Texas County’s government posts no building permit and no planning or zoning office; its published licences are limited to items such as liquor, auctioneer and merchant licences, and road funds flow through its 17 townships. Septic systems are permitted by the Texas County Health Department, 950 N. Highway 63, Suite 500, Houston (417-967-4131). Houston, Licking and Cabool each require a city building permit.
Texas County building department: who handles permitting
The County Commission governs this third-class county and contracts road and bridge money to the townships. The state emergency agency lists the county emergency coordinator at 10175 Highway 32, Plato (417-967-6488). It names no county floodplain administrator, and FEMA’s status book does not list Texas County at all.
Short on time to read all of this?
Get a free quote →| Place | Who permits building work |
|---|---|
| Licking (2,958) | City of Licking: a permit is needed to erect, move, add to or structurally alter any building, the site is checked against the zoning ordinance, and the fee is $5; the state lists the city floodplain administrator at 125 S. Main St. (573-674-2521) |
| Houston (2,281) | City of Houston, 601 S. Grand Ave. (417-967-3348): the city administrator reviews plans and issues permits; contractors need a city business licence |
| Cabool (2,089) | City code adopts the 1993 BOCA National Building Code and 1993 National Electrical Code and sets a valuation-based fee; the state lists the city floodplain administrator at 618 Main St. (417-962-3136) |
| Summersville (415 in Texas County), Raymondville (371), Plato (91) | The published sources do not say; ask the city or village |
| Mountain Grove (168 in Texas; mostly Wright County) | City of Mountain Grove building inspector, whose code names the 2021 International codes; permits last 180 days |
| Unincorporated county | No county building permit; septic permits from the Texas County Health Department |
City permits and fees in Texas County
Houston: the city code requires a permit for any building or permanent structure, including garages, carports, sheds, barns, outbuildings, gazebos and pergolas. Its August 2026 application asks homeowners for one plan set or PDF (site plan, foundation, floor plan, wall section and elevations); commercial plans must be sealed by a Missouri architect or engineer and include structural, plumbing, electrical and mechanical sheets. Fees come from the city’s fee schedule and the form also lists sewer connection, sewer access, water meter and driveway charges and an excavation deposit. The code says a permit is valid for 180 days, while the August 2026 form says one year, lapsing if work does not start within six months or stops for six months; demolition permits last three months.
Not sure this scope needs a permit?
Get a free quote →Cabool: the permit fee is $0.25 per $100 of estimated cost up to $10,000, $0.15 per $100 on the part from $10,000 to $25,000, and $0.10 per $100 above $25,000. A $100,000 project therefore pays $25 plus $22.50 plus $75, or $122.50. Starting without a permit adds an administrative fee of $20, $30 or $40 depending on the cost.
Licking: a flat $5 building permit fee; the city’s code also contains a floodplain management chapter.
Septic rules in Texas County
The state lists the Health Department as an ordinance authority: Texas County has its own onsite sewage ordinance, which may add local requirements to the state minimum. The Health Department’s answers to common questions:
- Every onsite system needs a permit to construct except for a single-family home on 3 acres or more. RSMo 701.031 sets the conditions for that exemption: all parts of the system more than 10 feet from adjoining lot lines, and no effluent entering a neighbour’s land, polluting water or causing a nuisance.
- Extra homes on one tract stay exempt only with 10 acres for each home and systems at least 360 feet apart.
- A soils morphology report comes first; if a conventional tank and laterals will not work, an engineer designs an alternative system for an advanced installer, and in a few cases a lagoon may be allowed.
- Only installers registered with the state may install systems.
- Once the state has issued a notice of violation, a permit is needed to fix the system whatever the acreage.
- The office does not inspect systems for property sales; it refers buyers to registered third-party inspectors.
Rather talk it over?
Call 1-855-478-4290 →The state permit application the Health Department posts still shows the $90 state fee, which the state suspended from August 28, 2026 until it sets new fees.
Floodplain: Cabool, Houston and Licking take part in the National Flood Insurance Program; Texas County, Plato, Raymondville and Summersville are not listed.
Starting a project in Texas County
Check whether the site is inside a city or village; rural land has no county building permit.
Order a soils morphology report, then apply to the Texas County Health Department with a state-registered installer.
Make sure your contractor holds a Houston business licence, then file the city permit application with plans and pay the fees.
Apply to the city before building and pay its permit fee.
Missouri building code
Missouri has no mandatory statewide building code for private construction: a county, fire protection district or municipality may adopt one (usually by reference under RSMo 67.280), and in parts of the state none has. Building codes in Missouri
Rather not deal with the Texas County building department?
Get a free quote →Texas County permit FAQs
Does Texas County, Missouri require a building permit?
The county posts no building permit or zoning office. Septic systems need a Health Department permit unless exempt, and Houston, Licking and Cabool require city permits.
Who issues septic permits in Texas County?
The Texas County Health Department, 950 N. Highway 63, Suite 500, Houston (417-967-4131), which works under a county ordinance.
Can I add a second house on my acreage without a septic permit?
Only with at least 10 acres for each home and every part of the systems at least 360 feet apart; otherwise a permit is needed.
How much is a building permit in Cabool?
$0.25 per $100 of cost up to $10,000, $0.15 per $100 from $10,000 to $25,000 and $0.10 per $100 above that, so $122.50 for a $100,000 project.
Do contractors need a licence in Houston?
Yes. Houston issues permits only to contractors with a valid city business licence.
Want this handled start to finish?
Get a free quote →Texas County permit search and official resources
- Texas County Commission
- Texas County Health Department sewage disposal and septic permits
- Missouri DHSS septic (OWTS) permit authority by county
- SEMA floodplain and emergency contacts, Texas County
- FEMA Community Status Book: Missouri
- City of Houston permit application (August 2026)
- City of Houston code of ordinances
- City of Licking code of ordinances
- City of Cabool code of ordinances
Simplify Texas County permitting with Alliance Permitting
Inspections are where schedules slip.
Get a free quote →Alliance Permitting is a permit documentation and submission company in Missouri. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Texas County sooner?
Let Alliance prepare, file, and track your Texas County permits while your crew stays on the job.
More Missouri permitting guides
Stone County
Read guide →Marion County
Read guide →Stoddard County
Read guide →Town and Country Building Permit Guide
Read guide →Troy Building Permit Guide
Read guide →Union Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Texas County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.