Skip to main content
County GuideMissouriPulaski County

Pulaski County, Missouri Building Permit Guide

To get a building permit in Pulaski County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Pulaski County lists no building or zoning office of its own; Waynesville, St. Robert and Dixon run their own building permits, and onsite sewage permits come directly from the Missouri Department of Health and Senior Services.

Floodplain: Pulaski County Emergency ManagementSeptic: Missouri DHSSPhone: 573-774-8493
County building permit
None listed by the county
Septic permit
Missouri DHSS, 573-751-6095 ext. 5
Waynesville new home
$0.10 per sq ft, $150 minimum
Fort Leonard Wood
Federal military reservation

Rural Pulaski County has no county building department: the county’s list of offices runs from the assessor to the treasurer and includes emergency management, but no building, planning or zoning office. Inside Waynesville, St. Robert and Dixon, the city issues building permits, and onsite sewage permits anywhere in the county come from the state health department’s onsite program. Building in a mapped flood zone on county land goes through the county’s floodplain administrator at Emergency Management (573-774-8493).

Pulaski County building department: who handles permitting

The County Commission sits in the courthouse at 301 Historic Rt. 66 E., Suite 101, Waynesville (573-774-4701), and meets on Mondays and Thursdays from 9:00 to 10:30 a.m. None of the county offices it lists handles building permits. Fort Leonard Wood, which the county’s own history notes became a permanent military reservation in 1958, is federal land outside the city and county permit offices below. Town populations are Census Bureau Vintage 2025 estimates.

Short on time to read all of this?

Get a free quote →
Building permits in Pulaski County’s towns
PlaceWho permits building work
St. Robert (5,602)City Building Department, 194 Eastlawn Ave., Suite A; 573-451-3319. Enforces the 2006 International Building, Residential and Plumbing Codes and the 2005 National Electrical Code
Waynesville (5,558)City Building Department, 100 Tremont Center; 573-774-6009. Enforces the 2006 International Building and Residential Codes and the 2005 National Electrical Code
Richland (1,558; 74 in Laclede and 105 in Camden County)The published sources do not say; the city has a Planning & Zoning Commission and a Board of Adjustments. City Hall 573-765-3532
Dixon (1,222)The City Clerk issues permits on the City’s General Build Permit Application; City Hall and Public Works, 305 S. Elm St.; 573-917-4501
Crocker (919)The published sources do not say; ask the city

City permit fees in Pulaski County

Waynesville: the City’s General Building Permit Application covers remodels, upgrades, fences and accessory buildings, and a separate New Construction Permit Application covers new homes and commercial buildings. Under section 500.020 of the city code, a one- or two-family home is charged $0.10 per square foot of gross floor area, with a $150 minimum; unfinished basements and garages are not counted. Building without a permit is an ordinance violation with a fine of up to $500.

St. Robert: the Building Department’s fee schedule (Ordinance 2166, last updated December 2023) prices houses and duplexes by total valuation: no fee up to $2,000, $35 up to $10,000, $50 up to $20,000, and above that $50 plus $2 for each additional $1,000. Home plans carry a $10 review fee; plan review for new non-residential buildings is done by the International Code Council at the developer’s expense.

Not sure this scope needs a permit?

Get a free quote →

Dixon: the 2024 application lists $25 for most jobs, including remodels, decks, sheds, fences, re-roofing, pools and electrical, plumbing or mechanical work, $100 for new construction, and $250 each for a water or sewer tap. The city may require a performance bond, and structures must sit at least 25 feet from the roadway. Section 500.030 of the city code exempts ordinary repairs and minor alterations that involve no change to major structural parts, or that cost no more than $2,000.

Septic and flood rules on county land

Septic systems: the Pulaski County Health Center (104 Ashley May St., Waynesville; 573-774-3820) takes complaints and questions, but it states that the Missouri Department of Health and Senior Services is the regulatory authority for onsite systems in the county. Apply to DHSS directly: request an application number through its online request form, or call 573-751-6095, extension 5. DHSS notes that some single-family residential lots may be exempt from permitting, and that work should not begin until a permit has been issued or the exemption confirmed. DHSS suspended its onsite permit application fees on August 28, 2026, after a change to RSMo 701.046, and has not set an end date; the suspension lasts until new fee standards take effect.

Floodplains: Pulaski County takes part in the National Flood Insurance Program, with maps dated May 3, 2010. SEMA’s directory lists the county floodplain administrator at the courthouse, 301 Historic 66 E., Suite 101 (573-774-8493). Richland, St. Robert and Waynesville also take part and have their own floodplain contacts; FEMA lists Dixon among communities not in the program, and Crocker does not appear.

Rather talk it over?

Call 1-855-478-4290 →

Building in Pulaski County, step by step

1. Confirm where the site is

Check whether the lot is inside a city, on unincorporated county land or on Fort Leonard Wood.

2. City permit

In Waynesville, St. Robert or Dixon, file the city’s building permit application before work starts.

3. Septic permit

Without public sewer, request a DHSS application number and use a state-registered installer.

4. Flood zone check

On county land in a mapped flood zone, contact Emergency Management before building.

Missouri building code

Missouri has no mandatory statewide building code for private construction: a county, fire protection district or municipality may adopt one (usually by reference under RSMo 67.280), and in parts of the state none has. Building codes in Missouri

Pulaski County permit FAQs

Does Pulaski County issue building permits?

The county lists no building, planning or zoning office. Building permits come from the cities, and on unincorporated land the county role is floodplain review in mapped flood zones.

Rather not deal with the Pulaski County building department?

Get a free quote →

Who issues septic permits in Pulaski County?

The Missouri Department of Health and Senior Services, through its onsite wastewater program (573-751-6095, ext. 5). The county health center refers permitting to DHSS.

How much is a building permit for a new house in Waynesville?

$0.10 per square foot of gross floor area, with a $150 minimum. Unfinished basements and garages are left out of the square footage.

Which building code does St. Robert use?

Its city code adopts the 2006 International Building, Residential and Plumbing Codes and the 2005 National Electrical Code. The Building Department is at 194 Eastlawn Ave. (573-451-3319).

Do I need a permit for a small repair in Dixon?

Not for the ordinary repairs and minor alterations exempted by section 500.030 of the city code: work with no change to major structural parts, or costing no more than $2,000. Most other jobs cost $25 on the city’s application.

Does the county handle permits on Fort Leonard Wood?

No. Fort Leonard Wood is a federal military reservation, separate from the county and the cities.

Want this handled start to finish?

Get a free quote →

Pulaski County permit search and official resources

Simplify Pulaski County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Inspections are where schedules slip.

Get a free quote →

Alliance Permitting is a permit documentation and submission company in Missouri. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Pulaski County sooner?

Let Alliance prepare, file, and track your Pulaski County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Pulaski County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.