspector, and booking them is the owner’s or contractor’s job.
Which building code does Exeter enforce?
The New Hampshire State Building Code: since July 1, 2026 the 2024 International Building and Residential Codes with the 2018 energy code and the 2023 National Electrical Code, and through December 31, 2026 an applicant may use the previous 2021 set instead (not a mix). The Building Department’s web page still mentions the 2015 codes.
Inspections are where schedules slip.
Get a free quote →Do I need anything from NHDES for a septic system?
Yes. After the Building Inspector reviews the design, the NHDES Subsurface Systems Bureau must issue Approval for Construction before Exeter issues the building permit.
Official Exeter permit resources
- NH Department of Environmental Services
- RSA 155-A — New Hampshire State Building Code
- Exeter building permit applications and forms
- Exeter Building Department
- Exeter Building Department contacts and hours
- Exeter Building Permit Application (PDF)
- Exeter Building Department Fee Schedule, revised January 1, 2024 (PDF)
- Town of Exeter Fee Schedule, January 2026, updated April 2026 (PDF)
- Exeter Solar PV Permitting Checklist, May 2025 (PDF)
- Exeter Fire Department Fire Inspection Program
Simplify Exeter permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in New Hampshire. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Exeter sooner?
Let Alliance prepare, file, and track your Exeter permits while your crew stays on the job.
More New Hampshire permitting guides
This guide is provided by Alliance Permitting for general information about Exeter permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.