Saline County, Missouri Building Permit Guide

To get a building permit in Saline County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Saline County runs no planning, zoning or building office, so building permits come from Marshall and the other towns that issue them; on county land the main approval is a state septic permit.

Authority: Saline County CommissionCounty code: No building or zoning officePhone: (660) 886-7777
Marshall permits
Inspection Dept., 660-886-2653
Septic permits
Missouri DHSS
County floodplain contact
Emergency Management, 660-815-7864
County roads
411 miles in the County Common area

Saline County government has no planning, zoning or building department: the County Commission oversees county roads, bridges and county buildings, but it issues no building permits for private construction. Inside Marshall, the City Inspection Department (660-886-2653) issues building and trade permits under the 2021 International Codes, and Slater, Sweet Springs and Arrow Rock handle approvals in town. On unincorporated land, septic systems are permitted directly by the Missouri Department of Health and Senior Services, and the county’s floodplain administrator is the contact for building in a mapped flood hazard area.

Saline County building department: who handles permitting

The Saline County Commission meets in regular session every other Wednesday from 9 a.m. at the courthouse, 19 E. Arrow St., Room 101, Marshall (660-886-7777). The county’s offices are the elected row offices plus Building and Grounds, Emergency Management, Human Resources and Road and Bridge; none of them reviews plans or inspects private buildings. Town populations below are Census Bureau Vintage 2025 estimates for the part in Saline County.

Short on time to read all of this?

Get a free quote →
Who issues building permits in Saline County
PlaceWho permits building work
Marshall (13,766)City Inspection Department, City Office Building, 214 N. Lafayette Ave.; 660-886-2653. 2021 International Codes and 2020 NEC; plan review and inspections through the Institute for Building Technology and Safety; online Citizen Portal
Slater (1,824)The City’s website asks applicants to call City Hall for building permit forms; (660) 529-2271
Sweet Springs (1,323)City Hall, 324 S. Miller St.; (660) 335-4564. The City’s building permit application, filed with the City Clerk, goes to Planning and Zoning and the Mayor for approval; its application fee ($75 commercial, $50 residential, $25 for accessory buildings, additions, fences, decks and similar work) is not refundable
Blackburn (214; 11 in Lafayette County)The published sources do not say; ask the city
Malta Bend (190), Gilliam (182), Nelson (149), Miami (143)The published sources do not say; ask the town
Emma (117; 84 in Lafayette County)Emma issues building permits through its zoning code: the Enforcement Officer must approve each application, and a scaled plot plan in duplicate showing the lot and the building goes with it (Section 405.240). City office, 101 S. Elm; (660) 463-2150
Mount Leonard (65), Grand Pass (50)The published sources do not say; ask the town or village
Arrow Rock (57)Town Board of Trustees. The Board of Architectural Review must approve any change to the look of a house, outbuilding or fence, even a new exterior color, before the Board of Trustees approves it; any hired contractor needs a $25 town licence. Town Clerk, 660-837-3608
Unincorporated Saline CountyNo county building permit or zoning; septic permits from DHSS; floodplain administrator for mapped flood areas

Not sure this scope needs a permit?

Get a free quote →

What applies on unincorporated land

Still required

  • Septic permit from the Missouri Department of Health and Senior Services before an onsite system is built or modified
  • Flood hazard areas: the county takes part in the National Flood Insurance Program, so check with the county floodplain administrator before building or filling in a mapped flood zone
  • County roads: road concerns and dust control go to Road and Bridge, or to the special road district that maintains the road

No county office

  • County building permits or construction inspections
  • County zoning or rezoning
  • County trade permits for electrical, plumbing or mechanical work

Septic, flood and road details in Saline County

Septic systems: the state’s county-by-county list shows no local wastewater authority for Saline County, so a new or repaired onsite system is permitted by the Missouri Department of Health and Senior Services in Jefferson City. The process starts with an application number requested on the department’s online form (phone (573) 751-6095 ext. 5). Because section 701.046 RSMo was changed to drop its $90 permit fee, DHSS has put its onsite application fees on hold from August 28, 2026 until it sets new fees.

Rather talk it over?

Call 1-855-478-4290 →

Flood rules: FEMA lists Saline County as a participating community, with flood maps dated January 16, 2013. The state’s floodplain contact list names the county Emergency Management Director as the county’s floodplain administrator (153 S. Odell, Marshall; 660-815-7864). Arrow Rock, Emma, Marshall, Slater and Sweet Springs also take part, each with its own floodplain administrator; Blackburn, Grand Pass, Malta Bend, Miami and Nelson are in FEMA’s section of communities not in the program.

Roads: the county Road and Bridge crew maintains 411 miles of road in the County Common area; other roads belong to special road districts. Road and Bridge takes requests by phone (660-886-7844) and through the county’s online road concern form, and it publishes a dust control application.

Arrow Rock: the historic town’s Board of Architectural Review meets on the fourth Monday of the month and publishes design guidelines; the Town Board meets on the first Monday.

Steps for building in Saline County

1. Check whether the lot is in a town

Inside Marshall, Slater, Sweet Springs, Emma or Arrow Rock, that town’s rules apply; outside, there is no county building permit.

2. In Marshall, use the Citizen Portal

Apply to the City Inspection Department online or at 214 N. Lafayette Ave.

3. On rural land, request the septic application number

DHSS issues the permit before the system is installed.

4. Check the flood map

If the site is in a mapped flood hazard area, contact the county floodplain administrator before building or filling.

Rather not deal with the Saline County building department?

Get a free quote →

Missouri building code

Missouri has no mandatory statewide building code for private construction: a county, fire protection district or municipality may adopt one (usually by reference under RSMo 67.280), and in parts of the state none has. Building codes in Missouri

Saline County permit FAQs

Does Saline County issue building permits?

No. The county has no planning, zoning or building office; towns such as Marshall, Slater and Sweet Springs issue their own permits.

Who issues building permits in Marshall?

The City Inspection Department, City Office Building, 214 N. Lafayette Ave. (660-886-2653), which enforces the 2021 International Codes.

Who issues septic permits in rural Saline County?

The Missouri Department of Health and Senior Services; call (573) 751-6095 ext. 5 or request an application number online.

Who handles flood rules in rural Saline County?

Saline County takes part in the National Flood Insurance Program; before building in a mapped flood hazard area, contact the county floodplain administrator, the Emergency Management Director (660-815-7864).

Can I repaint my house in Arrow Rock without approval?

No. Any change to a building’s appearance, including exterior colors, goes to the Board of Architectural Review and then the Board of Trustees.

Want this handled start to finish?

Get a free quote →

Saline County permit search and official resources

Inspections are where schedules slip.

Get a free quote →

Simplify Saline County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Missouri. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Saline County sooner?

Let Alliance prepare, file, and track your Saline County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Saline County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.