For land outside the cities, Platte County Planning & Zoning (415 Third Street, Room 016, Platte City; 816-858-3338) issues building permits, reviews plans against the 2018 International Codes and 2017 National Electrical Code as amended, and inspects the work. Applications go through the county’s online portal, and a complete application is acted on within five working days. A new house of more than 1,400 sq ft costs $300 for the first 500 sq ft plus $0.35 for each additional square foot. Inside Kansas City, Parkville, Platte City, Riverside and the other towns, the town permits instead.
Platte County building department: who handles permitting
Platte County Planning & Zoning, led by Director Daniel Erickson, combines the county’s zoning office, its building department and its land disturbance program in Room 016 of the Administration Building, 415 Third Street, Platte City (816-858-3338, permits@co.platte.mo.us), open Monday to Friday 8:00 a.m. to 5:00 p.m. The building department issues permits for new buildings, accessory structures, additions and renovations, decks, pools, solar panels, electrical and generator work, mechanical change-outs and demolition, checks plans against the adopted codes and inspects each stage.
The county permits only unincorporated land. Each of the 19 incorporated places in the county decides its own permits; populations below are Census Bureau Vintage 2025 estimates.
Short on time to read all of this?
Get a free quote →| Place | Who permits building work |
|---|---|
| Kansas City (56,064 in Platte County) | City of Kansas City, City Planning and Development Department, through the Compass KC online system |
| Parkville (9,093) | Community Development Department, second floor of City Hall, 8880 Clark Avenue; permits and inspections 816-741-9313, inspections@parkvillemo.gov |
| Platte City (4,911) | City building department (Building Inspector/Codes Enforcement Officer) under the 2018 International Codes and 2017 NEC; City Hall, 224 Marshall Road, 816-858-3617 |
| Riverside (4,581) | Building and Codes Division under the 2018 International Codes; fees in Chapter 400 of the city code. City Hall, 2950 NW Vivion Road; inspections 816-741-3993 |
| Weatherby Lake (2,139) | City of Weatherby Lake: the Zoning Enforcement Officer acts as building official under the 2015 International Residential Code (keeping the 2009 energy rules) and the 2008 NEC; an erosion control/building permit is needed when more than 150 sq ft of natural vegetation is disturbed or any seawall work is done. Ask City Hall for fees |
| Weston (1,855) | City of Weston: the September 2026 application lists the 2012 International Codes and 2011 NEC; at least 7 business days’ review for homes and 30 for commercial work. Superintendent of Public Works 816-640-5477 |
| Lake Waukomis (941) | City of Lake Waukomis: building permits from the city’s Enforcement Officer for new buildings, additions, remodels, decks, retaining walls, pools, docks, fences and driveways, under the 2021 IBC and IRC, 2021 Uniform Plumbing Code and 2020 NEC (Ord. 589, Oct. 9, 2024); fees set by a schedule of the Board of Aldermen |
| Ferrelview (656) | Village of Ferrelview: the Building Commissioner reviews applications; $20 per $1,000 of construction value. 205 NW Heady Ave, 816-464-5010 |
| Edgerton (607) | City of Edgerton: the city code adopts the 2012 International Codes, the 2009 IECC and the 2011 NEC (Ord. 450, 2015); ask City Hall, 400 Frank St., 816-790-3484 |
| Dearborn (518) | City Hall supplies permit forms (816-992-3576); the city code charges $300 for the first 500 sq ft plus $0.35 per additional sq ft for a house of 1,401 sq ft or more |
| Camden Point (474) | The published sources do not say; ask City Hall |
| Platte Woods (395) | City Hall, 6750 NW Tower Dr. (816-741-6688): new house $100, remodel $50, final inspection $35 |
| Tracy (345) | City of Tracy: applications go to the Building Inspector at least 7 days before the permit; City Hall 816-858-5555, Tuesday to Thursday 10 a.m. to 3 p.m. |
| Northmoor (294) | City of Northmoor: building, remodeling, electrical, plumbing, HVAC, fence, driveway, solar and demolition permits, fees effective September 8, 2026; 816-741-6071 |
| Farley (259) | The published sources do not say; ask the village |
| Houston Lake (227) | Board of Aldermen issues permits: $0.25 per sq ft for a new house, $0.15 for a room addition; applications due 10 days before the council meeting |
| Ridgely (103) | The published sources do not say; ask the village |
| Iatan (44) | The published sources do not say; ask the village |
| Smithville (1 resident in Platte County) | City of Smithville Development Department, 816-532-3897 |
| Unincorporated Platte County | Platte County Planning & Zoning, Building Department |
Not sure this scope needs a permit?
Get a free quote →Codes and what needs a county permit
Anyone who builds, enlarges, alters, repairs, moves, demolishes or changes the occupancy of a building, or installs or changes electrical, gas, mechanical or plumbing systems covered by the code, needs a county permit first. Ordinary repairs do not.
Codes adopted (as amended)
- 2018 International Building Code
- 2018 International Residential Code
- 2018 International Plumbing, Mechanical and Fuel Gas Codes
- 2018 International Energy Conservation Code
- 2018 International Swimming Pool and Spa Code
- 2017 National Electrical Code
- Platte County Zoning Order (1990) and Subdivision Regulations (1992), as amended
Design criteria
- Wind load 115 mph
- Snow load 20 psf
- Termite infestation probability: moderate to heavy
- Retaining walls over 4 ft, walls with a slope behind them, or walls holding up a parking lot, driveway, pool or structure need a permit and a third-party inspection letter
- A mechanical change-out needs a permit only when switching between gas and electric
Platte County building permit fees
| Permit | Fee |
|---|---|
| One- or two-family dwelling up to 1,400 sq ft | $200 for the first 500 sq ft, plus $0.25 per additional sq ft |
| One- or two-family dwelling of 1,401 sq ft and up | $300 for the first 500 sq ft, plus $0.35 per additional sq ft |
| Renovation or residential addition | $100 for the first 500 sq ft, plus $0.05 per additional sq ft |
| Barn or garage | $50 for the first 500 sq ft, plus $0.10 per additional sq ft |
| Shed | $50 for the first 500 sq ft, plus $0.05 per additional sq ft |
| Deck | $50 |
| Swimming pool | $75 |
| Electrical or mechanical permit | $50 |
| Solar panels | $50 |
| Sign | $75 |
| Retaining wall | $25 |
| Demolition | $25 residential, $100 commercial |
| Commercial building | $500 for the first $5,000 of estimated cost, plus $25 per additional $5,000 |
| Re-inspection | $60 per trip after two for the same inspection |
Rather talk it over?
Call 1-855-478-4290 →For example, a 2,000 sq ft house is $300 for the first 500 sq ft plus $525 for the other 1,500 sq ft at $0.35, a total of $825. The two dwelling bands do not join up, so a house just over 1,400 sq ft costs noticeably more than one just under. For commercial work the county’s permit packet asks for a $500 deposit when plans are submitted, to cover review by the county’s consulting engineering firm; any excess is billed and must be paid before the rough-in inspection. Work started without a permit pays double.
What to upload for a new house
Plans and reports
- Drawings sealed by an engineer licensed in Missouri, with footing, wall, floor and roof plans, braced wall details and a basic electrical layout
- Sealed truss drawings where trusses are used
- Site plan with erosion and sediment control, elevations, easements and floodplain, prepared by a licensed Missouri surveyor
- RES-check or HERS rating under the 2018 IECC
- Signed Plan Certification Statement
Other approvals
- Valuation and finished and unfinished square footage of each floor
- Septic permit from the Platte County Health Department, or a sewer permit from the Platte County Regional Sewer District (816-858-2052) or Timber Creek Sewer Company
- Water district letter confirming service
- Entrance permit from the road district or MoDOT
- Notarized building permit affidavit, due by the final inspection
Commercial projects add a use and occupancy statement, a site plan approved by the Platte County Planning Commission, sealed floor plans and, where it applies, approval from the Southern Platte County Fire Protection District, which also signs off solar installations inside its district.
Rather not deal with the Platte County building department?
Get a free quote →How to apply in unincorporated Platte County
If the lot is inside one of the 19 towns, apply to that town instead of the county.
Get the septic or sewer permit, the water district letter and the entrance permit before applying.
Create an account on the county website, choose My Profile, then Applications, then Building Permit Application, and upload every required document; if there is no address yet, search by parcel ID or owner and one is assigned during review.
The county emails a payment request once the review is done and issues the permit after payment; no construction is allowed before.
Use the portal, email inspection@co.platte.mo.us or call 816-858-3338 at least 24 hours ahead.
Upload the road district approval, the sewer district approval or Health Department final, and the notarized affidavit; the certificate of occupancy follows the final inspection.
Permits for new homes and commercial buildings expire two years after issue, with one extension of up to six months; other permits, such as additions, remodels, pools, accessory buildings and solar, expire sooner. Work must start within 180 days and may not stop for more than 180 days.
County inspections
Inspectors run an AM route between 9:00 a.m. and 12:00 p.m. and a PM route between 2:00 and 4:30 p.m.; no exact time is given. The approved plans must be on site for every inspection. The stages are footing or pier, pool bonding, prebackfill (drain tile and waterproofing), ground rough once the ground plumbing and erosion control are in place, an all-trades rough-in after framing, fire blocking, electrical, plumbing and mechanical work, a gas pressure test at 20 psi minimum, and the final before anyone moves in. A suspended slab must be inspected by a Missouri-licensed engineer, whose report goes to the county.
Septic and floodplain in Platte County
Septic systems: before an on-site wastewater system is installed in unincorporated Platte County the owner needs a permit from the Platte County Health Department, which also issues permit exemptions and inspects new and repaired systems. Apply online, or mail the signed application, soil morphology report, site layout and fee to 7925 NW 110th Street, Kansas City, MO 64153 (816-858-2412).
Floodplain: FEMA’s Community Status Book lists Platte County in the National Flood Insurance Program and in the Community Rating System at class 6, worth a 20% flood insurance discount. Farley has adopted the county’s flood map panel. Camden Point, Ridgely and Weatherby Lake are in FEMA’s list of communities not participating.
Want this handled start to finish?
Get a free quote →Missouri building code
Missouri has no mandatory statewide building code for private construction: a county, fire protection district or municipality may adopt one (usually by reference under RSMo 67.280), and in parts of the state none has. Building codes in Missouri
Platte County permit FAQs
How much is a building permit for a new house in Platte County?
For a house of 1,401 sq ft or more, $300 for the first 500 sq ft plus $0.35 per additional square foot; a 2,000 sq ft house is $825. Smaller houses start at $200 plus $0.25 per square foot over 500.
Which building code does Platte County use?
The 2018 International Building, Residential, Plumbing, Mechanical, Fuel Gas, Energy Conservation and Swimming Pool and Spa Codes and the 2017 National Electrical Code, each as amended by the county.
How long does a county permit take?
The county acts on an application within five working days after it has all the required information.
How do I schedule a county inspection?
Through the online portal, by email to inspection@co.platte.mo.us or by phone at 816-858-3338, at least 24 hours ahead.
Does the county issue permits in Parkville or Platte City?
No. Each city issues its own permits: Parkville’s Community Development Department (816-741-9313) and Platte City’s building department (816-858-3617).
Who issues septic permits in Platte County?
The Platte County Health Department, for systems in unincorporated Platte County (816-858-2412).
Inspections are where schedules slip.
Get a free quote →Platte County permit search and official resources
- Platte County Planning & Zoning and building permits
- Platte County building permit packet
- Platte County Health Department sewage program
- Missouri DHSS onsite wastewater permitting authority by county
- City of Parkville Community Development
- Platte City building, zoning, planning and codes
- City of Riverside building inspections
- City of Weston building permit application (September 2026)
- City of Northmoor licenses and permits
- Village of Ferrelview applications and permits
- City of Weatherby Lake municipal code (Chapter 500, building codes)
- City of Lake Waukomis municipal code (Chapter 500, building regulations)
- FEMA Community Status Book, Missouri
Simplify Platte County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Missouri. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Platte County sooner?
Let Alliance prepare, file, and track your Platte County permits while your crew stays on the job.
More Missouri permitting guides
Pike County
Read guide →Phelps County
Read guide →Polk County
Read guide →Poplar Bluff Building Permit Guide
Read guide →Pulaski County Building Permit Guide
Read guide →Ralls County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Platte County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.